ricerche e progetti per il territorio, la città e l’architettura
ISSN 2036 1602Direttore / Editor in chief Luigi Bartolomei
Università di Bologna | in_bo.unibo.it
2018, n° 13
issue 13
Sérgio Barreiros Proença
Eduardo Delgado Orusco, Reset Arquitectura, Spagna
Esteban Fernández-Cobian
Arzu Gönenç Sorguç
Turchia
Silvia Malcovati
Sara Marini
Alberto Perez Gomez
Claudio Sgarbi
Teresa Stoppani, Architectural Association, Regno Unito
Jacopo Benedetti, Università Roma 3
Alessandro Tognon, Università di Bologna
DA - Dipartimento di Architettura dell’Università di Bologna
ricerche e progetti per il territorio, la città el’architettura. ISSN 2036 1602.
digitale e open access, del Dipartimento di Architettura dell’Università di Bologna.
indice
index
Sebastiano Maltese,
4
Allocation
Rossana Paparella,
Mauro Caini
5
Buildings
Editorial
Kalle Kähkönen
Alessio Pino,
2
1
to Knowledge Management in
36
Giuseppe Montanari
3
Ridracoli
6
con il patrocinio diindice
index
116
11
Analysis and Evaluation
with the Methods Fault
8
nstru
ction Site
7
Multi-Dimensional Risk
Assessment
9
Stefano Politi
Fabrizio Sampietro
10
136
13
Management
12
Built Environment
indice
index
176
17
Framework Agreement and
Bim Approach
Gabriele Novembri,
Antonio Fioravanti
18
A Theoretical Framework
166
Vito Getuli,
Pietro Capone,
16
in_bo New Frontiers of Construction Management Workshop 2018, vol. 9 n. 13
Authors
Autori
real word employment and worked
and Environmental Engineering
American Development Bank on public procurement.
research is related to Management and
participate in several research projects.
Technology.
Management.
building technology and construction to University, where he has been lecturer on building technology and project management. Actually, he is books.
Building Technology and Architecture innovation and sustainability in the building process and product. Author publications
Engineering and Architecture at the The master degree thesis subject supervisor.
Transport Roadstructures (University
historical heritage buildings” (University prevention in buildings” and “Working Florence.
methodology to public procurement general management team and then
Founding partner and head manager
Building Engineer graduated with and sustainable design, currently
and he obtained a Second Level Master’s degree in Sustainable improving his skills about parametric
in_bo New Frontiers of Construction Management Workshop 2018, vol. 9 n. 13
analysis. She was born in Bologna on the 5th
February 1991. She graduated in Architecture and Building Engineering
Alvise Bragadin as supervisor. She
Building Engineering degree in in Architectural Engineering at the TLS surveys and on the application heritage.
building construction, construction site
publications.
research topic concerns Digital Asset Management business process
Model Management and Building implementation.
the Ferrara University.
Enthusiastic about computational design he dedicated primarily to the the management and control in the
designer.
Building Recovery and Technological
Systems Engineering.
Building Engineer passionate by research and teaching and
is on knowledge management and collaborative environments in the digital transition.
single cycle degree in Building Engineering and Architecture at the Architectural Engineering. She teaches
land planning and management.
Architectural and Enviromental
estimate.
Milano she worked on sustainability, energy saving and renewable energy in the built environment. At Unibs she
a user-centered behavioral design approach.
on buildings sustainability (Rating constructions and on the technologies
Bologna.
Building Engineer with MSc thesis
Monitoring. and Economics at Tampere University
interests and activities are addressing
cooperation between stakeholders and
project core team, the appearances
is currently working with construction project systems and innovative private-public procurement process.
Construction Management
Workshop 2018
change in the societies, business environments and in the real estate and construction
the sector can be improved only via large scale systemic changes and innovations.
and devices autonomously communicating each other along the value chain (EU,
co-operate with each-others, and with humans, in real time both inside the production
integrating the two systems, physical and virtual, an intelligent system is created.
technologies.
Kalle Kähkönen
Construction Management Workshop 2018
Europe and America when steam power combined with mechanical production led to
Industry 4.0”, indicate that the
Construction Project Management
Smart Factory Value Chains
construction companies and their suppliers.
Construction Management and Economics
construction and maintenance.
Smart Factory” in construction, aiming at creating a “Smart Building Site
method based on project activities’ understanding, grouping, planning, scheduling and controlling. The second has its intellectual roots in the social sciences, such as
theories.
theory, respectively the work needed to achieve project objectives and work needed to organise and develop project management processes.
Construction Management Workshop 2018
16
management.
amendments to construction management, or, even to reshape it.
1.
Industry 4.0the construction sector.
•
construction site
•
the construction sector
•
process simulation
2.
Project Management & Lean Construction•
•
management•
management in construction projects•
management3.
Building Information Modelling& Built Heritagerenovation and conservation
•
•
and construction process
•
Modelling
•
and virtual reality in construction
4.
Low – impact building site design projects and urban regeneration construction projects.•
•
Low-impact construction site design•
Urban and building-blocks regeneration projects5.
Facility Management & Life Cycle Planning•
•
•
Facility management•
operations•
Quality management•
•
•
7.
Construction site design and Off-site construction•
logistics•
process•
•
8.
Project Management: standards and competences in the construction sector.•
•
standards
•
Real estate development and construction economicspapers. Those address research results or on-going research activities that are clearly
elsewhere as well.
developments to change the built environment sector”.
Furthermore, three industry presentations were given in the workshop. Those were about
Construction Management Workshop 2018
committee.
Ernesto Antonini, Università di Bologna Andrea Boeri, Università di Bologna
Marco Bragadin, Università di Bologna
Lavinia Tagliabue, Università di Brescia
-€
BY NC
Construction Management and Economics
Edition
Construction Management and Economics
.
Management
Van Nostrand
Management
edition.
Construction Management Workshop 2018 M. Bragadin, K. Kähkönen
€
BY NC
A Spatio-Temporal Perspective to
Knowledge Management in the
Construction Sector
allow its introduction in the construction sector. This main topic is integrated with
model with the means to analyse distributed and decentred organisations, and the
the construction sector introducing a spatio-temporal perspective that highlights the
the construction process.
A Spatio-Temporal Perspective to Knowledge Management in the Construction Sector
and consumption process in the construction sector dealing with the
temporal perspective that highlights
time during the construction process.
the schema to represent the typical
analysis, the second chapter introduces
organisation schema. The third chapter proposes a spatio-temporal perspective on knowledge creation and use in
work. decision support systems. Moreover,
proposed an evolutionary perspective
during knowledge and learning processes in the construction sector is
This paper proposes a novel
introduction in the construction sector.
organisation schema highlighted in the
vision based on the cultural historical activity theory. Furthermore, starting
research proposes an interpretation
T
he construction sector is an project, during each phase are generatedsolving capabilities, understanding
project and once it is delivered they
documented with the consequence that knowledge remains stored in the minds
”
on the construction sector, e.g. Kamara,
management strategies. Robinson et al.
“
tract, store, share
and update this knowledge, who are the subjects involved, why do they learn, what do they learn, and how do they learn represent critical questions
where the learning process is introduced
knowledge creation process needs
The middle-up-down approach that they
a knowledge conversion layer between
knowledge construction in his or her mind. Moreover, each subject acts in
the knowledge perception (Tversky,
“ ”
knowledge dynamics. Moreover, the
its analysis and integration making it an ideal candidate to promote the discussion in the research community. The knowledge base layer represents the place where the knowledge can reside and where it can be categorised
as a whole. The individuals acting in the team project level can acquire and
the business system level in a complete
the same way, the knowledge created in the project level is interpreted in
management in the knowledge base
how knowledge can be converted
crucial point. The most popular model
•
•
•
•
Socialisation is based on direct interaction between individuals that
usually with analogical and practical means.
because there is a change in time and
when tacit knowledge is shared, it still requires to be decoded by individuals
and combine knowledge through
meetings, and computer networks. The
adding, combining and categorising
knowledge conversion process, Roos
mechanism is required.
in_bo
documents, graphical representations, or stories.
S
the above-mentioned principles cannot be directly applied. The temporary aggregation between clients, designers,
and the other stakeholders makes
hierarchical roles and consequently
processes. Furthermore, the conversion processes, that represent the learning activity, needto be managed in a cross
with other partners that are seen as competitor entities.
organisation schema proposed
representation, the business system level
level and the knowledge generated by the subjects as a whole at the team project level highlighting its volatility
companies that can have long histories
knowledge conversion model proposed
down approach (Engeström, Miettinen,
is in contrast with the typical project
societal and interpersonal relations in a
environment.
mediation. According to Engeström and
mediation idea, is commonly represented
connection between subject (“stimulus”
this schema, individuals and society cannot be understood without their mutual interaction and cultural means. The second generation, based on the
A Spatio-Temporal Perspective to Knowledge
Figure 4:
centred on his or her community creating a human activity structure.
highlighting the movement, the evolution
object in the interaction between the
words, “
”.
can include several activity systems.
activity systems in the reviewed
At the business system level, each
business system level highlights the
subjectivity and its interrelation by means
level can be represented as an activity system that collaborate on a shared
interpretation in the construction sector
object is interpreted by each subject in
Moreover, the norms and rules that regulate each activity system at the team project level are generated by the
business system level and the directions
where the construction project is embedded.
This interpretation highlights the
generated during the project activities.
communities and perspectives shape the way in which subjects act at the project level and the way in which they interpret and convert the generated knowledge.
Figure 5 can help in understanding the organisational structure in construction projects and the interactions between subjects, it is not able to capture the spatial and temporal distribution that characterise the construction process.
these dimensions. Analyse the spatial
represents a critical point to understand
one place to another and while it moves
Figure 6 reports a qualitative
in the construction process. The graph
processes. The proposed representation includes three locations, namely construction site (i.e. the place where
product (i.e. the construction product
this last is designed and monitored and its components are designed, produced
indicates the time correspondent to the
process, namely design, construction, and operation and maintenance. The
especially in the construction site, there
the construction site is progressively
can be seen as longer than it is in the
the operation and maintenance phase
requirements can be converted in an
stored and used through digital tools. For
dimension. These include the use in
regulatory knowledge through open
possible ones that can be proposed by
During the construction phase, the
construction phase are generated problem solving, know-how, know-what
tacit and its collection and transmission
in_bo A Spatio-Temporal Perspective to Knowledge
work is subcontracted to various trade contractors on a competitive tendering
phase the interaction between designers, engineers, clients, authorities, contractor, and subcontractors produce a dynamic
business level where can be established techniques and technologies to document this knowledge asset.
The operation and maintenance is distributed in a long time span. Furthermore, once the design and construction phase is concluded, it is
interested in the collection, management,
other sectors, like the automotive one,
collector in all phases including design,
This paper proposes a critical analysis
possible integration in the construction sector. The above-mentioned paradigm presents several issues
cultural basis can hinder the principles
Figure 6: A spatio-temporal perspective in knowledge generation and use
stakeholders involved in a project,
organisational schema including the societal and cultural aspects derived
The author argues that a spatio-temporal perspective must accompany an organisational vision on knowledge
proposes a qualitative graph that can
creation and consumption during the construction process.
means and environments supported by digital processes and instruments represents one main area in the
related to both collaborative and KM environments. The proposed schema
between the involved stakeholders to
schema answering questions such as how can we optimise the integration
Moreover, a quantitative evaluation related to the proposed spatio-temporal
, E., and E.
-, Bhargav-, and Lauri
Automation in Construction
, Abhijeet, Salman , and Shreekanth , and Robert Audit.” struction -Research Interaction , and R-L .
, Edmund, and Stephanie . Beha
, Andreas, and Mike
and M.
, Abdul Samad, and Anssi
, edited by Abdul -, Lauri-, and Ruben
-Engineering, Construction and
through Web Map-Based Knowledge Manage-in Taiwan.” Automation Manage-in Construction
, J. , T. , and
S.
-EWork and EBusiness in ,
.
-,
. Barcelona, Spain.
Management in the Architecture, Engineering and -ve.”
M. , and Ahmed M.
-, and L. -New Business Landscape
, D.J., and D.M. Creating
, Amos, and Daniel
, Anastasiya, and Alain Automation in Construction
, Auto mation in Construction
in_bo A Spatio-Temporal Perspective to Knowledge C. Mirarchi
€
BY NC
Cost-Oriented Tool for Life Cycle
Planning
Alessio Pino
M M
one parameter, in order to guide designers towards choices that are consistent with
depreciation method.
between maintenance and economic value in a building, is also caused by the issuesin predicting with precision
uncertainty on determining the service
position on the building, constructive
on a component can change deeply
variation might apparently seem an unreachable goal.
and evaluations, estimated the mean
components, in presence or in absence
directly to evaluate the most convenient maintenance activity, as it was obtained
approach provides the suggestion to obtain similar values by carrying out
two opposite scenarios.
The other element is constituted by an encouraging research carried out by which the consequences related to the
proposed an application on medical
Their approach consisted in setting the periods between interventions and
economic incomes.
compute the negative consequences
and suggested a model in which the
taken into account. This makes it less realistic, as even with the same costs,
between maintenance and building
E
very year, the building sector is phenomenon which can be attributed tobecoming more and more relevant in comparison to new constructions,
shown several signals in the last decades.
cost, while management costs, which include maintenance as well, constitute a much more relevant share.So, together with the less and less consistent
to state that, in order to reduce the cost
in intervening on a component to
substituting it.Following this purpose, muchresearch has been carried out in
restoring intervention considered. This reasoning can be applied to any maintenance intervention, and
A to v , it is possible
calculating the economic value related
Av
Av
by the back-discounted residual value
which correspond to the vA
a painting intervention produces a more
less. Moreover, this connection with time is not only in relation to the
interventions that have already been
reasoning cannot be applied in the same way to ameliorative maintenance, as it is not true that carrying it out
produces little increases in it. So, since
in every case, and none has ever been
any component, it is necessary to avoid
takes into account all the interventions
time ti
i i
Aj on a component A at a time ti can Aj Aj(ti i
solution could also be represented by
So, considering a maintenance
k on the component A,
and mathematical models that describe
interventions on those components.
these purposes, and to the possibility
by using tools such as the Factor Method or by comparing the results
evaluations on maintenance choices.
For a given component A, the number
consists, can be named vA. Then, during
Aj A1 A3 An
Aj A1 A3 An
increase changes according to the time
tendency that depends on the typology
paint applied on a plaster covering
years, when there is a drastic decrease v k vA Aj k. r Av
opportune to carry out at the same time works on all the components
cornices and balconies with all their components, coverings, downpipes, gutters, etc.
This means that, while two strategies
those components, their combination
might not too compatible, considering
the global convenience can be noticed
maintenance strategies on the single
solved by applying small adjustments parameter is constituted by the lowest
are not mutually independent parts
•
technological connections, those where two elements are bound to each other, so that it is necessary to intervene on both at the same time.when intervening on plaster, paint
and so an intervention has to be
•
operative connections, related to the convenience to associate interventions on two elements,nature, such as equipment, provisional works, work yard
k, then it results
between the two is indeed the economic
k on that
component.
k
on the component A corresponds to
over time, indicated as Maintenance
k
by an amount that is equal to the
strategy is obtained, and this, named
k
which the evaluations on the economic
based.
As when evaluating the economic
single maintenance strategies on the components that have shown to be
course, this process is on one hand easily applicable, but on the other hand hides other combinations which may have higher synergies.
As it has been shown, technological and operative connections make it necessary to consider the combination
the whole building together, rather than ranking the convenience on the single components separately, to
combinations, is a task which could
•
•
calculating, within a range, the•
combining the single strategies on•
•
ranking the maintenance scena-rios.
-database schema contains the
inter
-intervention, and to the short code that
component on which the intervention is
component is the vertical enclosure,
machinery and provisional works
the costs needed to put them in use are
Aj(ti i
which is used to determine the increase
to the maintenance intervention. Since
maintenance interventions has not been implemented yet, the current one only contains placeholders. The
Every relation also contains additional strings, as many as the technical
can be considered through the strings
equipment and provisional works. The
same year on components that have an operative connection between them.
the unitary cost corresponding to
applies to the global cost a reduction
cost between the two. This appears to
the interventions on components with operative connections.
a Ranking Method script to show a
this parameter.
seemed appropriate to analyse its
mainly conceived as the practical
statements mainly stand as speculative hypotheses, rather than being related
possibility to create similar computing them will be relevant when evaluating
the economic convenience.
v
every time it appears in the sequence, by the quantitative measure that has
Jj
i, as the i
the single increases are summed to spontaneous duration to obtain the
A
produces all the combinations between the arrays containing the previously
others. When calculating the total cost
and operative connections have to be taken into account. While technological connections are mostly present between the elements within components,
components, operative connections contains the attributes related to the
equipment, machinery and provisional
the strings contain data on their
parameters as they are available in the
respectively the unitary costs which have to be multiplied by the quantitative
technical solutions, consisting in only one string whichreports spontaneous duration.
•
•
•
•
solution is necessary to restrict the set
component, to the ones in which the package corresponds to the chosen
combinations corresponding to the
maintenance activity. The computed set
the interventions automatically selected through the package parameter in the
l.
codes and computer languages.
the users. The same principle applies to
which could be indicated in a more open
this would be subordinated, though, to
Although national regulations have
programmed maintenance, and in some local cases have deeply enhanced its
buildings are rarely considered an item
designing maintenance results limited to adapting pre-established patterns to
indeed conceived as an encouragement to carry out quantitative analysis on
planning, in order to choose the most suitable solution.
such apparently quantitatively accurate
anticipated aim, considering that
becoming available and comprehensive
solutions. Despite that, developing
. Real Estate . strategies , , . . metodi e strumenti , , . . , . . 1997. . .
and Land Rent. Applied Mechanics and Materials
. La qualità et al. . . . .T et al.
36
€
BY NC
Unmanned Aerial Vehicle (Uav) and
Building Information Modelling
(Bim) Technologies in Concrete Dam
Management: The Case of Ridracoli
Giuseppe Montanari
D S M E M
concerning volumes, mechanical characteristics, monitoring data, etc., it could be able
technological comparison between traditional topographic instrument and the innovative
important structural elements (i.e.
works (i.e. spillways, a stilling basin,
important elements can be investigated in static and dynamic conditions.
accurate as-built data collection, as
Laser Scanner technique, as employed can be monitored in order to guarantee a
dams is still rare and at an early stage,
A
innovative approaches beside traditional methods.
an inspection by traditional methods. Although a reliable terrestrial survey
in_bo UAV and BIM Technologies in Concrete Dam
uses into the predictive and proactive
milestone managed by Romagna Acque S.p.A.. So it is need to maintain
require an innovative maintenance
preventive one. That needs the adoption
about the dam and building a structural
stresses under several load conditions.
the surrounding topography on which a 3D model can be developed. This phase
structural behavior over time and, thus, the risk progressive levels which have to
be assumed.
The Ridracoli dam, managed by Romagna Acque Società delle Fonti
Ridracoli reservoir is to supply drinking
33Mlm3
.
started in 1975 and it was completed in
reservoir became operational.
The structure. The simple concrete
arch-curved structure, symmetrical with respect to the main section, resting on a
The thickness progressively increases
the base, in line with the arch gravity construction type. The connection
through the inspection galleries midway between two blocks, in a radial direction and repeated several times in order to
Moreover, during the concrete casting
stop elements were placed along the
in the key section the top thickness
the water discharge throughout them
in_bo
is governed by their geometry, with a
3
energy in the stilling basin constructed at
dam. Moreover, the dam has a middle height sluice gate, a bottom sluice gate and a depletion sluice gate.
The survey. The Ridracoli dam has been
between traditional topographic instruments and unconventional
traditional topographic instruments are
aerial photogrammetry. The surveyed
surrounding area at which is associated
the traditional topographic survey
geo-UAV and BIM Technologies in Concrete Dam
Groups
593 3 - picnic area 197 6 - crowning 163 9 - galleries 395 Total really high resolution. They are the basisThe interactive summary, reported in
summary, hyperlinks connect to the
to which the same link is related to. The structure and the surrounding area
and galleries, Fig.3. Tab.1 reports the
in which are reported, respectively, the
was taken and camera settings such
whole dam system.
mechanical characteristics, interactions
The criteria are based on the knowledge
changes. The selection operations are
open source 3D point cloud editing and
point list picking, Fig. 5b. Subsequently,
in which data integration procedure with other data sets, such as design
that, including a volume, are solids by
in_bo
joints, the spillways, the stilling basin
is imported in a FEA (Finite Element
the properties, the parts are assembled and loads, interactions and boundary
investigating the linear and non-linear
to traditional topographic tools, although
over time and cheaper. Moreover, some
accessibility, would require considerable
and management technicians would
possibility to have a photographic record
a base level by which to monitor
UAV and BIM Technologies in Concrete Dam
a predictive and proactive one. The
model, the solid elements developed
properties. Moreover, the position,
instrumentation can be included and
structures such as dams is not able
and a detailed three dimensional
the whole dam system which includes
those which can evolve over time. All
would be merged in the same tool,
the company archives and allowing the
the technicians are involved in, also in
by Romagna Acque Società delle
Education, University and Research
in_bo , Luigi., , , Mattia, and , Republic. , Laura, , Marco, , , Aandrea, and , Engineering. , Silvia, , Marco, and , Andrea. photogrammetry and traditional topographic
, Andrew, , L., , A.,
, Francesco and
.
, Matthias, , Michael, , Frank, and
models created by unmanned aerial systems
Geomatics,
, Kyriacos, , Athos, and
and delay and disruption analysis” Engineering
UAV and BIM Technologies in Concrete Dam
€
BY NC
Ifc-based Maintenance Budget
Allocation
Sebastiano Maltese
some additional attributes may be associated to elements and stored in custom
during new constructions (to prepare the maintenance plan, as required by current
has been employed in order to store
has been associated to components belonging to the same building entity
maintenance interventions. For that
the current maintenance status has Facility maintenance management
some demonstrations have proved the possibility to implement this approach
addresses the issues related to the
T
he built environment is currently characterised by an increasingphysical characteristics,it is more and
hand, the building intended as a physical
physical asset producing and gathering
implementation must be addressed
in_bo Ifc-Based Maintenance Budget Allocation S. Maltese, G. Branca,
Figure 2: Research schema
budget allocation and the prioritisation
approach has been tested on a case
among project stakeholders(Eastman
what concerns the implementation
beginning, FM has been supported by
Maintenance Management Systems
building stocks and their parts into the
has also been promoted through the use
universal approach to the collaborative
buildings based on open standards
regarding the asset during its whole
in_bo
maintenance budgeting and scheduling
this process to other several activities,
during assets operations (e.g. space management, contracting, rent,
maintenance cost (i.e. maintenance
The research is willing to overcome an
be employed, since it can be associated to single elements (e.g.
be
assigned and maintenance scheduled.
how to store maintenance operations
to work on these data. The entity used
research, connected to the by .
a time series (
by using in combination with
the property set ,
which allows to save one or more data with a time stamp (
The methodology depicted in the previous paragraph has been validated
above the ground and one underground.
operational phase. All spaces and main
developed and all data concerning maintenance management and implementation have been collected and
associated to maintenance operations
each component to be maintained (
synthesis reasons,Figure 5represent the
Ifc-Based Maintenance Budget Allocation S. Maltese, G. Branca,
The data inserted in the model thanks
on 73 components surveyed. The total
shown inFigure 6.
A simulation with a budget constraint,
curve related to the total maintenance interventions to be accomplished to
interventions carried out with the DM
in_bo
the case study showed the possibility
Ifc-Based Maintenance Budget Allocation S. Maltese, G. Branca,
to be implemented into a management
market.Moreover, the methodology allows also to reduce the costs related
in_bo
, R. and
Automation in Construction.
Engineers and Contractors. John Wiley and Sons.
,
, S., , J. A. and
, S. and
, X., , D. and ,
mathematical models in building simulation. Automation in Construction , A. K. and Engineering , E. A., , D. J. and Automation in Construction , , F., , S. and , M. , R., , J. and Automation in Construction
Ifc-Based Maintenance Budget Allocation S. Maltese, G. Branca,
€
BY NC
Innovative Approach to the
Rossana Paparella
Mauro Caini
•
•
•
empowering and making the user aware, especially in the management phase, depending
environmental, social and economic
and operational tools, with which the sector can be restarted. Aiming at
integrating renewable sources and
opportunities to relaunch the sector that must be pursued by all means.
prototype project in order to create
low-typologies, involving the user into a
within a pre-constituted grid, its needs,
building, directly related to estimates.
an approach innovative and oriented to
aimed at empowering and making the user aware especially in the management
the relationship between technological
also including this last aspect in the
the initial moment to the building legislation encourages the construction
solutions are widely used. Smart buildings are created when these
systems, managed by supervisory and
a smart building, users are involved
requirements.
Technologies, solutions, materials and
available on the market, but so that
a concrete application it is necessary
means more security, sustainability, accessibility and usability. The demand
and sustainability in construction
T
he European Union pursues and decarbonised energy systemStates will have to adopt measures to achieve the long-term emission target
the housing stock, which accounted emissions
housing stock. Taking into account
renew its building heritage, giving
term renovation strategies will have to have clear and measurable objectives, as well as initiatives to support
Directive also promotes economically
air conditioning systems. Among the objectives pursued are also to underline those that encourage the use
in_bo
REFERENCE GRID F U N C T IO N A L S P A T IA L
Residential type Detached Semidetached Terraced
1 3 5 6 7
1 3 5 6 7
1 3 5 6 7
Day area Living - Kitchen -
Dining Dining Master bedroom 1 3 Single room 1 3 Double room 1 3 1 3 Bathrooms 1 3 Single in Double in ASPEC T Wood Aluminium
Whole ceramic Whole wood
Shielding system Blinds Blackout curtains Shutters 1
TE
CHNICAL
- ENERGY
X-Lam wood Brick
By air Transmittance values
Best values Transmittance
Best values the operation phase is essential to
developed in the various phases that can
1.
2.
3.
quantities to be included in the
4.
once the Revit model has been imported, an instant parametric estimate can be generated.
energy resources in the management
possibly by more descriptive documents, in which, by answering open questions,
completed. The grid illustrated in table
•
•
•
•
to a photovoltaic system with power
in_bo
•
•
between a wooden structure and
The work continued in-depth analysis
have been associated with technological
and its cost calibrated according to the
online estimate.
Following the above logic, the second
the constraints set out above, to make
and technological choices proposed and
meets his needs, but also its cost, thus obtaining a true online estimate. This
directly on the network. This computer system will also allow to control costs
process has been implemented through
used in buildings were created, and the
way has been possible to improve the computation process.
windows and French windows specially designed is shown.
construction elements, are summary
peculiarity is that these schedules,
Thus, ordered abacuses have been
are instantly updated.
possible to generate computations and complete estimates. The work that was
communication between Revit and STR. To do this, we worked in the STR
56
1.
2.
3.
4.
creating the rules, we need to create
will serve as a container to the rules.
5.
necessary to create all the articles
and a price. These are the basic parameters that each article must have. Articles can be added,
paying attention to the hierarchy that commands them. Subsequently
6.
project, it will be possible to import
and, once active, use it.
7.
that is, make sure that STR detect
8.
The imported model is displayed and proceed with the measurements. The measurements must be made by setting the search conditions,have been generated, they will be
9.
have been created.
10.
be used in Revit.
11.
all the rules created are loaded and the automatic estimation
STR generates the Automatic
12.
template has been created and the estimate can be printed and presented.
should show an image in which he can
in_bo
structure.
environmental units, such as living room, kitchen, living-dining room, laundry and power plant, garage and porch.
illustrated in Figure 5.
the cost, on the other hand the designer
semidetached house, Figure 6. The
below. Altitude 6 meter. above sea level,
garage and laundry room and the
living room, kitchen, hallway, bathroom.
bedrooms, a single bedroom, a walk-in closet, a bathroom and a lodge.
MODEL IN REINFORCED CONCRETE AND EPS
Load-bearing perimeter wall and wall
Load-bearing internal wall between heated-unheated rooms
Metal and stone wool structure - 75 mm
Floor on the ground
Mineralised wood wool 35 mm
Windows
Air conditioning
in_bo
The construction techniques, materials
bearing walls considers 16 possible
the minimum transmittance value equal
the heated and non-heated rooms. For
because between environments that have the same temperature does not
The model provides the supporting
and thickness. The package has been
layers, at steady state and at periodic
that the optimal solution is that that
•
•
Load-bearing internal wall•
•
•
•
in_bo
used in design between the heated and unheated rooms (between living room and garage
The model provides the load bearing
which can vary in thickness and thermal
also evaluated.
Kit. The heat pump is equipped with
lower accumulation is the accumulation
provides domestic hot water with a
tank is equipped with a circulation pump
During the design phase it is necessary to make sure that these powers are
the heat pump, which is equipped with
connect to the air-conditioning terminals depart. The smaller air handling unit can
3
system scheme is shown in Figure 7.
according to user needs and aims to
terminals will be installed. Building
•
the AAL system can be connected to cameras and sensors placed in
•
the user the possibility to choose
•
application, it is possible to manage the temperature and humidity in
were held between the suppliers to understand what protocol to use in the communication between the home automation system and the air conditioning system.
•
energy savings. The dimming
already present in natural lighting
•
are elderly or with motor disabilities.
natural ventilation whenever the ambient operating temperature
•
distribute audio and video signals.
•
Since the various system components, as commonly happenssupplier companies, a single AAL touch has been studied, able to dialogue with all the components in order to have a single building management. For this purpose, it
open building automation standard,
logic.
The present work, shows how it is
a smart tool whereby, through an online
technological, as well as its cost. A
subsequent steps. The consequences
that will be installed in the building work,
this approach helps to make the planning
been carried out upstream, with the
, Feneal Uil - , M.,
, M., , J.,
, M., , M., , J.,
,
managers, designers, engineers and contractors. , A., , U., ,
, S., , E., ,
, Architectural
, Energy and strategygroup,
Forum.
€
BY NC
Planning, Scheduling and
Controlling Long Term Projects
The paper will show how a long term project can be controlled using dynamics or
according to the project characteristics and duration.
term is substantially stochastic.
as a project whose duration is more
We dare then to propose a new
•
short termbe calculated with high reliability and a limited contingency margin
•
medium termdurations can change not in a way to impact on the constraint structure
•
long term can change•
project can be adjusted during the
owners and then in the goals to be achieved through the project (in this case, it would probably be better to divide the whole project in several medium term or long term minor
and medium term, this is to say that deterministic methods are not enough.
The most used deterministic method
scheduling are only limited to work start, it becomes quite impossible, or
since there is always something deterministic and, on the other side,
deterministic.
allow us to project the past data towards
The historical data we have are generally not enough, in addition short-term statistical data and indicators are not
•
needed
•
•
Major political or economic events,•
company, normally “short term” means
sheet, “medium term” means within the
while “long term” means beyond the
say that short and medium term are substantially deterministic while long
T
his paper is relevant to long term well as industrial project, however weother, longer term projects.
composed by 15 hydroelectrical projects, 17 power plants (thermoelectric or
Even long term project can be duly kept under control, but we must consider
meaning. Sometimes the owners do not really own the time span they need, in some cases the original budget are estimated lower on purpose in order to get a project decision. This has
important projects. Without those
heavily underestimated at the beginning,
beginning, nobody would make the decision to go on and the world, today, would be poorer.
time and on budget.
Every project goes through a stochastic
in_bo Planning, Scheduling and Controlling Long Term
66
become clearer, this is still a deterministic methods albeit organised into two levels
method, with the possibility to consider some durations with a stochastic approach.
contingencies and work variation can help up to a certain point, however it
due to owner related events or to major political events, as well as to causes
methods, as they are known in the operational research, we would like to
•
either the probability that an
•
the stochastic network creating an equivalent reduced network, that can be managed as deterministic
•
simulation
•
as well as stochastic methods can be
operational research, that is beyond the
allow stochastic routines and add-ons.
quite impossible to make a reliable
adjusted through projected economic
resources needed, whose amount is
as in the overall project budget.
term projects cannot be managed in a
be considered neither in level 1 nor in
those cases, also budgeting becomes stochastic.
cases the best way is to divide it into
motorway or railway projects than can be divided in several sections to be put in operation one by one, being the other sections still not completed or even cancelled. The same has been applied
side, a project like the bridge to connect
divided into sections with the same
would become quite useless.
economic indicators are normally
work processes. Those indicators are quite reliable in the short and medium
and analysing is quite completed and statically correct, but they start
•
that are assumed as a sample has
•
services are varying,
•
the technology evolves,•
equipment evolves too.
maintenance workshop whose contract was stipulated on 1976 and suspended
in_bo
and then to re-negotiate the contract.
When we investigated into the design,
we noticed that
•
the railway signal technology used•
calculated considering that the rails be installed by hand, while the
on mechanical installation
•
installation works had had a sensible increase
the workshop should have been in the
to say, contractor should have been
years, but this consideration was
span suspension bridge with a central
budget was again estimated in about 6
using regression methods and then comparing with the actual data. Some
•
times the estimated cost
•
estimated cost
on the assumption that no major change happens neither in the world
economic system. The same will apply to sensitivity analysis, that makes
A major petrochemical plant in Middle East was composed by 13 process units centred around a steam cracker, 6 utility units and a connecting network
canteen, etc. The project was actually
•
onsite (process units), that were•
offsite (connecting network and•
utilitiescooling water system, steam
•
services (workshops, warehouses, restaurant, emergency toom,was about 6 years, standard workload
the term sub-project was misused. The project controls was based on a project schedule and on a budget, that were
value criterion to compare the planned versus the actual cost. When the project went into delay and then toregister cost overrun, although the assumption was still to use a deterministic method,
constraints as well as the critical path
this is to say that the planning became
that such change was never declared
was necessary to redraw the structure
any sense to keep the process units and to cancel the utilities. Simply, the plant would not work. By this way, the scope
Planning, Scheduling and Controlling Long Term
been better to consider this possibility since the beginning, by introducing
by taking into consideration a more suitable division into autonomously sustainable sub-projects.
term project is a medieval cathedral
To have an idea about how those
a modern project that is more similar to a medieval cathedral than to the projects we are usually taking into consideration in recent times. Thisis
in Barcelona, whose construction
been consecrated by pope Benedict
death, in order to complete his design.
construction had to rely only on private
not any possibility to make a reliable planning, the work packages were
was changed several times, the actual design is not anymore the original one
completed.
“
[2]
The Messina bridge was clearly a long term project, albeit articulated in several subprojects (bridge properly so said, road connection in Sicily, road
not make any sense to complete the bridge without the road connections on both sides.
corresponding to the reality, it would have been better to consider the
subdivided into Project A
•
gasoline hydrogen, LLD•
•
utilities,•
services. Project B•
butadiene, polybutadiene rubber Project C
•
•
has been managed. When the works
were still in the strategic phase. Then,
some years.
A long term project whose scope is quite
time to time the parametres to the
kept under control section by section,
impossible to make any assumption about time and cost, thedesign was
only the willingness to build a cathedral. Like in medieval cathedrals, design
during construction, parts were added
Even now, that the cathedral is already consecrated (business-like, we can say
in_bo
- ,
, Flaccovio
, John W., Kenneth K. editor. , , Marcel, Stuart
, and Eddy
, Alessandro, and Aldo . , Franco Angeli
, Roger, and Donald R. The
Ingegneria Economica, Alinea Editrice , [1] L.it [2] La Sagrada Família is
Notes
Note
Planning, Scheduling and Controlling Long Term
€
BY NC
Multi-dimensional Risk Assessment
and health on workplace topics. “ ”, “ ”, “
Assessment
”, “ ” and “
”.
risk assessment.
Through these indications we can deduce
to be taken to eliminate or reduce risks
legal requirements in regard to system
are to be used, that eliminate or minimise
highlighted
•
•
•
•
•
promotes decent and productive work
the minimum international standards
1.
2.
3.
4.
5.
D
regulations concerning the health and
not yet been adopted by the national one.
many sectors have improved over time
others have remained practically the same
procedures, organisation, health and
out by applying the tools indicated in the
construction site in Milan.
OUTPUTS SHOULD BE
State clearly and precisely what is to be delivered
Measurable
Achievable
Be within resources, skills and competencies, joimtly determined, challengingRelevant
Be linked to the unit workplan and be within your job roleTime bound
complete risk assessment.
assessment documents, it does not mean that written procedures have to
that are clear, and easily understood.
procedures is that they serve as a clear
how the work is done, not just how it
poor match between the procedure and that can be done in practice it will devalue the procedure and others and
is achieved, in a manner that is clear to workers and supervisors, there is a higher chance that it will be complied with and the supervisors will be more
“
”.
To achieve what is indicated in the
an analytical and complete approach
have occurred in the same conditions deeper and more detailed, observing not only the direct causes but also the
indirect ones. Regarding this issue the
1.
2.
3.
recurrence. states that “ ” Since the actions releted to determinein_bo
physical symptoms wich can be seen or sensed. Whilst these symptoms can not be ignored, only the direct preventive
ensure that recurrence is prevented.
workers and employers. The European
this process and to create in 1996 an agency dedicated to this purpose,
EU-anticipating possible new and emerging risks through the European Risk
main topics involved in the research and
Aging workers.
prolonging working lives are important
sensory, decrease due to the natural
began to be evaluated, linked to the ability to support working conditions that can cause physical and psychological
•
•
•
work in noisy environments or in low or high temperature conditions.occupational diseases when they are
the workplace, young people do not have
both physically and psychologically, as
situation they do not have adequate
present danger.
Several European national regulations
” (e.g. “
Materials in the correct Environment to
“
Testo Unico
elaborated in compliance with the
Recently some innovative elements introduced by TUS have concerned the
among the risks also those related to work-related stress, to pregnant workers,
With regard to the management systems, these regulations recall the
should be noted that their application in
limited.
consideration may also vary substantially
•
•
•
•
•
•
•
•
•
•
•
Mechanical and machinery contacts•
Risk assessment, according to a traditional approach, results in a
two-preventive and protective measures necessary to eliminate and reduce the assessed risks are concentrated towards
belong to protective nature and will
connected to an eventual accident (risk
dimensional risk analysis must deal
adequately taken into consideration,
•
vulnerable people, young workers,
•
moreover those that belong to traditional
•
This concept is closely correlated
the substandard act happened or the conditions arose. They are not always
•
•
•
equipment and layout, environment,
must appeal to technical-engineering
with which it was conceived, however,
no adequate case study to measure
would not be possible to determine the
to address these risks by carrying out
workings. For this reason they have
contribute to increase the attention
The case study is based on the
construction site, as he had to have the
detailed and precise planning and
management, especially with regard to
the aspects related to the health and
in_bo
individual measures to those already
•
•
•
•
•
•
lone workersTheir possible presence must induce
supplementary measures, such as
76
adapting them to national regulatory requirements. The criteria with which it
outputs provided by the Deming cycle concepts.
has gone through a systematic, cyclic and dynamic approach that involves the direct managers involved in the
1.
indicates the procedures to be
•
•
•
•
circa•
circa € 3•
6to avoid dangerous repercussions on the
the opportunity to use additional security procedures compared to those established by current regulations, to protect both workers and the
The intervention that has been carried
protective measures relating to all the risks envisaged in the
2.
a.
spatial and temporal planning
evaluating and adopting the preventive and protective measures relating to all the risks
b.
c.
adopted and applied to eliminate
cyclic and dynamic steps.
1.
2.
Work on plant with live electrical3.
4.
5.
6.
7.
Working at height during the intrinsically dangerous working phasesrisks were those that can be attributed
objects. To prevent them it was vital that SSW should be in place.
previously made, as an integrative tool that was considered to be included in the
envisaged. This procedure, already widely used in industrial areas (eg chemical
document, just to point out the cogency
contractors involved.
construction site was a unique tool in the
The criteria with which it was conceived,
•
• • • ••
and to check the quality and quantity
•
The outputs challenging are within•
All the responsible shall sign in the template. The document has a•
the key steps to reviewing the
What is highlighted during the meeting
determines how that job shall be carried
authorised and properly trained people
that these are avoided by using suitable precautions. Those carrying out the job should think about and understand what they are doing and how their work may
also take the necessary precautions which they have been trained to take
responsible.
it is necessary that this instrument
•
it is not regularly applied, because it•
be underestimated by the workersin_bo
due attention.
Register has been compiled, where all
chronological order.
systems are to be applied at a particular
instruction-training session should be done and registered in appropriate
indicated above, but also to respond
•
on site. For these reasons it was considered necessary to assign the
•
done. For these reasons it was considered necessary to assign the
Furthermore, among the peculiarities
has emerged to avoid dangerous
contractors. This will apply equally
another.
dimensional risk evaluation according to parameters comparable with those
analysis. This step would allow a
risk classes and thus lead to a more
The approach used to address the
a multi-dimensional risk assessment
by the companies involved, since its
workers involved.
Minor results were instead made in the
work phases involved, as the contractors have not always managed to respect
•
•
•
•
proper conditions.
by the contractor involved. Despite a
Bologna. . , Bologna. (available .
82
€
€
€
BY NCConstruction Site Planning for the
Reconstruction of a Historic Earthquake
City: the Case Study of L’aquila
Serena Di Marco
Construction Site Planning for the Reconstruction of a Historic Earthquake City: the Case Study of L’Aquila in_bo
INTRODUCTION
I
in_bo Construction Site Planning for the Reconstruction of a S. Di Marco Historic Earthquake City: the Case Study of L’Aquila