MUSEUM

VENTILATION DUCTS LAYOUT

17

A

leppo

C

ultural

C

enter

Aleppo Cultural Center

Lorenzo Maria De Vecchi

Nicolò Sciolti

Vittorio Vaghi

897579

897097

897169

AIR SUPPLY AIR EXTRACTION 0 5 10 20 m

PLAN - 5,50 m 1:500

Air change due to UNI 10339

Function Area (m2) Expected crowding factor (f) l/s each person vol/h A*f  Air change

6 , 7 5 2 7 6 3 3 6 3 , 0 0 2 1 1 n o it i b i h x E 4 0 3 8 5 6 s m o o r t s e R TOTAL= 7561,6 AIRCAR  MA10  Q150 AIRCAR  MA10  Q200 Q max Duct A 0 9 1890,4 Duct B 2 8 1890,4 Duct C 0 9 1890,4 Duct D 0 9 1890,4 Q 7561,6 m3/h Airflow w= 9,0 m/s Speed h 0,50 m h dimension h 0,35 h dimension w= 5 m/s Speed Q 2,10 m3/s A 0,23 m2 Section L 0,47 m b dimension

D 0,545 m hydraulic dim. Equ

Dce= 0,528 m circular dim. Equ

Q 1890,4 m3/h Airflow

Q 0,53 m3/s

A 0,11 m2 Section

L 0,30 b dimension

D 0,366 m hydraulic dim. Equ

Dce= 0,354 m circular dim. Equ

4 main ducts DUCTS SIZING:

Rectangular section duct: Equ. circular section duct:

rectangular section duct: Equ. circular section duct:

0,37

0,35

0,30

Ducts sections: Equ Circular section:

Equ. rectangular section: Ducts and provided devices

Politecnico di Milano 2018/2019

School of Architecture Urban Planning Construction Engineering

MSc in Architecture - Building Architecture

Master Thesis

Supervisor: Prof. M. G. Folli

WATER SYSTEMS -

WASTE WATER DRAINAGE SYSTEM

WASTE WATER DRAINAGE SYSTEM:

System II

VENTILATION SYSTEM CONFIGURATION:

Primary ventilated system configurations

DRAINAGE BRANCHES TYPE:

Ventilated discharge branch configurations

1 wash basin

2 wc

3 branch discharge pipe

4 stack

5 stack vent

6 branch ventilating pipe

7 drain

1 2 3 4 5 7 6

EN UNI 12056-2

1

2

3

Ventilated discharge branches

Branch/Vent (DN)

Stack and Stack Vent (DN)

Primary ventilated discharge stacks

1

2

3

PIPES DIMENSIONS

60/30

80

1

2

3

50/30

70

60/30

70

WATER SUPPLY

EN UNI 806-3

System with bottom-up water supply and hot water preparation at bottom level

1 supply

2 recirculation

2 1

RAINWATER DRAINAGE SYSTEM

1

2

3

1

2

3

EN UNI 12056-2

AVERAGE PRECIPITATION

Precipitation in Aleppo amounts to 330 mm per year,

and occurs between October and May, but it's

moderate only in winter, while it never rains from June

to September. During winter, from December to

February or early March, cold spells, lasting a few

days, with snow and frost, may occur. During some

years, the rains from December to March can be

abundant.

Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year

Prec.(mm) 60 50 45 35 20 2 0 0 2 20 35 60 330

Days 13 14 10 7 4 1 0 0 1 4 7 11 72

Channel type

Vertical pipe choice

Pipe DN

Number of pipes

Distance between pipes

10x10 cm

100

4

29,4 m

drain stack vent stack branches drain branches stack drain stack vent branches stack

Calculation of Library toilet facilities

18 LU (1,8 l/s)

Calculation of Museum toilet facilities

30 LU (3 l/s)

Calculation of Cafe toilet and kitchen facilities

10 LU (1 l/s)

DN 26

DN 20

DN 32

Riferimenti

Documenti correlati

Assessment of the conservation status of the mat-forming lichens Cladonia subgenus Cladina in Italy, Plant Biosystems - An International Journal Dealing with all Aspects of

Practical attack graph genera- tion for network defense.. In Computer Security Applications

This chapter provides a summary of the experimental results of the hollow circular cross-section specimens, including damage description and test data measured during

Falling of horizontal cladding panels, one of the main problems encountered in the industrial structures in Emilia hit by the earthquake, demonstrates how, during the

Firstly existing formulations for modifying the moment-rotation plastic hinges of damaged RC columns as a function of damage are analyzed, and then experimental based formulations

Two main European research projects are conducted in these years on precast buildings: the SAFECAST (Toniolo, 2012) and the SAFECLADDING projects. The first project was concluded in

Other studies have applied LCA technique to study the environmental impact of local materials construction; for example (Jönsson, Tillman et al. 1997) compared the

The risk domain concerning High centralisation of the national media system (G4) includes indicators that assess the estimated reach and audience share of regional and local