Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
AN ARCHITECTURAL SOLUTION FOR A POLITICAL PROBLEM
THESIS BY MICHAEL SNOPKOWSKI
SUPERVISOPROF. GODI
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Transformation of the region in the past century
1917
Ottoman Empire
British Mandate
1917-1948
1948-1967
Post WWII effect
Foundation of the state of
Israel
1967-2014
Post 6 Days War
Foundation of the
Palestinian Authority
Egypt
Ottoman Empire
Saudi Arabia
Saudi Arabia
British Mandate
French MandateEgypt
Egypt
Saudi Arabia
Egypt
Saudi Arabia
Jordan
Syria
Lebanon
Jordan
Lebanon SyriaIsrael
West BankGaza
Israel
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | Scuola di Architettura e Societa | June 2014 | Thesis_A bridge between the West Bank and Gaza | Supervisor_Prof. Alessandro rocca | Student_Michael Snopkowski TIME LINE OF THE TERRITORIAL CONFLICT
1947 1948 1949 1964 1968 1993 2008 1967 1987 2000 2005 united nations decision ends british mandate over the land of israel.
foundation of the state of israel right after the last british troop leaves the territory. the morning after the foundation the independence war starts between israel and its 6 neighbours (jordan, egypt, iraq, syria, lebanon and saudi arabia)
the war ends with a clear geographic separation between arabs and jews. the arabs concentrate in the gaza strip and the west bank including a full control over Jerusalem
foundation of the palestinian liberation organization (plo) which defines for the very first time the arabs who lived in the land of israel as a people, palestinians
the six day starts and the israeli army takes control of the west bank and the gaza strip with its palestinian population. the occupation officially starts
the first israeli settlement was established in the west bank and the gaza strip
the first intifada (literally from arabic the uprising) starts and is characterized by violence events of armed militias against the israeli army and civilians mainly in the occupied territories
peace summit in oslo norway fails
peace summit in camp david failure leads to the second intifada. thousands of casualties for both sides
disengagement from gaza plan ends israeli occupation in the gaza stripe
israeli former prime minister, ehud barak,
says for the first time that a physical connection between the west bank and the gaza strip is required
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Israel maps
Tel Aviv
Egypt
Jordan
Syria
Lebanon
Amman
Beirut
Damascus
Gaza
Netanya Mitzpe RamonJerusalem
HebronHaifa
Eilat Beer Sheva NeblusTel Aviv
Egypt
Jordan
Syria
Lebanon
Amman
Beirut
Damascus
Gaza
Netanya Mitzpe RamonJerusalem
HebronHaifa
Eilat Beer Sheva NeblusPolitecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Israel maps
Lebanon Syria Jordan Egypt Galilee North Coast Central Plain Coast Shfela Negev Desert Golan Heights Tel Aviv Jerusalem West bank Gaza Beer Sheva Eilat35 km
-Ashkelon
Gaza
Kyriat Gat
Sderot
Netivot
Ofakim
Rahat
Kyriat Malachi
Dahryia
Aidna
Tarkumyia
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Borders study | The two barriers
Mediterrenean sea
Egypt
Jordan
Lebanon
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Borders study |barriers comparison
Berlin Wall
46
km long
3,6
m tall
120
cm width
Gaza Fence
81
km long
5
m tall
40
cm width
West Bank Barrier
700
km long
(
462
km is already built)
8
m tall
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Israel and Palestinian problem diagram
Israelis Palestinians
isolation
territorial
discontinuity
poverty
violent
protests
no
future
frustration
economy
decreases
illegal
work
immigrants
border
trespassing
unsecured
feeling
terror
attacks
affected
communities
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Israel and Palestinian problem diagram
isolation
security
hopless
4
,
100
,
000
palestinians
7
,
800
,
000
Israelis
jobless
terror
limitated movement
barriers
economic
growth
opportunity
attraction
mediation
limitless
transportation
culture
exchange
personal
encounters
dialogue
problems of discontinuity
b e i n g t u r n e d i n t o a
symbolic prototypeof
c o e x c i s t e n c e
between the two people
practical solution for both
sides based on economic
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Suggested program
G B T
Gaza Border Terminal
W B B T
West Bank Border Terminal
C E C
CoExcistence Centre
exposition area
learning centre
ethnic food court
coffee shops
confernence rooms
train station
bus station
covered parking
shopping centre
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Route and location hypothesis
designated route
terminals location
terminals location
staright line
zig zag path
or
or
or
or
avoiding populated area
passing thourgh populated area
in urban area
connected to main roads
connected to interchange node
adjacent to populated area
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
General masterplan | actual route
Gaza
Ashkelon
Sderot
Kyriat Gat
Ofakim
Rahat
Daharyia
G B T
Gaza Border Terminal
W B B T
West Bank Border Terminal
C E C
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Elevated road | charateristics
Design Phase
1
initial phase
2
wrapping the pilars
3
breaking the rigid looks using curves
Cross Section
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
GBT | location 1:5000
MAP
K E Y
PLAN
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
WBBT | location 1:5000
MAP
K E Y
PLAN
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
CEC | Location | Actual phase
MAP
K E Y
PLAN
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
CEC | Masterplan | 1:1000
MAP
K E Y
PLAN
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
CEC | The Program | 5 functions
market (shuk)
railway
railway station
learnning centre
offices
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
CEC | Integrating the Program
market (shuk)
railway
railway station
learnning centre
offices
5 functions in 1 building
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem
CEC | The facades
market (shuk)
railway
railway station
learnning centre
offices
Politecnico di Milano | October 2014 | Thesis: architecural solution for a political problem