• Non ci sono risultati.

IMPIANTI FOTOVOLTAICI / PHOTOVOLTAIC PLANTS

N/A
N/A
Protected

Academic year: 2022

Condividi "IMPIANTI FOTOVOLTAICI / PHOTOVOLTAIC PLANTS"

Copied!
8
0
0

Testo completo

(1)

AGGIORNATO IL 14/03/2022

COMMITTENTE / BUYER ANNO / YEAR IMPORTO / AMOUNT DESCRIZIONE / DESCRIPTION

SOCIETA' COOPERATIVA COOP 80 S.c.a.r.l.

2010-2011 300.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 71,775KWP SU TETTI PIANI ZONA PISCINE COPERTE E CENTRALI TECNOLOGICHE.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 71,775KWP ON THE COVERED POOL FLAT ROOF AREA AND TECHNOLOGICAL UNITS.

BOSCHELLO MUSIC STORE SRL

2011 190.000,00 €

IMPIANTO FOTOVOLTAICO ''GRID CONNECTED'' CONNESSO ALLA RETE PER TOTALI 57,82 KWP BOSCHELLO MUSIC STORE VIA G. GALILEI MIRANO (VE).

-

“GRID CONNECTED” PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 57,82 KWP FOR BOSCHELLO MUSIC STORE IN G. GALILEI STREET, MIRANO (VE).

SICE IMMOBILIARE SRL 2012 160.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO ''GRID CONNECTED'' DA 48,96 KWP SEDE SICE IMMOBILIARE VIA LISBONA N. 3 A PADOVA.

-

REALIZATION OF THE 48.96 KWP '' GRID CONNECTED '' PHOTOVOLTAIC SYSTEM FOR SICE IMMOBILIARE HEADQUARTER IN LISBONA STREET N. 3, PADUA.

DIADORA SPORT SRL 2012 289.135,58 €

IMPIANTO FOTOVOLTAICO ''GRID CONNECTED'' DA 130,75 KWP SEDE DIADORA SPORT VIA MONTELLO 80 CAERANO SAN MARCO (TV).

-

REALIZATION OF A '' GRID CONNECTED '' PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 130,75 KWP, DIADORA HEADQUARTER IN MONTELLO STREET N. 80, CAERANO SAN MARCO (TV).

NOVA COOP S.C. 2013 682.860,00 €

N. 4 IMPIANTI FOTOVOLTAICI 'GRID CONNECTED'' PER TOTALI 503,00 KWP SU COPERTURE IPERMERCATI NUOVA COOP DI BORGOSESIA, NOVARA, SANTHIA' E TRADATE.

-

N.4 PHOTOVOLTAIC SYSTEMS WITH A TOTAL POWER EQUAL TO 502,00 KWP ON NOVA COOP HYPERMARKETS ROOFS IN BORGOSESIA, NOVARA, SANTHIA’ AND TRADATE.

SMA SPA 2013 142.000,00 €

REALIZZAZIONE DI UN IMPIANTO FOTOVOLTAICO DA 99 KWP ''GRID CONNECTED'' SULLA COPERTURA DEL SUPERMERCATO SIMPLY SMA SS 45 BIS ANGOLO VIA LAZZARETTO PONTEVICO, BRESCIA (BS).

-

REALIZATION OF A ''GRID CONNECTED” PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 99 KWP ON THE ROOFS OF SIMPLY SMA SUPERMARKET COVER SS 45 BIS IN LAZZARETTO PONTEVICO STREET, BRESCIA (BS).

(2)

AGGIORNATO IL 14/03/2022

NOVA COOP S.C. 2013 183.000,00 €

RETE ''GRID CONNECTED'' PER TOTALI 132 KWP SU COPERTURA PUNTO VENDITA COOP VIA SESTRIERE N. 3 A PINASCA (TO).

-

REALIZATION OF “ GRID CONNECTED” PHOTOVOLTAIC SYSTEMS WITH A TOTAL POWER EQUAL TO 132 KWP ON THE ROOF OF COOP STORE IN SESTRIERE STREET N. 3, PINASCA (TO).

IL TULIPANO SRL 2013-2014 96.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSI ALLA RETE PER TOTALI 68,75 KWP C/O UNITA' IMMOBILIARE ADIBITA A NEGOZIO DI VENDITA AL DETTAGLIO COMUNE DI ODERZO (TV).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 68.75 KWP, FOR A SALES STORE IN ODERZO (TV).

HOFFMAN ITALIA SPA 2014-2015 133.650,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO (MODULI POLY 250 EU CLASSE REAZIONE FUOCO 1 + INVERTER

POWERONE AURORA TRIO) PER TOTALE 99 KWP C/O COSTRUZIONE NUOVA SEDE HOFFMANN ITALIA SPA VIA GERMANIA A VIGONZA (PD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM

(POLYCRYSTALLINE PANELS 250 Wp/EACH EU CLASS REACTION FIRE 1) TOTAL SYSTEM POWER 99 kWp FOR THE NEW HOFFMAN ITALIA SPA HEADQUARTER IN VIGONZA (PD).

NOVA COOP S.C. 2014 135.728,32 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE PER TOTALI 104,00KwP DEL NUOVO PUNTO VENDITA COLLEGNO TORINO AREA EX ELBI.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 104,00 KWP FOR THE NEW STORE IN COLLEGNO TORINO, EX ELBI AREA.

NOVA COOP S.C. 2014 258.405,84 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE PER TOTALI 198,00 KWP DEL NUOVO PUNTO VENDITA C.SO MOLISE N. 7 A TORINO.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 198,00 KWP FOR THE NEW STORE IN C.SO MOLISE N. 7 IN TORINO.

IL TULIPANO SRL 2014 18.300,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSI ALLA RETE PER TOTALI 10,50 KWP C/O NEGOZIO VENDITA AL DETTAGLIO VIA RONCHI DEI LEGIONARI A GORIZIA.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 10.50 KWP FOR A STORE IN RONCHI DEI LEGIONARI (GO).

(3)

AGGIORNATO IL 14/03/2022 FEDERICI IMMOBILIARE

LAVORI SRL

2014-2016 88.809,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 102,00 KWP C/O BRICOMAN ROMA ''CASETTA MISTICI''.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 102,00 KWP FOR A BRICOMAN STORE IN CASETTA MISTICI (RM).

STAFF INTERNATIONAL SPA 2015 34.577,12 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSI ALLA RETE PER TOTALI 27,04 KWP C/O AMPILIAMENTO SEDE CENTRALE VIA DEL PROGRESSO N. 10 NOVENTA VICENTINA.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 27.04 KWP FOR THE STAFF INTERNATIONAL SPA HEADQUARTER IN NOVENTA VICENTINA (VI).

ALI' S.p.A. 2015-2017 72.468,65 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE PER TOTALI 66,56 KWP PRESSO IL COSTRUENDO IPERMERCATO ALI' IN CASALSERUGO (PD).

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 66,56 KWP OF THE ALI’

HYPERMARKET IN CASALSERUGO (PD).

SAN MARCO VETERINARY HOSPITAL SRL

2016-2018 390.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE PER TOTALI 243,00 KWP NUOVO OSPEDALE VETERINARIO PRIVATO E LABORATORIO DI ANALISI - IL PIU’

GRANDE D’ EUROPA A VEGGIANO (PD).

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 243,00 KWP FOR THE NEW PRIVATE VETERINARY CLINIC AND ANALYSIS LABORATORY – (THE LARGEST OF EUROPE) IN VEGGIANO (PD).

FEDERICI IMMOBILIARE LAVORI SRL F.I.L. SRL

2016-2017 114.273,21 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 103,14 KWP C/O FABBRICATO A DESTINAZIONE ALBERGHIERA DENOMINATO ''HOTEL HAMPTON BY HILTON'' NELL'AMBITO DELLA CONVENZIONE PER IL PIANO DI ASSETTO DELLE AREE DENOMINATE ''CASETTA MISTICI'' A ROMA.

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 103,14 KWP FOR THE “HAMPTON BY HILTON HOTEL” IN CASETTA MISTICI (RM).

F.LLI LANDO SPA 2016-2017 144.780,63 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 149,85 KWP C/O NUOVO IPERMERCATO IPERLANDO IN VIGONZA (PD).

-

REALIZATION OF THE PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 149,85 KWP FOR THE NEW IPERLANDO HYPERMARKET IN VIGONZA (PD).

UNICOMM SRL 2016-2017 74.958,50 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 60,48 KWP C/O FABBRICATO ''FAMILA'' SITO NEL COMUNE DI MONSELICE (PD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 60,48 KWP FOR A "FAMILA" STORE IN MONSELICE (PD).

(4)

AGGIORNATO IL 14/03/2022 BRICOMAN ITALIA SRL 2017-2018 64.398,99 €

RETE DA 59,40 KWP C/O NUOVO PUNTO VENDITA BRICOMAN DI MODENA (MO).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 59,40 KWP FOR THE NEW BRICOMAN STORE IN MODENA (MO).

COMUNE DI PIOVE DI SACCO 2017-2018 20.059,99 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 22,14 KWP C/O NUOVO EDIFICIO SCOLASTICO DA ADIBIRE A SCUOLA SECONDARIA DI 1° GRADO “REGINA MARGHERITA” A PIOVE DI SACCO (PD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 22,14 KWP FOR THE “REGINA MARGHERITA” SECONDARY SCHOOL IN PIOVE DI SACCO (PD).

BRICOMAN ITALIA SRL 2017-2018 203.535,50 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 190 KWP C/O NUOVO PUNTO VENDITA BRICOMAN A SAN FIOR (TV) - ''AREA TRA SS13 E VIA PALLADIO''.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 190 KWP FOR THE NEW BRICOMAN STORE IN SAN FIOR (TV).

FRIULAIR S.R.L. 2018 19.264,86 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 9,80 KWP C/O NUOVO LABORATORIO CHILLER - SEDE CERVIGNANO DEL FRIULI (UD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 9,80 KWP FOR THE NEW FRIULAIR SRL CHILLER LABORATORY IN CERVIGNANO DEL FRIULI (UD).

UNICOMM SRL 2018 91.345,05 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 97,20 KWP C/O FABBRICATO “MEGA” SITO NEL COMUNE DI MASERA’(PD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 97,20 KWP FOR A “MEGA” STORE IN MASERA’ (TV).

SLAMP SPA 2018 - 2019 90.000,00 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 84,00 KWP CAPANNONE IN VIA VACCARECCIA A POMEZIA (RM).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 84,00 KWP FOR A “SLAMP SPA” SHED IN VACCARECCIA STREET, POMEZIA (RM).

CEREAL DOCKS S.P.A. 2019 46.806,99 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 46,76 KWP C/O FABBRICATO NEL CONTESTO DELLA COSTRUZIONE ''NUOVA SEDE CEREAL DOCKS SPA'' IN CAMISANO VICENTINO.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 46.76 KWP OF A BUILDING FOR 'CEREAL DOCKS SPA NEW HEADQUARTER IN CAMISANO VICENTINO (VI).

(5)

AGGIORNATO IL 14/03/2022

ARCA SPA 2018 80.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DI POTENZA PARI A 78 KWP C/O FABBRICATO ''CASH & CARRY'' SITO IN COMUNE DI SAN LAZZARO DI SAVENA (BO).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 78 KWP FOR A “CASH & CARRY” STORE IN SAN LAZZARO DI SAVENA (BO).

DIADORA SPA 2018 - 2019 545.650,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO “GRID CONNECTED” DI POTENZA PARI A 527,78 KWP SU COPERTURA CAPANNONE SITO A CAERANO SAN MARCO (TV).

-

REALIZATION OF “GRID CONNECTED” PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 527,78 KWP, ON THE ROOF OF A DIADORA SPA SHED IN CAERANO SAN MARCO (TV).

STILE COSTRUZIONI EDILI SPA

2018 - in corso 82.583,18 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 79,36 KWP C/O NUOVO PUNTO VENDITA BRICOMAN IN VIA PALMIANO A ROMA - MONTE DELLA BRECCIA.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 79,36 KWP FOR A NEW BRICOMAN STORE IN MONTE DELLA BRECCIA – ROME.

F.LLI LANDO SPA 2019 52.988,60 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 38,70 KWP C/O CENTRO COMMERCIALE CON IPERMERCATO “IPERLANDO” DI VEGGIANO (PD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 38,70 KWP FOR THE “IPERLANDO”

SHOPPING CENTER IN VEGGIANO (PD).

TMG IMPIANTI SPA 2019 113.656,96 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 103,00 KWP C/O FABBRICATO INDUSTRIALE SITO NEL COMUNE DI SAN MARTINO DI LUPARI (PD) IN VIA CASTELLANA.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 103,00 KWP FOR “TMG IMPIANTI SPA”

IN SAN MARTINO DI LUPARI (PD).

BRICOMAN ITALIA SRL 2019 - in corso 181.746,20 €

ESECUZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DA 214,21 KWP C/O EDIFICIO PRINCIPALE E DRIVE PER CREAZIONE AREA COMMERCIALE NUOVO PUNTO VENIDTA BRICOMAN DI PERO (MI).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 214,21 KWP FOR A BRICOMAN STORE IN PERO (MI).

UNICOMM SRL 2019 - in corso 112.000,00 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETA DI POTENZA PARI A 109,12 KWP DI UN FABBRICATO ''FAMILA'' SITO IN COMUNE DI CASTIONS DI STRADA (UD).

-

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 109,12 KWP FOR A “FAMILA” STORE IN CASTIONS DI STRADA (UD).

(6)

AGGIORNATO IL 14/03/2022 UNICOMM SRL 2019 - in corso 55.000,00 €

ALLA RETA DI POTENZA PARI A 60,00 KWP C/O FABBRICATO ''FAMILA'' SITO IN COMUNE DI CALDERARA DI RENO (BO) -

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 60,00 KWP FOR A “FAMILA” STORE IN CALDERARA DI RENO (BO).

PELLETTERIE PALLADIO S.R.L. 2019 - in corso 90.349,22 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO CONNESSO ALLA RETE DI POTENZA PARI A 105,60 KWP PRESSO L'IMMOBILE IN COSTRUZIONE SITO NEL COMUNE DI POVOLARO DI DUEVILLE (VI) - VIA LEONARDO DA VINCI SNC -

REALIZATION OF PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 105,60 KWP FOR A BUILDING IN POVOLARO DI DUEVILLE (VI)

UNICOMM SRL 2020 - in corso 76.385,10 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO INSTALLATO SU TETTO PIANO DI POTENZA PARI A 79,86 KWP C/O UN FABBRICATO SITO IN COMUNE DI CASTIONS DI STRADA (UD) VIA NAPOLEONICA CENTRO COMMERCIALE JUST -

REALIZATION OF PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 79,86 KWP, ON THE ROOF OF “JUST”

SHOPPING CENTER IN CASTIONS DI STRADA (UD).

EMMEDUE IMMOBILIARE SRL

2020 - in corso 73.960,40 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 72,96 KWP C/O NUOVO PUNTO VENDITA AD INSEGNA ''FAMILA'' IN PONTE NELLE ALPI VIA DOLOMITI 37 A BELLUNO.

-

REALIZATION OF PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 72,96 KWP, FOR THE NEW “FAMILA”

STORE IN DOLOMITI STREET N. 37 IN PONTE DELLE ALPI (BL).

CINETECA EX GIURIOLO COMUNE DI BOLOGNA

2020 - in corso 198.613,36 €

REALIZZAZIONE IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 166,40 KWP C/O RIQUALIFICAZIONE DELL'EX PARCHEGGIO GIURIOLO IN NUOVA SEDE DEI LABORATORI DI RESTAURO, DELLE AREE DIDATTICHE, DEGLI SPAZI ESPOSITIVI E DELL'ARCHIVIO CONSERVATIVO DELLA CINETECA DI BOLOGNA.

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 166,40 KWP, FOR THE REDEVELOPMENT OF THE FORMER GIURIOLO PARKING IN BOLOGNA (BO).

EURORISTORAZIONE SRL 2020 - in corso 85.000,00 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 99,96 KWP C/O RISTUTTURAZIONE DEL CENTRO COTTURA DI LEGNARO (PD).

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 99,96 KWP FOR THE RENOVATION OF THE “EURORISTORAZIONE” COOKING CENTER IN LEGNARO (PD).

(7)

AGGIORNATO IL 14/03/2022

CDM SRL 2020 - in corso 41.402,34 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 36,26 KWP C/O PALAZZINA UFFICI E ABITAZIONE CUSTODE C/O CDM A CIMADOLMO (TV)

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 36,26 KWP FOR CDM SRL OFFICE BUILDING AND GUARIAN HOUSE.

GECOPRE - GENERALE COSTRUZIONI E PREFABBRICAZIONE SRL

2021 - in corso 215.442,61 €

ESECUZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 300 KWP C/O CENTRO COMMERCIALE NON ALIMENTARE BRICOMAN IN LOCALITA' TRUNCU IS FOLLAS IN ASSEMINI ELMAS A CAGLIARI

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM WITH A TOTAL POWER EQUAL TO 300 KWP FOR THE BRICOMAN NON FOOD SHOPPING CENTER IN CAGLIARI (CA).

SUPERMERCATI TOSANO CEREA SRL

2021 - in corso 70.000,00 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 86,80 KWP C/O NUOVO MAGAZZINO

SUPERMERCATI TOSANO A FERRARA (FE) -

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 86,80 KWP FOR THE NEW TOSANO SUPERMARKET WAREHOUSE IN FERRARA (FE)

EMMEDUEIMMOBILIARE SRL 2021 - in corso 40.885,21 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 46,74 KWP C/O NUOVO FAMILA SITO IN COMUNE DI CONSELVE A PADOVA.

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 46,74 KWP FOR THE NEW FAMILA STORE IN CONSELVE (PD)

MARTINI PREFABBRICATI SPA

2021 - in corso 58.968,55 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 60 KWP C/O AMPLIAMENTO DEL PUNTO VENDITA COMMERCIALE CON INSEGNA BRICOMAN DEL COMUNE E DELLA PROVINCIA DI BOLOGNA.

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 60 KWP FOR EXPANSION OF THE BRICOMAN STORE IN PROVINCE OF BOLOGNA.

VINCIANA SRL 2021 - in corso 66.000,67 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA PARI A 70,80 KWP C/O NUOVO PUNTO VENDITA

CASH&CARRY IN VIA BERNARDINO VARISCO 18 A RIMINI (RN).

-

REALIZATION OF A PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 70,80 KWP FOR THE NEW CASH&CARRY STORE IN RIMINI (RN).

INOX MARKET SERVICE S.P.A. 2022 - in corso

612.000,00 €

REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO 'GRID CONNECTED'' DA 692,22 KWP PRESSO IL CAPANNONE INDUSTRIALE IN VIA CLAUZETTO 26 A SAN VITO IN TAGLIAMENTO (PN)

-

REALIZATION OF A “GRID CONNECTED” PHOTOVOLTAIC SYSTEM, WITH A TOTAL POWER EQUAL TO 692,22 KWP ON THE TOP OF INDUSTRIAL SHED IN SAN VITO AL

TAGLIAMENTO (PN)

(8)

AGGIORNATO IL 14/03/2022 PARCO DEL BRENTA SRL 2022 - in corso 578.963,90 €

C/O CAPANNONE INDUSTRIALE SITO IN VIA BELLUNO A VIGONZA (PD)

REALIZATION OF PHOTOVOLTAIC PLANT 68.40 KWP C / O INDUSTRIAL SHED SITE IN VIA BELLUNO IN VIGONZA (PD)

Riferimenti

Documenti correlati

Per condizioni di impiego diverse (disposizione del carico e appoggi) i valori di carico e di freccia si ottengono moltiplicando “Q” e “f Q ” per i fattori corrispondenti

It is essential an appropriated control of the power factor of the inverter grid connection to get the maximum efficiency in the photovoltaic agent, and the synchronization

Improving single encapsulating materials, such as coated tempered glass, low cut-off EVA film and high reflectivity white back sheet have great effect on the

1) The power quality test points should be located in PV power stations and outlets and public connection points. 2) Check the capacity of the photovoltaic power station actually

Dipartimento di Ingegneria dell’Informazione, Ingegneria Elettrica e

[r]

Dato che una frequenza di riconfigurazione fissa potrebbe essere disallineata con la velocità di transito di un'ombra sul campo fotovoltaico, nella Tesi viene proposta una procedura

The reconfiguration of the electrical connections among the panels leads to maximize the performance of the photovoltaic systems but it requires additional hardware and it