Duration
KEY PROJECT MILESTONES & TASKS
KEY PROJECT MILESTONES & TASKS
591 01-Jun-07 A 02-Feb-10 01-Jun-07 31-Aug-09GENERAL
GENERAL
90 01-Jun-07 A 03-Mar-08 01-Jun-07 01-Oct-07TGADBD10M1 NOTICE TO PROCEED 0 01-Jun-07 A 01-Jun-07
TGADBD06M1 PROJECT MANAGEMENT START ENGINEERING 0 01-Jun-07 A 01-Jun-07
TGADBD11M1 DECISION FOR DISASSEMBLED GT/ GENO TRANSPORT (4mos before ExW)
0 03-Mar-08 01-Oct-07
BLOCK 1 GT 11
BLOCK 1 GT 11
368 01-Jul-08 29-Nov-09 01-Jul-08 01-May-09TGADBD20M1 UNIT 1 GT, GENO & MECH AUXILIARIES EX WORKS 0 01-Jul-08 01-Jul-08
TGADBD22M1 UNIT 1 GT ELECTRICAL & I&C EQUIPMENT EX WORKS
0 01-Jul-08 01-Jul-08
A50520 GAS TURBINE MHO (CFR Thessalonika) 0 30-Oct-08
TGADBD26M1 UNIT 1 GT MECH AUXILIARIES ERECTION START 0 13-Nov-08 31-Aug-08
TGADBD25M1 UNIT 1 GT & GENO ERECTION START 0 13-Nov-08 31-Aug-08
TGADBD27M1 UNIT 1 GT ELECT & I&C AUXILIARIES ERECTION START
0 21-Nov-08 07-Sep-08
TGADBD31M1 UNIT 1 COLD COMMISSIONING START 0 06-Mar-09 21-Dec-08
TGADBD32M1 UNIT 1 GT FIRST IGNITION 0 17-Sep-09 20-Feb-09
TG94MS15M1 SYNCHRONIZATION OF GAS TURBINE UNIT 1 0 18-Sep-09 02-Mar-09
TGADBD33A1 UNIT 1 GT HOT COMMISSIONING 70 21-Sep-09 29-Nov-09 20-Feb-09 01-May-09
TGADBD34M1 UNIT 1 STEAM BLOW START 0 24-Sep-09 02-Mar-09
BLOCK 1 ST
BLOCK 1 ST
383 14-Aug-08 02-Feb-10 14-Aug-08 31-Aug-09TGADBD35M1 BLOCK 1 ST, GENO & MECH AUXILIARIES EX WORKS
0 14-Aug-08 14-Aug-08
TGADBD36M1 BLOCK 1 ST ELECTRICAL & I&C EQUIPMENT EX WORKS
0 14-Aug-08 14-Aug-08
A50530 STEAM TURBINE MHO (CFR Thessalonika) 0 13-Dec-08
TGADBD40M1 BLOCK 1 ST, GENO & AUXILIARIES ERECTION START
0 28-Dec-08 15-Oct-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TGADBD43M1 BLOCK 1 ST & AUXILIARIES COLD COMMISSIONING
START
0 27-Apr-09 12-Feb-09
TGADBD44M1 BLOCK 1 FIRST STEAM TO STEAM TURBINE 0 09-Nov-09 28-Apr-09
TGADBD45M1 BLOCK 1 ST FIRST SYNCHRONIZATION 0 14-Nov-09 05-May-09
TGADBD50A1 BLOCK 1 ST / WSC OPTIMIZATION 45 14-Nov-09 29-Dec-09 14-Jun-09 22-Jul-09
TG95MS04M1 SYNCHRONIZATION OF STEAM TURBINE UNIT 1 0 16-Nov-09 06-May-09
TGADBD51A1 BLOCK 1 PERFORMANCE TEST 15 29-Dec-09 13-Jan-10 22-Jul-09 01-Aug-09
TGADBD52A1 BLOCK 1 RELIABILITY RUN 20 13-Jan-10 02-Feb-10 01-Aug-09 31-Aug-09
TG96MS01M1 PAC / COMPLETION PERFORMANCE TEST 0 02-Feb-10 31-Aug-09
TGADBD60M1 COMMERCIAL OPERATION BLOCK 1 CC 0 02-Feb-10 31-Aug-09
PAYMENT MILESTONES EXTERNAL
PAYMENT MILESTONES EXTERNAL
591 07-Jun-07 A 02-Feb-10 07-Jun-07 31-Aug-09GENERAL
GENERAL
591 07-Jun-07 A 02-Feb-10 07-Jun-07 31-Aug-09TGPMMS01 ORDER PLACEMENT FOR MAIN EQUIPMENT (GT/
ST)
0 07-Jun-07
A
07-Jun-07
TGPMMS02 FIRST ISSUE OF GT & ST P&ID'S 0 13-Sep-07
A
13-Sep-07
TGPMMS03 RECEIPT OF GT ROTOR FORGINGS 0 17-Dec-07 A 17-Dec-07
TGPMMS04 GT ROTOR WELDING 0 24-Feb-08 24-Feb-08
TGPMMS05 GT ROTOR SPIN PIT TEST 0 25-Apr-08 25-Apr-08
TGPMMS06 GT THERMAL BLOCK EX WORKS 0 01-Jul-08 01-Jul-08
TGPMMS07 ST THERMAL BLOCK EX WORKS 0 14-Aug-08 14-Aug-08
TGPMMS08 PAC (PROVISIONAL ACCEPTANCE) 0 02-Feb-10 31-Aug-09
PAYMENT MILESTONES INTERNAL
PAYMENT MILESTONES INTERNAL
208 01-Jun-07 A 14-Aug-08 01-Jun-07 14-Aug-08GENERAL
GENERAL
57 01-Jun-07 A 31-Dec-07A
01-Jun-07 31-Dec-07
TGADBJ01M1 ISSUE OF FINAL NTP CORRESPONDING TO TPS 0 01-Jun-07 A
01-Jun-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TGADBJ02M1 ISSUE OF ORDERS FOR GT AND ST 0 07-Jun-07
A
07-Jun-07
TGADBJ05M1 START OF MECH WORKS - BLOCK 1 ST ROTOR 0 03-Sep-07 A 24-Aug-07
TGADBJ06M1 COMPLETE WELDS- GT ROTORS - UNIT 1 0 31-Dec-07
A
31-Dec-07
BLOCK 1 GT 11
BLOCK 1 GT 11
119 04-Jan-08 A 01-Jul-08 04-Jan-08 01-Jul-08TG93MS04M1 DELIVERY OF GT ROTOR FORGINGS 0 04-Jan-08
A
04-Jan-08
TG93MS03M1 DELIVERY OF HGP COMPONENTS FOR GT 0 11-Jan-08
A
11-Jan-08
TG93MS05M1 EX- WORK THERMAL BLOCK 0 01-Jul-08 01-Jul-08
TG94MS03D1 EX- WORKS OF GT GENERATOR UNIT 1 0 01-Jul-08 01-Jul-08
BLOCK 1 ST
BLOCK 1 ST
0 14-Aug-08 14-Aug-08 14-Aug-08 14-Aug-08TG95MS03M1 STEAM TURBINE EX- WORKS 0 14-Aug-08 14-Aug-08
QUALITY ASSURANCE AND CONTROL
QUALITY ASSURANCE AND CONTROL
564 16-Nov-07 A 23-Feb-10 16-Nov-07 21-Sep-09GENERAL
GENERAL
564 16-Nov-07 A 23-Feb-10 16-Nov-07 21-Sep-09TGPMEM16M1 CUSTOMER SATISFACTORY SURVEY 1 (ENGINEERING)
0 16-Nov-07 A 16-Nov-07
TGPMEM17M1 CUSTOMER SATISFACTORY SURVEY 2 (PROCUREMENT)
0 12-Dec-08 29-Sep-08
TGPMEM18M1 CUSTOMER SATISFACTORY SURVEY 3 (ERECTION) 0 21-Sep-09 23-Feb-09
TGPMEM19M1 CUSTOMER SATISFACTORY SURVEY 4 (COMMISSIONING)
0 23-Feb-10 21-Sep-09
TGPMEM20M1 CUSTOMER SATISFACTORY SURVEY 5 (WARRANTY)
0 23-Feb-10 21-Sep-09
PROJECT SCHEDULING & PROGRESS REPORTS
PROJECT SCHEDULING & PROGRESS REPORTS
0 27-Jul-07 A 27-Jul-07 A02-Aug-07 02-Aug-07
GENERAL
GENERAL
0 27-Jul-07 A 27-Jul-07A
02-Aug-07 02-Aug-07
TGMDL001D1 OVERALL TIME SCHEDULE (OTS) 1ST ISSUE 0 27-Jul-07 A
02-Aug-07
OVERALL QUALITY ASSURANCE
OVERALL QUALITY ASSURANCE
292 26-Aug-08 08-Oct-09 26-Aug-08 13-Mar-09BLOCK 1 GT 11
BLOCK 1 GT 11
0 26-Aug-08 26-Aug-08 26-Aug-08 26-Aug-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TGMDL011D1 SHOP TEST CERTIFICATES - GT 0 26-Aug-08 26-Aug-08
BLOCK 1 ST
BLOCK 1 ST
280 11-Sep-08 08-Oct-09 11-Sep-08 13-Mar-09TGMDL012D1 QUALITY DOCUMENTATION ST 0 11-Sep-08 11-Sep-08
TGMDL013D1 CERTIFICATE OF CONFORMITY ST 0 08-Oct-09 13-Mar-09
MANUALS & TRAINING
MANUALS & TRAINING
475 01-Aug-08 27-May-10 31-Jul-08 21-Dec-09BLOCK 1 GT 11
BLOCK 1 GT 11
339 09-Feb-09 27-May-10 24-Nov-08 21-Dec-09TGMDL021D1 OPERATION & MAINTENANCE MANUALS GT - 1ST ISSUE
0 09-Feb-09 24-Nov-08
TGMDL022D1 O&M MANUALS FINAL ISSUE GT (AFTER RED CORREX)
0 27-May-10 21-Dec-09
BLOCK 1 ST
BLOCK 1 ST
475 01-Aug-08 27-May-10 31-Jul-08 21-Dec-09TGMDL023D1 TRAINING DOCUMENTATION ST - 1ST ISSUE 0 01-Aug-08 31-Jul-08
TGMDL024D1 OPERATION & MAINTENANCE MANUALS ST - 1ST ISSUE
0 14-Apr-09 30-Jan-09
TGMDL025D1 O&M MANUALS FINAL ISSUE ST (AFTER RED CORREX)
0 27-May-10 21-Dec-09
EQUIPMENT & TRANSPORTATION LIST
EQUIPMENT & TRANSPORTATION LIST
135 23-Nov-07 A 01-Aug-08 22-Nov-07 31-Jul-08BLOCK 1 GT 11
BLOCK 1 GT 11
0 01-Jul-08 01-Jul-08 01-Jul-08 01-Jul-08TGMDL032D1 EQUIPMENT TRANSPORTATION LIST - GT 0 01-Jul-08 01-Jul-08
TGMDL031D1 UNLOADING OF GT & GENERATOR 0 01-Jul-08 01-Jul-08
TGMDL033D1 SPECIAL TOOLS EQUIPMENT LIST - GT 0 01-Jul-08 01-Jul-08
BLOCK 1 ST
BLOCK 1 ST
135 23-Nov-07 A 01-Aug-08 22-Nov-07 31-Jul-08TGMDL034D1 LIST OF SPECIAL TOOLS - ST 0 23-Nov-07
A
22-Nov-07
TGMDL035D1 MAINTENANCE SCHEDULE - ST 0 01-Aug-08 31-Jul-08
TGMDL036D1 WEAR & SPARE PARTS LISTS - ST 0 01-Aug-08 31-Jul-08
ERECTION DOCUMENTATION GENERAL
ERECTION DOCUMENTATION GENERAL
178 01-Jul-08 06-Mar-09 01-Jul-08 22-Dec-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
BLOCK 1 GT 11
BLOCK 1 GT 11
178 01-Jul-08 06-Mar-09 01-Jul-08 22-Dec-08TGMDL041D1 ERECTION INSPECTION & TEST PROGRAM (ITP) 0 01-Jul-08 01-Jul-08
TGMDL042D1 SITE TEST CERTIFICATES 0 13-Nov-08 01-Sep-08
TGMDL043D1 COMMISSIONING INSPECTION & TEST PROGRAM 0 06-Mar-09 22-Dec-08
ARRANGEMENT PLANNING/ TERMINAL POINTS
ARRANGEMENT PLANNING/ TERMINAL POINTS
157 24-Aug-07 A 01-Jul-08 28-Sep-07 01-Jul-08BLOCK 1 GT 11
BLOCK 1 GT 11
90 24-Aug-07 A 01-Jul-08 28-Sep-07 01-Jul-08TGMDL050D1 GENERAL ARRANGEMENT POWER ISLAND (GT) - 1ST ISSUE
0 24-Aug-07
A
28-Sep-07
TGMDL051D1 GENERAL ARRANGEMENT POWER ISLAND (GT) - FINAL ISSUE
0 01-Jul-08 01-Jul-08
BLOCK 1 ST
BLOCK 1 ST
44 07-Nov-07 A 25-Jan-08 28-Sep-07 28-Dec-07TGMDL052D1 ARRANGEMENT PLAN (ST) - 1ST ISSUE 0 07-Nov-07
A
28-Sep-07
TGMDL053D1 ARRANGEMENT PLAN (ST) INCL LAYOUT - FINAL ISSUE
0 25-Jan-08 28-Dec-07
GT, GENERATOR & AUXILIARY FOUNDATIONS
GT, GENERATOR & AUXILIARY FOUNDATIONS
119 14-Sep-07 A 08-May-08 30-Aug-07 15-Nov-07BLOCK 1 GT 11
BLOCK 1 GT 11
119 14-Sep-07 A 08-May-08 30-Aug-07 15-Nov-07TGMDL061D1 LAODING DATA FOR GT AUXILIARY (MECH + ELECT +CONTROL) - 1ST ISSUE
0 14-Sep-07
A
30-Aug-07
TGMDL062D1 LAODING DATA FOR GT AUXILIARY (MECH + ELECT +CONTROL) - FINAL ISSUE
0 05-Nov-07
A
15-Nov-07
TGMDL063D1 GT MAIN MACHINE SET FOUNDATION DRAWINGS 0 08-May-08 15-Nov-07
ST, GENERATOR & AUXILIARY FOUNDATIONS
ST, GENERATOR & AUXILIARY FOUNDATIONS
0 28-Sep-07 A 26-Oct-07 A13-Sep-07 18-Oct-07
BLOCK 1 ST
BLOCK 1 ST
0 28-Sep-07 A 26-Oct-07A
13-Sep-07 18-Oct-07
TGMDL064D1 ST & GENO FOUNDATION LIST OF ALLOWED FORCES & MOMENTS - 1ST ISSUE
0 28-Sep-07
A
13-Sep-07
TGMDL065D1 ST & GENO FOUNDATION LOAD DRAWING - FIN ISSUE
0 09-Oct-07
A
18-Oct-07
TGMDL066D1 ST & GENO FOUNDATION LIST OF ALLOWED FORCES & MOMENTS - FIN ISSUE
0 26-Oct-07
A
18-Oct-07
ELECTRICAL & I&C GENERAL
ELECTRICAL & I&C GENERAL
66 30-Aug-07 A 07-Dec-07 A30-Aug-07 07-Dec-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
BLOCK 1 GT 11
BLOCK 1 GT 11
46 30-Aug-07 A 07-Dec-07A
30-Aug-07 07-Dec-07
TGMDL070D1 SINGLE LINE DIAGRAM 0 30-Aug-07
A
30-Aug-07
TGMDL071D1 ELECTRICAL LOAD LISTS 0 06-Sep-07
A
30-Aug-07
TGMDL073D1 I&C CABLE LISTS 0 19-Nov-07
A
19-Nov-07
TGMDL075D1 I/O LISTS 0 19-Nov-07
A
19-Nov-07
TGMDL076D1 TERMINAL BOXES CONNECTION DIAGRAMS 0 19-Nov-07
A
19-Nov-07
TGMDL077D1 JUNCTION AND TERMINAL BOX LOCATIONS 0 19-Nov-07
A
19-Nov-07
TGMDL0726D1 SIGNAL FLOW DIAGRAMS 0 19-Nov-07
A
19-Nov-07
TGMDL074D1 INSTRUMENTION LISTS 0 19-Nov-07
A
19-Nov-07
TGMDL078D1 SYSTEM DESCRIPTION OF GT CONTROL SYSTEM 0 19-Nov-07 A
19-Nov-07
TGMDL079D1 I&C CABINET DETAILS 0 07-Dec-07
A
07-Dec-07
BLOCK 1 ST
BLOCK 1 ST
66 20-Oct-07 A 22-Nov-07A
27-Sep-07 22-Nov-07
TGMDL084D1 CABINET LIST - ST 0 20-Oct-07
A
25-Oct-07
TGMDL081D1 LIST & LAYOUT PLAN OF ELECTRICAL CONSUMERS - ST
0 26-Oct-07
A
25-Oct-07
TGMDL086D1 TURBINE BLOCK DIAGRAMS - ST 0 26-Oct-07
A
25-Oct-07
TGMDL085D1 LOGIC DIAGRAMS (TRIP LOGIC) - ST 0 05-Nov-07
A
25-Oct-07
TGMDL080D1 I/O LIST (ALARM & SHUT-DOWN) - ST 0 05-Nov-07 A
27-Sep-07
TGMDL082D1 WIRING DIAGRAMS - ST 0 05-Nov-07
A
25-Oct-07
TGMDL083D1 INTERCONNECTING WIRING DIAGRAMS - ST 0 05-Nov-07 A
25-Oct-07
TGMDL089D1 LIST OF INSTRUMENTS & CONTROLS - ST 0 22-Nov-07 A
22-Nov-07
TGMDL088D1 LIST OF JUNCTION BOXES & JB ARRANGEMENT - ST
0 22-Nov-07
A
22-Nov-07
TGMDL087D1 INSTRUMENT DATA SHEETS - ST 0 22-Nov-07
A
22-Nov-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
ELECTRICAL & I&C INTERFACES
ELECTRICAL & I&C INTERFACES
24 29-Aug-07 A 07-Dec-07 A30-Aug-07 07-Dec-07
BLOCK 1 GT 11
BLOCK 1 GT 11
24 29-Aug-07 A 07-Dec-07A
30-Aug-07 07-Dec-07
TGMDL091D1 GT GENERATOR P&ID 0 29-Aug-07
A
30-Aug-07
TGMDL092D1 GT I&C INTERFACE INFORMATION (EGATROL TO DCS) - 1ST ISSUE
0 22-Oct-07
A
22-Oct-07
TGMDL093D1 GT I&C INTERFACE FUNCTIONALITY - 1ST ISSUE 0 22-Oct-07 A
22-Oct-07
TGMDL094D1 GT I&C INTERFACE INFORMATION (EGATROL TO DCS) - 1ST ISSUE
0 07-Dec-07
A
07-Dec-07
TGMDL095D1 GT I&C INTERFACE FUNCTIONALITY - 1ST ISSUE 0 07-Dec-07 A
07-Dec-07
BLOCK 1 ST
BLOCK 1 ST
0 25-Oct-07 A 25-Oct-07A
25-Oct-07 25-Oct-07
TGMDL096D1 TERMINAL POINTS LIST - ST (DEFINITION OF INTERFACES WITH tURBINE CONTROL & I&C)
0 25-Oct-07
A
25-Oct-07
ELECTRICAL & I&C ERECTION DOCUMENTATION
ELECTRICAL & I&C ERECTION DOCUMENTATION
0 05-Sep-08 05-Sep-08 04-Sep-08 04-Sep-08GENERAL
GENERAL
0 05-Sep-08 05-Sep-08 04-Sep-08 04-Sep-08TGMDL101D1 ELECTRICAL ERECTION INFORMATION 0 05-Sep-08 04-Sep-08
TGMDL102D1 ELECTRICAL BILL OF QUANTITIES (BOQ) 0 05-Sep-08 04-Sep-08
TGMDL103D1 I&C ERECTION DOCUMENTATION 0 05-Sep-08 04-Sep-08
TGMDL104D1 ELECTRICAL MODULE ERECTION DOCUMENTATION 0 05-Sep-08 04-Sep-08
MECHANICAL GENERAL
MECHANICAL GENERAL
66 17-Jul-07 A 27-Dec-07A
27-Sep-07 27-Dec-07
BLOCK 1 ST
BLOCK 1 ST
66 17-Jul-07 A 27-Dec-07A
27-Sep-07 27-Dec-07
TGMDL111D1 TECHNICAL DATASHEETS OF STEAM TURBINE - 1ST ISSUE
0 17-Jul-07
A
18-Oct-07
TGMDL112D1 PROCESS SCHEMATICS OF STEAM TURBINE - 1ST ISSUE
0 23-Aug-07
A
27-Sep-07
TGMDL107D1 NOISE EMISSION DATASHEETS OF STEAM TURBINE - 1ST ISSUE
0 18-Oct-07
A
18-Oct-07
TGMDL109D1 CONTROL VALVE DATASHEETS OF STEAM TURBINE - 1ST ISSUE
0 24-Oct-07
A
25-Oct-07
TGMDL106D1 PROCESS SCHEMATICS OF STEAM TURBINE - FIN ISSUE
0 22-Nov-07
A
22-Nov-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TGMDL110D1 CONTROL VALVE DATASHEETS OF STEAM
TURBINE - FIN ISSUE
0 27-Dec-07
A
27-Dec-07
TGMDL108D1 NOISE EMISSION DATASHEETS OF STEAM TURBINE - FIN ISSUE
0 27-Dec-07
A
27-Dec-07
TGMDL105D1 TECHNICAL DATASHEETS OF STEAM TURBINE - FIN ISSUE
0 27-Dec-07
A
27-Dec-07
MECHANICAL INTERFACES
MECHANICAL INTERFACES
66 07-Aug-07 A 31-Dec-07 A30-Aug-07 31-Dec-07
BLOCK 1 GT 11
BLOCK 1 GT 11
44 17-Aug-07 A 31-Dec-07A
30-Aug-07 31-Dec-07
TGMDL122D1 WASTE WATER INTERFACE 0 17-Aug-07
A
30-Aug-07
TGMDL126D1 FUEL GAS SKID INTERFACE - 1ST ISSUE 0 22-Aug-07
A
27-Sep-07
TGMDL125D1 EXHAUST GAS DIFFUSOR MECHANICAL INTERFACE DETAILS
0 23-Aug-07
A
30-Aug-07
TGMDL121D1 P&ID GAS TURBINE 0 29-Aug-07
A
30-Aug-07
TGMDL123D1 AIR INTAKE SYSTEM INTERFACE DRAWING 0 27-Sep-07
A
30-Aug-07
TGMDL127D1 FIRE FIGHTING & GAS DETECTION INTERFACE DETAILS
0 27-Sep-07
A
27-Sep-07
TGMDL128D1 GAS TURBINE PIPING INTERFACE 0 25-Oct-07
A
25-Oct-07
TGMDL129D1 FUEL GAS SKID INTERFACE - FINAL ISSUE 0 31-Dec-07 A
31-Dec-07
BLOCK 1 ST
BLOCK 1 ST
46 07-Aug-07 A 27-Dec-07A
30-Aug-07 27-Dec-07
TGMDL131D1 THERMAL BALANCES STEAM TURBINE - 1ST ISSUE 0 07-Aug-07 A
30-Aug-07
TGMDL132D1 TERMINAL POINT LIST STEAM TURBINE - 1ST ISSUE 0 23-Aug-07 A
13-Sep-07
TGMDL133D1 P&ID STEAM TURBINE INCL LEGEND - 1ST ISSUE 0 18-Oct-07 A
18-Oct-07
TGMDL134D1 THERMAL BALANCES STEAM TURBINE - FIN ISSUE 0 25-Oct-07 A
25-Oct-07
TGMDL135D1 TERMINAL POINT LIST STEAM TURBINE - FIN ISSUE 0 27-Dec-07 A
27-Dec-07
TGMDL136D1 P&ID STEAM TURBINE INCL LEGEND - FIN ISSUE 0 27-Dec-07 A
27-Dec-07
MECHANICAL ERECTION DOCUMENTATION
MECHANICAL ERECTION DOCUMENTATION
40 01-Jul-08 26-Aug-08 01-Jul-08 26-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
40 01-Jul-08 26-Aug-08 01-Jul-08 26-Aug-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TGMDL140D1 GT GENERAL SEQUENCE OF ASSEMBLY 0 01-Jul-08 01-Jul-08
TGMDL163D1 GT PIPING NDT EXAMINATION DETAILS 0 29-Jul-08 29-Jul-08
TGMDL164D1 GT PIPING SCOPE OF PRESSURE TEST 0 29-Jul-08 29-Jul-08
TGMDL165D1 GT PIPING ISOMETRIC DRAWINGS INCL ASSEMBLY DETAILS
0 29-Jul-08 29-Jul-08
TGMDL145D1 CONTROL VALVE BLOCK ERECTION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL146D1 GT DIFFUSOR I & II ERECTION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL147D1 GT PLATFORMS & LADDERS INSTALLATION INFORMATION
0 29-Jul-08 29-Jul-08
TGMDL148D1 GT ENCLOSURE ERECTION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL149D1 FUEL GAS FLOWMETER ERECTION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL150D1 AIR INTAKE INSTALLATION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL151D1 FIRE FIGHTING & GAS DETECTION ERECTION INFORMATION
0 29-Jul-08 29-Jul-08
TGMDL152D1 GT EQUIPMENT FLUSHING PROCEDURES 0 29-Jul-08 29-Jul-08
TGMDL153D1 GT EQUIPMENT WELDING SPECIFICATIONS 0 29-Jul-08 29-Jul-08
TGMDL154D1 MECHANICAL STANDARDS FOR FIELD FABRICATION & ASSEMBLY OF GT PIPING
0 29-Jul-08 29-Jul-08
TGMDL141D1 GT MECHANICAL BOQ (INCL PIPING) 0 29-Jul-08 29-Jul-08
TGMDL142D1 AIR INTAKE MANIFOLD INSTALLATION INFORMATION
0 29-Jul-08 29-Jul-08
TGMDL143D1 FUEL GAS BLOCK INSTALLATION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL144D1 AUXLIARIES BLOCK INSTALLATION INFORMATION 0 29-Jul-08 29-Jul-08
TGMDL155D1 GT GENERAL PIPING ARRANGEMENT DRAWING 0 29-Jul-08 29-Jul-08
TGMDL156D1 GT PIPE LINE LISTS 0 29-Jul-08 29-Jul-08
TGMDL157D1 GT VALVE & ORIFICE LISTS 0 29-Jul-08 29-Jul-08
TGMDL158D1 GT PIPING BILL OF MATERIAL 0 29-Jul-08 29-Jul-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TGMDL159D1 GT PIPING FIELD WELDS 0 29-Jul-08 29-Jul-08
TGMDL160D1 GT PIPE SUPPORTS & HANGERS DETAILS 0 29-Jul-08 29-Jul-08
TGMDL161D1 GT THERMAL INSULATION DETAILS 0 29-Jul-08 29-Jul-08
TGMDL162D1 GT PAINTING SCOPE DETAILS 0 29-Jul-08 29-Jul-08
TGMDL166D1 THERMAL BLOCK ERECTION INFORMATION 0 26-Aug-08 26-Aug-08
BLOCK 1 ST
BLOCK 1 ST
0 14-Aug-08 14-Aug-08 14-Aug-08 14-Aug-08TGMDL173D1 ASSEMBLY & COMMISSIONING PROCEDURE - ST 0 14-Aug-08 14-Aug-08
TGMDL172D1 LIST OF WELDING WITH REQUIREMENT - ST 0 14-Aug-08 14-Aug-08
TGMDL170D1 GENERAL SEQUENCE OF ST & GENO ASSEMBLY 0 14-Aug-08 14-Aug-08
TGMDL171D1 ST & GENO INSTALLATION GUIDELINES 0 14-Aug-08 14-Aug-08
GT OPERATION
GT OPERATION
456 17-Aug-07 A 28-Oct-09 30-Aug-07 21-May-09BLOCK 1 GT 11
BLOCK 1 GT 11
456 17-Aug-07 A 28-Oct-09 30-Aug-07 21-May-09TGMDL181D1 GT PERFORMANCE TABLE - FINAL ISSUE 0 17-Aug-07
A
30-Aug-07
TGMDL180D1 OPERATION CONCEPT GAS TURBINE - 1ST ISSUE 0 06-Sep-07 A
30-Aug-07
TGMDL183D1 GAS TURBINE STARTUP & SHUTDOWN CURVES 0 28-Oct-09 21-May-09
TGMDL184D1 GAS TURBINE PERFORMANCE TEST GUIDELINES 0 28-Oct-09 21-May-09
TGMDL182D1 GAS TURBINE CORRECTION CURVES 0 28-Oct-09 21-May-09
ST OPERATION
ST OPERATION
505 25-Oct-07 A 02-Dec-09 25-Oct-07 25-Jun-09BLOCK 1 ST
BLOCK 1 ST
505 25-Oct-07 A 02-Dec-09 25-Oct-07 25-Jun-09TGMDL185D1 ST PERFORMANCE CORRECTION CURVES - 1ST ISSUE
0 25-Oct-07
A
25-Oct-07
TGMDL186D1 ST START-UP DIAGRAMS - 1ST ISSUE 0 25-Oct-07
A
25-Oct-07
TGMDL187D1 ST LEAKAGE DIAGRAMS - 1ST ISSUE 0 25-Oct-07
A
25-Oct-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TGMDL188D1 ST LEAKAGE DIAGRAMS - FIN ISSUE 0 27-Dec-07
A
27-Dec-07
TGMDL189D1 ST START-UP DIAGRAMS INCL CLEARANCE TABLES - FIN ISSUE
0 31-Mar-09 16-Jan-09
TGMDL190D1 ST PERFORMANCE CORRECTION CURVES - FIN ISSUE
0 02-Dec-09 25-Jun-09
DOCUMENTATION BY GAMA
DOCUMENTATION BY GAMA
494 01-Aug-07 A 21-Sep-09 29-Jun-07 20-Feb-09GENERAL
GENERAL
494 01-Aug-07 A 21-Sep-09 29-Jun-07 20-Feb-09TGMDL224D1 SNOW LOADS 0 01-Aug-07
A
01-Aug-07
TGMDL206D1 FINAL CUSTOMER TITLE BLOCK FOR ALL DOCUMENTS/ DRAWINGS
0 31-Aug-07
A
29-Jun-07
TGMDL209D1 PLANT OPERATION CONCEPT - 1ST ISSUE 0 31-Aug-07
A
20-Aug-07
TGMDL207D1 SOIL INVESTIGATION REPORT 0 04-Sep-07
A
01-Aug-07
TGMDL221D1 ARRANGEMENT LAYOUT POWER ISLAND 0 11-Sep-07
A
01-Aug-07
TGMDL213D1 GENERAL LAYOUT - 1ST ISSUE 0 18-Sep-07
A
01-Aug-07
TGMDL230D1 PLANT EXPLOSION PROTECTION CONCEPT 0 28-Sep-07
A
17-Sep-07
TGMDL217D1 THERMAL DIAGRAM OF WHOLE CCPP - 1ST ISSUE 0 28-Sep-07 A
31-Aug-07
TGMDL202D1 GENERAL LAYOUT HAZARDOUS AREA 0 28-Sep-07
A
01-Oct-07
TGMDL203D1 SEISMIC CONCEPT 0 28-Sep-07
A
15-Aug-07
TGMDL204D1 PLANT EARTHING & LIGHTNING PROTECTION CONCEPT
0 28-Sep-07
A
15-Aug-07
TGMDL211D1 PLANT FIRE PROTECTION CONCEPT 0 28-Sep-07
A
17-Sep-07
TGMDL212D1 PLANT DRAIN SYSTEM CONCEPT 0 28-Sep-07
A
17-Sep-07
TGMDL225D1 GENERAL LAYOUT - FINAL ISSUE 0 28-Sep-07
A
01-Oct-07
TGMDL205D1 LIFTING CONCEPT 0 10-Oct-07
A
31-Aug-07
TGMDL227D1 TOPOGRAPHICAL SITE SURVEY 0 10-Oct-07
A
01-Aug-07
TGMDL227D2 TOPOGRAPHICAL SITE SURVEY - REVISION 1.0 0 10-Oct-07 A
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TGMDL201D1 COOLING WATER DIAGRAM & PARAMETERS (MIN.,
NOMINAL & MAX CONDITIONS) - 1ST ISSUE
0 11-Oct-07
A
15-Aug-07
TGMDL214D1 AVAILABILITY & QUANTITY OF MATERIAL 0 26-Oct-07 A
31-Jul-07
TGMDL215D1 PLANT NOISE STUDY 0 05-Nov-07
A
01-Aug-07
TGMDL223D1 PLANT OPERATION CONCEPT - FINAL ISSUE 0 16-Nov-07 A
18-Oct-07
TGMDL200D1 HRSG CHARACTERISTICS (INCL STARTUP CURVES
& OPERATIONAL PARAMETERS) - 1ST ISSUE
0 19-Nov-07
A
15-Aug-07
TGMDL210D1 HRSG DATA: VOLUME COMPLETE & VOLUME UPTO AUTOIGNITION OF GAS
0 19-Nov-07
A
17-Sep-07
TGMDL211D2 PLANT FIRE PROTECTION CONCEPT - REVISION 1.0 0 26-Dec-07 A TGMDL230D2 PLANT EXPLOSION PROTECTION CONCEPT -
REVISION 1.0
0 26-Dec-07
A
TGMDL216D1 PLANT HEAT BALANCE DIAGRAMS - 1ST ISSUE 0 25-Jan-08* 31-Jul-07
TGMDL228D1 PLANT PERFORMANCE TEST PROCEDURE - 1ST ISSUE
0 25-Jan-08* 30-Nov-07
TGMDL226D1 THERMAL DIAGRAM OF WHOLE CCPP - FIN ISSUE 0 25-Jan-08* 01-Nov-07
TGMDL218D1 HRSG CHARACTERISTICS (INCL STARTUP CURVES
& OPERATIONAL PARAMETERS) - FIN ISSUE
0 25-Jan-08* 15-Oct-07
TGMDL219D1 COOLING WATER DIAGRAM & PARAMETERS (MIN., NOMINAL & MAX CONDITIONS) - FIN ISSUE
0 25-Jan-08* 15-Oct-07
TGMDL217D2 THERMAL DIAGRAM OF WHOLE CCPP - 1ST ISSUE (REVISION 1.0)
0 25-Jan-08
TGMDL207D2 SOIL INVESTIGATION REPORT-REVISION 1.0 0 31-Jan-08*
TGMDL203D2 SEISMIC CONCEPT - REVISION 1.0 0 31-Jan-08*
TGMDL222D1 PLANT HEAT BALANCE DIAGRAMS - FINAL ISSUE 0 25-Feb-08* 31-Aug-07
TGMDL229D1 PLANT PERFORMANCE TEST PROCEDURE - FINAL ISSUE
0 21-Sep-09 20-Feb-09
ARRANGEMENT & PIPING ENGINEERING OF ST SET
ARRANGEMENT & PIPING ENGINEERING OF ST SET
85 21-Jun-07 A 25-Jan-08 21-Jun-07 18-Oct-07BLOCK 1 ST
BLOCK 1 ST
85 21-Jun-07 A 25-Jan-08 21-Jun-07 18-Oct-07TG324711D1 CONDENSER OUTLINE DRAWING (WITH LOADS &
ANCHORAGE DETAILS) - 1ST ISSUE
0 21-Jun-07
A
21-Jun-07
TG324701D1 STEAM TURBINE ERECTION DRAWING - 1ST ISSUE 0 02-Aug-07 A
02-Aug-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TG324715D1 ST GENO ASSEMBLY DWG (WITH LOADS &
ANCHORAGE DETAILS) - Standard
0 29-Aug-07
A
21-Jun-07
TG324701A1 ARR. PLANNING MAIN FOUND. OUTLINE & LOAD PLANS DWG - (I0)
25 31-Aug-07 A 28-Sep-07 A
10-Aug-07 13-Sep-07
TG324711D2 CONDENSER OUTLINE DRAWING (WITH LOADS &
ANCHORAGE DETAILS) - FINAL ISSUE
0 31-Aug-07
A
26-Jul-07
TG324702D1 STEAM TURBINE ANCHORAGE DRAWING - 1ST ISSUE
0 12-Sep-07
A
23-Aug-07
TG324703D1 STEAM TURBINE FOUNDATION LOADS DRAWING - 1ST ISSUE
0 12-Sep-07
A
09-Aug-07
TG324701D2 STEAM TURBINE ERECTION DRAWING - FIN ISSUE 0 26-Sep-07 A
27-Sep-07
TG324701M1 RELEASE MAIN FOUND. OUTLINE & LOAD PLAN DRAWING - 1ST ISSUE (I0)
0 28-Sep-07
A
13-Sep-07
TG324705A1 ARR. PLANNING MAIN FOUNDATION OUTLINE &
LOAD PLANS DRAWING - FINAL ISSUE
21 01-Oct-07 A 26-Oct-07 A
20-Sep-07 18-Oct-07
TG324705M1 RELEASE MAIN FOUND. OUTLINE & LOAD PLAN DRAWING - FINAL ISSUE (I1)
0 26-Oct-07
A
18-Oct-07
TG324715D2 ST GENO ASSEMBLY DRAWING (WITH LOADS &
ANCHORAGE DETAILS) - FINAL ISSUE
0 25-Jan-08 26-Jul-07
TG324702D2 STEAM TURBINE ANCHORAGE DRAWING - FIN ISSUE
0 25-Jan-08 13-Sep-07
TG324703D2 STEAM TURBINE FOUNDATION LOADS DRAWING - FIN ISSUE
0 25-Jan-08 13-Sep-07
ENGINEERING STEAM TURBINE SYSTEM
ENGINEERING STEAM TURBINE SYSTEM
631 01-Jun-07 A 30-Mar-10 01-Jun-07 26-Oct-09BLOCK 1 ST
BLOCK 1 ST
631 01-Jun-07 A 30-Mar-10 01-Jun-07 26-Oct-09TG418004A1 STEAM TURBINE CONCEPT ENGINEERING 84 01-Jun-07 A 15-Oct-07 A
01-Jun-07 26-Sep-07
TG418005A1 STEAM TURBINE BASIC ENGINEERING 180 27-Jul-07 A 03-Apr-08 27-Jul-07 03-Apr-08
TG418010D1 STEAM TURBINE P&ID AND LEGEND 1ST ISSUE 0 13-Sep-07 A
13-Sep-07
TG418014D1 STEAM TURBINE P&ID LUBE OIL SYSTEM 1ST ISSUE 0 13-Sep-07 A
13-Sep-07
TG418012D1 STEAM TURBINE P&ID CONTROL AND PROT.1ST ISSUE
0 13-Sep-07
A
13-Sep-07
TG418044D1 STEAM TURBINE STARTUP/ SHUTDOWN CURVES - 1ST ISSUE
0 20-Sep-07
A
20-Sep-07
TG418040D1 STEAM TURBINE CORRECTION CURVES/ DIAGRAM - 1ST ISSUE
0 20-Sep-07
A
20-Sep-07
TG418016D1 STEAM TURBINE ELECTRICAL CONSUMER LIST 1ST ISSUE
0 26-Sep-07
A
20-Sep-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG418018D1 STEAM TURBINE P&ID AND LEGEND 2ND ISSUE 0 26-Nov-07 A
22-Nov-07
TG418032D1 STEAM TURBINE INPUT LOGIC DIAGR.(PFUP) 0 26-Nov-07 A
18-Oct-07
TG418038D1 STEAM TURBINE SET POINT LIST - 1ST ISSUE 0 26-Nov-07 A
18-Oct-07
TG418020D1 STEAM TURBINE P&ID CONTROL AND PROT.2ND ISSUE
0 26-Nov-07
A
22-Nov-07
TG418022D1 STEAM TURBINE P&ID LUBE OIL SYSTEM 2ND ISSUE
0 26-Nov-07
A
22-Nov-07
TG418023D1 STEAM TURBINE INSTRUMENT LIST 1ST ISSUE 0 26-Nov-07 A
18-Oct-07
TG418024D1 STEAM TURBINE I/O LIST ST 1ST ISSUE 0 26-Nov-07
A
18-Oct-07
TG418030D1 STEAM TURBINE LOCATION OF INSTR./EL.CONSUMERS&JB
0 26-Nov-07
A
18-Oct-07
TG411112D1 STEAM TURBINE COMPLETE ERECTION DOCUMENTATION
0 15-May-08 15-May-08
TG411121D1 CUSTOMER QUALITY DOCS - STEAM TURBINE COMPLETE
0 14-Aug-08 14-Aug-08
TG411113D1 STEAM TURBINE COMPLETE COMMISSIONING DOCS
0 14-Aug-08 14-Aug-08
TG411114D1 STEAM TURBINE COMPLETE O&M INPUTS 1ST ISSUE
0 14-Aug-08 14-Aug-08
TG411115D1 ST COMPLETE O&M INPUTS- FINAL ISSUE UNIT 1 0 30-Mar-10 26-Oct-09
STEAM TURBINE SECTION COMPLETE
STEAM TURBINE SECTION COMPLETE
314 01-Jun-07 A 13-Dec-08 01-Jun-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
314 01-Jun-07 A 13-Dec-08 01-Jun-07 30-Sep-08TG411010A1 STEAM TURBINE OVERALL MANUFACTURE 314 01-Jun-07 A 14-Aug-08 01-Jun-07 14-Aug-08
TG411005M1 STEAM TURBINE ORDER 0 14-Jun-07
A
01-Jun-07
TG412135M1 ST ANCHORAGE PARTS ORDER 0 31-Jul-07
A
31-Jul-07
TG412135A1 ST ANCHORAGE PARTS DELIVERY OF MATERIAL 143 31-Jul-07 A 15-Feb-08 31-Jul-07 15-Feb-08
TG412136A1 ST ANCHORAGE PARTS MACHINING 50 18-Feb-08 25-Apr-08 15-Feb-08 25-Apr-08
TG412140A1 EX-WORKS ST ANCHORAGE PARTS 0 25-Apr-08 25-Apr-08
TG412145A1 ST ANCHORAGE PARTS TRANSPORT TO THESSALONIKI
45 25-Apr-08 09-Jun-08 25-Apr-08 09-Jun-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TG411011M1 STEAM TURBINE WELDED ROTOR TESTS -
NOTIFICATION
0 09-May-08 09-May-08
TG411012M1 STEAM TURBINE WELDED ROTOR TESTS - WITNESS POINT
0 22-May-08 23-May-08
TG412145M1 ST ANCHORAGE PARTS MHO 0 09-Jun-08 09-Jun-08
TG411016M1 EX- WORKS STEAM TURBINE STATIC PARTS 0 19-Jun-08 20-Jun-08
TG411015M1 EX- WORKS STEAM TURBINE ROTOR 0 19-Jun-08 20-Jun-08
A50050 STORAGE - STEAM TURBINE 74 14-Aug-08 27-Oct-08
TG411020A1 STEAM TURBINE COMPLETE - TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG411020M1 STEAM TURBINE COMPLETE - MHO 0 13-Dec-08 30-Sep-08
ST BEARING PEDESTAL COMPLETE
ST BEARING PEDESTAL COMPLETE
269 01-Jun-07 A 07-Nov-08 01-Jun-07 30-Aug-08BLOCK 1 ST
BLOCK 1 ST
269 01-Jun-07 A 07-Nov-08 01-Jun-07 30-Aug-08TG414051A1 STEAM TURBINE BEARING PEDESTAL MATERIAL PROCUREMENT & CASTING
195 01-Jun-07 A 29-Feb-08 01-Jun-07 29-Feb-08
TG414055A1 STEAM TURBINE BEARING PEDESTAL MACHINING 71 05-Mar-08 11-Jun-08 04-Mar-08 11-Jun-08
TG414056A1 STEAM TURBINE BEARING PEDESTAL ASSEMBLY 15 19-Jun-08 09-Jul-08 18-Jun-08 09-Jul-08
TG414056M1 EX- WORKS ST BEARING PEDESTAL 0 09-Jul-08 09-Jul-08
A50060 STORAGE - ST BEARING PEDESTAL 74 09-Jul-08 21-Sep-08
TG414060A1 ST BEARING PEDESTAL TRANSPORT TO THESSALONIKI
47 21-Sep-08* 07-Nov-08 14-Jul-08 30-Aug-08
TG414060M1 ST BEARING PEDESTAL MHO 0 07-Nov-08 30-Aug-08
GLAND STEAM SUCTION EQUIPMENT
GLAND STEAM SUCTION EQUIPMENT
294 01-Jun-07 A 13-Dec-08 01-Jun-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
294 01-Jun-07 A 13-Dec-08 01-Jun-07 30-Sep-08TG416102A1 GLAND STEAM COND. TECHN.SPECIFICATION 15 01-Jun-07 A 21-Jun-07 A
01-Jun-07 21-Jun-07
TG416112D1 GLAND STEAM COND. TECH SPECS FOR INQUIRY 0 21-Jun-07 A
21-Jun-07
TG416110A1 GLAND STEAM COND. INQUIRY/ ORDER 45 22-Jun-07 A 09-Oct-07 A
22-Jun-07 23-Aug-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG416115M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 09-Oct-07 A
23-Aug-07
TG416114M1 GLAND STEAM COND. ORDER 0 10-Oct-07
A
23-Aug-07
TG416120A1 GLAND STEAM COND. MANUFACTURE 255 10-Oct-07 A 14-Aug-08 24-Aug-07 14-Aug-08
TG416120M1 GLAND STEAM COND. EFU -28D 0 18-Jul-08 18-Jul-08
TG416121M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 14-Aug-08 14-Aug-08
TG416122M1 EX- WORKS GLAND STEAM COND. 0 14-Aug-08 14-Aug-08
A50070 STORAGE - GLAND STEAM CONDENSER 74 14-Aug-08 27-Oct-08
TG416124A1 GLAND STEAM COND. TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG416126M1 GLAND STEAM COND. MHO 0 13-Dec-08 30-Sep-08
LUBE-& CONTROL OIL UNIT TO ST
LUBE-& CONTROL OIL UNIT TO ST
237 21-Dec-07 A 13-Dec-08 15-Aug-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
237 21-Dec-07 A 13-Dec-08 15-Aug-07 30-Sep-08TG416210M1 LUBE & CONTROL OIL UNIT ORDER 0 21-Dec-07
A
15-Aug-07
TG416211M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 21-Dec-07 A
15-Aug-07
TG416215A1 LUBE & CONTROL OIL UNIT MANUFACTURE 167 21-Dec-07 A 14-Aug-08 14-Sep-07 14-Aug-08
TG416218M1 LUBE & CONTROL OIL UNIT EFU -28D 0 18-Jul-08 17-Jul-08
TG416220M1 EX- WORKS LUBE & CONTROL OIL UNIT 0 14-Aug-08 14-Aug-08
TG416216M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 14-Aug-08 14-Aug-08
A50080 STORAGE - LUBE OIL CONTROL UNIT 74 14-Aug-08 27-Oct-08
TG416225A1 LUBE & CONTROL OIL UNIT TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG416225M1 LUBE & CONTROL OIL UNIT MHO 0 13-Dec-08 30-Sep-08
STEAM TURBINE CHECK VALVE
STEAM TURBINE CHECK VALVE
294 14-Sep-07 A 13-Dec-08 14-Sep-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
294 14-Sep-07 A 13-Dec-08 14-Sep-07 30-Sep-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG416702M1 ST VALVES ORDER 0 14-Sep-07
A
14-Sep-07
TG416704A1 ST VALVES MANUFACTURE 239 17-Sep-07 A 14-Aug-08 14-Sep-07 14-Aug-08
TG416705M1 ST CHECK VALVES EFU -28D 0 18-Jul-08 17-Jul-08
TG416706M1 EX- WORKS ST VALVES 0 14-Aug-08 14-Aug-08
A50090 STORAGE - STEAM TURBINE VALVES 74 14-Aug-08 27-Oct-08
TG416708A1 ST VALVES TRANSPORT TO THESSALONIKI 47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG416710M1 ST VALVES MHO 0 13-Dec-08 30-Sep-08
PIPES TO ST SYSTEM
PIPES TO ST SYSTEM
294 30-Aug-07 A 13-Dec-08 10-Aug-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
294 30-Aug-07 A 13-Dec-08 10-Aug-07 30-Sep-08TG419150M1 ST INTERNAL PIPING & HANGERS/ SUPPORTS ORDER
0 30-Aug-07
A
10-Aug-07
TG419152A1 ST INTERNAL PIPING & HANGERS/SUPPORT MANUFACTURE
263 30-Aug-07 A 14-Aug-08 13-Aug-07 14-Aug-08
TG419152M1 ST INTERNAL PIPING & HANGERS / SUPPORTS EFU -28D
0 18-Jul-08 17-Jul-08
TG419154M1 EX- WORKS ST INTERNAL PIPING 0 14-Aug-08 14-Aug-08
A50100 STORAGE - ST INTERNAL PIPING 74 14-Aug-08 27-Oct-08
TG419156A1 ST INTERNAL PIPING& HGR/ SUPPT TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG419158M1 ST INTERNAL PIPING & HANGERS/ SUPPORTS MHO 0 13-Dec-08 30-Sep-08
PIPE INSULATION INCL. HEAT TRACING TO ST SYSTEM PIPING
PIPE INSULATION INCL. HEAT TRACING TO ST SYSTEM ...
294 18-Sep-07 A 13-Dec-08 17-Sep-07 30-Sep-08BLOCK 1 ST
BLOCK 1 ST
294 18-Sep-07 A 13-Dec-08 17-Sep-07 30-Sep-08TG593002A1 ST- INSULATION TECHN.SPECIFICATION 20 18-Sep-07 A 15-Oct-07 A
17-Sep-07 15-Oct-07
TG593002M1 ST- INSULATION TECHN.SPECIFICATION COMPL 0 15-Oct-07 A
15-Oct-07
TG593010A1 ST- INSULATION INQUIRY/ ORDER 54 15-Oct-07 A 15-Jan-08 A
15-Oct-07 28-Dec-07
TG593010M1 ST- INSULATION ORDER 0 15-Jan-08
A
28-Dec-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG593014A1 ST- PIPING INSULATION MANUFACTURE 137 16-Jan-08 A 14-Aug-08 04-Jan-08 14-Aug-08
TG593024A1 ST- CASING INSULATION MANUFACTURE 137 16-Jan-08 A 14-Aug-08 04-Jan-08 14-Aug-08
TG593016M1 ST- PIPING INSULATION EFU -14D 0 01-Aug-08 31-Jul-08
TG593024M1 ST- CASING INSULATION EFU -14D 0 01-Aug-08 31-Jul-08
TG593026M1 EX- WORKS ST- PIPING INSULATION/CASING INSULATION
0 14-Aug-08 14-Aug-08
A50110 STORAGE - ST PIPING/CASING INSULATION 74 14-Aug-08 27-Oct-08
TG593018A1 ST- PIPING INSULATION TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG593028A1 ST- CASING INSULATION TRANSPORT TO THESSALONIKI
47 27-Oct-08 13-Dec-08 14-Aug-08 30-Sep-08
TG593020M1 ST- PIPING INSULATION MHO 0 13-Dec-08 30-Sep-08
TG593030M1 ST- CASING INSULATION MHO 0 13-Dec-08 30-Sep-08
PROCESS AND PERFORMANCE ENGINEERING
PROCESS AND PERFORMANCE ENGINEERING
374 01-Jun-07 A 03-Apr-09 01-Jun-07 16-Jan-09BLOCK 1 GT 11
BLOCK 1 GT 11
374 01-Jun-07 A 03-Apr-09 01-Jun-07 16-Jan-09TG420102A1 GAS TURBINE CONCEPT ENGINEERING 10 01-Jun-07 A 14-Jun-07 A
01-Jun-07 14-Jun-07
TG342105A1 OPERATION MODES GT 160 08-Jun-07 A 17-Jan-08
A
08-Jun-07 17-Jan-08
TG420104A1 GAS TURBINE BASIC ENGINEERING 120 15-Jun-07 A 30-Oct-07 A
15-Jun-07 29-Nov-07
TG420106D1 GAS TURBINE PERFORMANCE DATA SHEET 1ST ISSUE
0 17-Aug-07
A
23-Aug-07
TG420108D1 GAS TURBINE WASTE WATER DATA SHEET 0 17-Aug-07
A
19-Jul-07
TG420109D1 GAS TURBINE FUEL SYSTEM DESIGN DATA SHEET 0 17-Aug-07 A
19-Jul-07
TG420110D1 GAS TURBINE P&ID + LEGEND 1ST ISSUE 0 29-Aug-07 A
12-Jul-07
TG420136D1 GAS TURBINE P&ID + LEGEND 2ND ISSUE 0 29-Aug-07 A
20-Sep-07
TG420145D1 GAS TURBINE PLANT DATA SHEET 1ST ISSUE 0 06-Sep-07 A
06-Sep-07
TG420141D1 GAS TURBINE OPERATING INSTRUCTIONS 1ST ISSUE
0 08-Sep-07
A
06-Sep-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG420142D1 GAS TURBINE WALK DOWN PROCEDURE 0 08-Sep-07
A
06-Sep-07
TG420113A1 GAS TURBINE CUSTOMER APPROVAL P&ID 1st ISSUE
0 11-Sep-07
A
09-Aug-07
TG420146D1 GAS TURBINE PROTECTION LIST 1ST ISSUE 0 13-Sep-07 A
20-Sep-07
TG420147D1 GAS TURBINE SET POINT LIST 1ST ISSUE 0 13-Sep-07 A
20-Sep-07
TG420162D1 GAS TURBINE SET POINT LIST 0 07-Nov-07
A
04-Oct-07
TG420167D1 GAS TURBINE PROTECTION LIST 1ST ISSUE 0 07-Nov-07 A
04-Oct-07
TG420164D1 GAS TURBINE PERFORMANCE DATA SHEET 2ND ISSUE
0 13-Mar-08 20-Mar-08
TG420168D1 GAS TURBINE PLANT DATA SHEET 2ND ISSUE 0 02-Apr-08 03-Apr-08
TG420161D2 GAS TURBINE OPERATING INSTRUCTIONS 2ND ISSUE
0 04-Apr-08 03-Apr-08
TG420165D1 GAS TURBINE PROTECTION LIST 2ND ISSUE 0 10-Apr-08 17-Apr-08
TG420166D1 GAS TURBINE SET POINT LIST 2ND ISSUE 0 10-Apr-08 17-Apr-08
TG420167D2 GAS TURBINE PROTECTION LIST 2ND ISSUE 0 03-Apr-09 16-Jan-09
CIVIL DESIGN OF GT/ GENO FOUNDATIONs
CIVIL DESIGN OF GT/ GENO FOUNDATIONs
65 08-Feb-08 08-May-08 03-Aug-07 15-Nov-07BLOCK 1 GT 11
BLOCK 1 GT 11
65 08-Feb-08 08-May-08 03-Aug-07 15-Nov-07TG420310A1 CIVIL BASIC DESIGN GT AND GENO MAIN FOUNDATIONS
20 08-Feb-08 06-Mar-08 03-Aug-07 30-Aug-07
TG420310M1 RELEASE GT AND GENO MAIN FOUNDATIONS DRAWINGS - 1ST ISSUE
0 06-Mar-08 30-Aug-07
TG420350A1 CIVIL DETAIL ENGINEERING GT AND GENO MAIN FOUNDATION
45 07-Mar-08 08-May-08 14-Sep-07 15-Nov-07
TG420320M1 RELEASE GT AND GENO MAIN FOUNDATIONS DRAWINGS - FINAL ISSUE
0 08-May-08 15-Nov-07
ARRANGEMENT PLANNING GT,GEN,ST & ENCLOSURE
ARRANGEMENT PLANNING GT,GEN,ST & ENCLOSURE
142 27-Jun-07 A 07-Feb-08 21-Jun-07 22-Nov-07BLOCK 1 GT 11
BLOCK 1 GT 11
142 27-Jun-07 A 07-Feb-08 21-Jun-07 22-Nov-07TG420305A1 ELECTRICAL ARRANGEMENT PLANNING 85 27-Jun-07 A 14-Dec-07 A
27-Jul-07 22-Nov-07
TG420308D1 GT ENCLOSURE LOADS - 1ST ISSUE 0 29-Jun-07
A
28-Jun-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG420302A1 ARR. PLANNING GT AUX FOUNDATIONS 95 29-Jun-07 A 26-Dec-07 A
29-Jun-07 08-Nov-07
TG420325D1 GENERATOR ASSEMBLY DRAWING (WITH LOADS &
ANCHORAGE DETAILS) INCL ENCLOSURE- 1ST ISSUE
0 29-Jun-07
A
28-Jun-07
TG420301D1 GT AUXILIARIES OUTLINE DRAWING (INCL. LOADS) - 1ST ISSUE
0 29-Jun-07
A
28-Jun-07
TG420301A1 ARR. PLANNING GT AND GENO MAIN FOUNDATION 70 29-Jun-07 A 07-Feb-08 29-Jun-07 04-Oct-07
TG420356D2 LIFTING DEVICE INTAKE HOUSING (STD DRAWING) - FINAL ISSUE
0 31-Jul-07
A
19-Jul-07
TG420325D2 GENERATOR ASSEMBLY DRAWING (WITH LOADS &
ANCHORAGE DETAILS) INCL ENCLOSURE- FINAL ISSUE
0 03-Aug-07
A
02-Aug-07
TG420301M1 RELEASE GT MAIN FOUNDATION OUTLINE & LOAD PLAN DRAWINGS - 1ST ISSUE
0 23-Aug-07
A
02-Aug-07
TG420304M1 RELEASE GT MAIN FOUNDATION ANCHORAGE DRAWINGS - 1ST ISSUE
0 23-Aug-07
A
02-Aug-07
TG420305M1 RELEASE CABLE STUB-UPS & EARTHING POINTS DRAWINGS - 1ST ISSUE
0 23-Aug-07
A
02-Aug-07
TG420302M1 RELEASE GENERAL ARRG. GT SET OUTDOOR - 1ST ISSUE
0 24-Aug-07
A
30-Aug-07
TG420354D1 MINIMUM CRANE HEIGHT (STD DRAWING) - 1ST ISSUE
0 31-Aug-07
A
21-Jun-07
TG420355D1 LIFTING DEVICES (STD DRAWING) - 1ST ISSUE 0 31-Aug-07 A
21-Jun-07
TG420356D1 LIFTING DEVICE INTAKE HOUSING (STD DRAWING) - 1ST ISSUE
0 31-Aug-07
A
21-Jun-07
TG420354D2 MINIMUM CRANE HEIGHT (STD DRAWING) - FINAL ISSUE
0 31-Aug-07
A
19-Jul-07
TG420355D2 LIFTING DEVICES (STD DRAWING) - FINAL ISSUE 0 31-Aug-07 A
19-Jul-07
TG420302D1 GT AIR INTAKE SYSTEM OUTLINE DRAWINGS (INCL.
LOAD PLANS) - 1ST ISSUE
0 31-Aug-07
A
28-Jun-07
TG420303M1 RELEASE GT AUX FOUNDATION BASE PLATE &
LOAD PLAN DRAWINGS - 1ST ISSUE
0 14-Sep-07
A
30-Aug-07
TG420306M1 RELEASE AUX FOUNDATION CABLE DUCTS+PULL PITS DRAWINGS - 1ST ISSUE
0 17-Sep-07
A
30-Aug-07
TG420307M1 RELEASE GT E-MODULE CELLARS CABLE TRAYS ARRANGEMENT - 1ST ISSUE
0 17-Sep-07
A
30-Aug-07
TG420308M1 RELEASE GT E-MODULE CELLARS CABLE DETAILS - 1ST ISSUE
0 17-Sep-07
A
30-Aug-07
TG420352D1 SITE LAYOUT - 1ST ISSUE 0 18-Sep-07
A
01-Aug-07
TG420353D1 SITE GRID LAYOUT - 1ST ISSUE 0 20-Sep-07
A
01-Aug-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG420351D1 SEISMIC CONCEPT - 1ST ISSUE (CONTRACT) 0 28-Sep-07 A
05-Jul-07
TG420301D2 GT AUXILIARIES OUTLINE DRAWING (INCL. LOADS) - FINAL ISSUE
0 28-Sep-07
A
13-Sep-07
TG420352D2 SITE LAYOUT - FINAL ISSUE 0 28-Sep-07
A
01-Oct-07
TG420308D2 GT ENCLOSURE LOADS - FIN ISSUE 0 05-Oct-07
A
27-Sep-07
TG420303M2 RELEASE GT AUX FOUNDATION BASE PLATES &
LOAD PLAN DRAWINGS - FINAL ISSUE
0 29-Oct-07
A
08-Nov-07
TG420306M2 RELEASE AUX FOUNDATION CABLE DUCTS+PULL PITS DRAWINGS - FIN ISSUE
0 29-Oct-07
A
09-Nov-07
TG420307M2 RELEASE GT E-MODULE CELLARS CABLE TRAYS ARRANGEMENT - FIN ISSUE
0 29-Oct-07
A
09-Nov-07
TG420308M2 RELEASE GT E-MODULE CELLARS CABLE DETAILS - FIN ISSUE
0 29-Oct-07
A
09-Nov-07
TG420321D1 GT P&ID - 1ST ISSUE 0 30-Oct-07
A
12-Jul-07
TG420302D2 GT AIR INTAKE SYSTEM OUTLINE DRAWINGS (INCL.
LOAD PLANS) - FINAL ISSUE
0 30-Oct-07
A
13-Sep-07
TG420321D2 GT P&ID - FINAL ISSUE 0 30-Oct-07
A
16-Aug-07
TG420322D2 GT E-MODULES OUTLINE DRAWING (INCL. LOADS) - FINAL ISSUE
0 30-Oct-07
A
02-Aug-07
TG420322D1 GT E-MODULES OUTLINE DRAWING (INCL. LOADS) - 1ST ISSUE
0 30-Oct-07
A
28-Jun-07
TG420353D2 SITE GRID LAYOUT - FINAL ISSUE 0 26-Dec-07
A
01-Aug-07
TG420302M2 RELEASE GENERAL ARRG. GT OUTDOOR - FINAL ISSUE
0 25-Jan-08 08-Nov-07
TG420351D2 SEISMIC CONCEPT - FINAL ISSUE 0 31-Jan-08 15-Aug-07
TG420301M2 RELEASE GT MAIN FOUNDATION OUTLINE & LOAD PLAN DRAWINGS - FINAL ISSUE
0 07-Feb-08 04-Oct-07
TG420304M2 RELEASE GT MAIN FOUNDATION ANCHORAGE DRAWINGS - FINAL ISSUE
0 07-Feb-08 04-Oct-07
TG420305M2 RELEASE CABLE STUB-UPS & EARTHING POINTS DRAWINGS - FIN ISSUE
0 07-Feb-08 04-Oct-07
KEY INPUT DOCUMENTS & EVENTS
KEY INPUT DOCUMENTS & EVENTS
0 23-Aug-07 A 31-Aug-07 A14-Jun-07 23-Aug-07
GENERAL
GENERAL
0 23-Aug-07 A 31-Aug-07A
14-Jun-07 23-Aug-07
TG420375D1 SHIPPING , PACKING AND MARKING INSTRUCTIONS 0 23-Aug-07 A
23-Aug-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG420374D1 PROJECT RELATED PURCHASE CONDITIONS 0 31-Aug-07
A
14-Jun-07
TG420373D1 PAINTING SPECIFICATION 0 31-Aug-07
A
14-Jun-07
THERMAL BLOCK
THERMAL BLOCK
278 07-Jun-07 A 30-Oct-08 07-Jun-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
278 07-Jun-07 A 30-Oct-08 07-Jun-07 17-Aug-08TG421105M1 THERMAL BLOCK ORDER 0 07-Jun-07
A
07-Jun-07
TG421106M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 07-Jun-07 A
07-Jun-07
TG421105A1 THERMAL BLOCK OVERALL MANUFACTURE 278 08-Jun-07 A 01-Jul-08 08-Jun-07 01-Jul-08
TG421155S1 THERMAL BLOCK GT FDS TESTS - NOTIFICATION 0 25-Jan-08 25-Jan-08
TG421156S1 THERMAL BLOCK GT FDS TESTS - WITNESS POINT 0 08-Feb-08 08-Feb-08
TG421112R1 GT THERMAL BLOCK ROTOR OVERSPEED SPIN TEST - NOTIFICATION
0 28-Mar-08 28-Mar-08
TG421113R1 GT THERMAL BLOCK ROTOR OVERSPEED SPIN TEST - WITNESS POINT
0 10-Apr-08 10-Apr-08
TG421157S1 THERMAL BLOCK GT STATOR TESTS - NOTIFICATION
0 10-Apr-08 10-Apr-08
TG421158S1 THERMAL BLOCK GT STATOR TESTS - WITNESS POINT
0 10-Apr-08 10-Apr-08
TG421112M1 THERMAL BLOCK ASSEMBLY TESTS - NOTIFICATION
0 25-Apr-08 25-Apr-08
TG421113M1 THERMAL BLOCK ASSEMBLY TESTS - WITNESS POINT
0 09-May-08 09-May-08
TG421115M1 EX- WORKS THERMAL BLOCK 0 01-Jul-08 01-Jul-08
TG421114M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
A50120 STORAGE - THERMAL BLOCK 74 01-Jul-08 13-Sep-08
TG421120A1 THERMAL BLOCK TRANSPORT TO THESSALONIKI 47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG421125M1 THERMAL BLOCK MHO 0 30-Oct-08 17-Aug-08
THERMAL BLOCK INTERMEDIATE SHAFT
THERMAL BLOCK INTERMEDIATE SHAFT
263 11-Oct-07 A 30-Oct-08 11-Oct-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
263 11-Oct-07 A 30-Oct-08 11-Oct-07 17-Aug-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TG421301M1 THERMAL BLOCK INTERMEDIATE SHAFT
HANDOVER INFO
0 11-Oct-07
A
11-Oct-07
TG421303A1 THERMAL BLOCK INTERMEDIATE SHAFT TECHNICAL SPECS
5 11-Oct-07 A 18-Oct-07 A
12-Oct-07 18-Oct-07
TG421303M1 THERMAL BLOCK INTERMEDIATE SHAFT TECH SPECS COMPLETE
0 18-Oct-07
A
18-Oct-07
TG421305A1 THERMAL BLOCK INTERMEDIATE SHAFT INQUIRY/
ORDER
5 18-Oct-07 A 27-Oct-07 A
19-Oct-07 25-Oct-07
TG421305M1 THERMAL BLOCK INTERMEDIATE SHAFT ORDER 0 27-Oct-07 A
25-Oct-07
TG421306M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 27-Oct-07 A
25-Oct-07
TG421310A1 THERMAL BLOCK INTERMEDIATE SHAFT MANUFACTURE
178 29-Oct-07 A 01-Jul-08 26-Oct-07 01-Jul-08
TG421310M1 THERMAL BLOCK INTERMEDIATE SHAFT EFU -28D 0 04-Jun-08 04-Jun-08
TG421312M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
TG421311A1 EX- WORKS THERMAL BLOCK INTERMEDIATE SHAFT
0 01-Jul-08 01-Jul-08
A50130 STORAGE - GT INTERMEDIATE SHAFT 74 01-Jul-08 13-Sep-08
TG421320A1 THERMAL BLOCK INTERMEDIATE SHAFT TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG421320M1 THERMAL BLOCK INTERMEDIATE SHAFT MHO 0 30-Oct-08 17-Aug-08
GT AIR INTAKE MANIFOLD
GT AIR INTAKE MANIFOLD
208 14-Nov-07 A 30-Oct-08 31-Dec-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
208 14-Nov-07 A 30-Oct-08 31-Dec-07 17-Aug-08TG421703A1 AIR INTAKE MANIFOLD TECHNICAL SPECS 5 14-Nov-07 A 16-Nov-07 A
01-Jan-08 07-Jan-08
TG421701M1 AIR INTAKE MANIFOLD HANDOVER INFO 0 15-Nov-07
A
31-Dec-07
TG421703M1 AIR INTAKE MANIFOLD TECH SPECS COMPLETE 0 16-Nov-07 A
07-Jan-08
TG421704A1 AIR INTAKE MANIFOLD INQUIRY/ ORDER 5 16-Nov-07 A 20-Nov-07 A
08-Jan-08 14-Jan-08
TG421706M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 21-Nov-07 A
14-Jan-08
TG421705M1 AIR INTAKE MANIFOLD ORDER 0 21-Nov-07
A
14-Jan-08
TG421710A1 AIR INTAKE MANIFOLD MANUFACTURE 121 22-Nov-07 A 01-Jul-08 15-Jan-08 01-Jul-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG421710M1 AIR INTAKE MANIFOLD EFU -28D 0 04-Jun-08 04-Jun-08
TG421710X AIR INTAKE MANIFOLD (FAT) 2 20-Jun-08 24-Jun-08 20-Jun-08 24-Jun-08
TG421712M1 EX- WORKS AIR INTAKE MANIFOLD 0 01-Jul-08 01-Jul-08
TG421711M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
A50140 STORAGE - AIR INTAKE MANIFOLD 74 01-Jul-08 13-Sep-08
TG421720A1 AIR INTAKE MANIFOLD TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG421725M1 AIR INTAKE MANIFOLD MHO 0 30-Oct-08 17-Aug-08
GT EXHAUST GAS DIFFUSOR
GT EXHAUST GAS DIFFUSOR
222 05-Nov-07 A 30-Oct-08 17-Dec-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
222 05-Nov-07 A 30-Oct-08 17-Dec-07 17-Aug-08TG421801M1 EXHAUST GAS DIFF HANDOVER INFO 0 05-Nov-07
A
17-Dec-07
TG421803A1 EXHAUST GAS DIFF TECHNICAL SPECS 5 06-Nov-07 A 08-Nov-07 A
18-Dec-07 24-Dec-07
TG421803M1 EXHAUST GAS DIFF TECH SPECS COMPLETE 0 08-Nov-07 A
24-Dec-07
TG421805A1 EXHAUST GAS DIFF INQUIRY/ ORDER 5 09-Nov-07 A 14-Nov-07 A
25-Dec-07 31-Dec-07
TG421830M1 EXHAUST GAS DIFF. EQUALISING SECTION ORDER 0 15-Nov-07 A
14-Jan-08
TG421831M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER -DIFF EQUALISING SECTION
0 15-Nov-07
A
14-Jan-08
TG421805M1 EXHAUST GAS DIFF. I ORDER 0 15-Nov-07
A
31-Dec-07
TG421806M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER - DIFF 1
0 15-Nov-07
A
31-Dec-07
TG421835A1 EXHAUST GAS DIFF. EQUALISING SECTION MANUFACTURE
164 15-Nov-07 A 01-Jul-08 15-Jan-08 01-Jul-08
TG421810A1 EXHAUST GAS DIFF. I MANUFACTURE 163 16-Nov-07 A 01-Jul-08 01-Jan-08 01-Jul-08
TG421810M1 EXHAUST GAS DIFF. I EFU -28D 0 04-Jun-08 04-Jun-08
TG421835M1 EXHAUST GAS DIFF. EQUALISING SECTION EFU -28D
0 04-Jun-08 04-Jun-08
TG421840W1 EXHAUST GAS DIFF. EQUALISING SECTION (FATS) 2 20-Jun-08 24-Jun-08 20-Jun-08 24-Jun-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG421812M1 EX- WORKS EXHAUST GAS DIFF. I 0 01-Jul-08 01-Jul-08
TG421838M1 EX- WORKS EXHAUST GAS EQUALISING SECTION 0 01-Jul-08 01-Jul-08
TG421836M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 DIFF EQUALISING SECTION
0 01-Jul-08 01-Jul-08
TG421811M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 DIFF 1 0 01-Jul-08 01-Jul-08
A50150 STORAGE - GT EXHAUST DIFFUSOR 74 01-Jul-08 13-Sep-08
TG421820A1 EXHAUST GAS DIFF. I TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG421845A1 EXHAUST GAS DIFF. EQUALISING SECTION TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG421825M1 EXHAUST GAS DIFF. I MHO 0 30-Oct-08 17-Aug-08
TG421850M1 EXHAUST GAS DIFF. EQUALISING SECTION MHO 0 30-Oct-08 17-Aug-08
BLOW OFF SILENCER
BLOW OFF SILENCER
200 27-Aug-07 A 30-Oct-08 28-Jan-08 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
200 27-Aug-07 A 30-Oct-08 28-Jan-08 17-Aug-08TG422603M1 BLOW OFF SILENCER TECH SPECS COMPLETE 0 27-Aug-07 A
04-Feb-08
TG422601M1 BLOW OFF SILENCER HANDOVER INFO 0 27-Aug-07
A
28-Jan-08
TG422603A1 BLOW OFF SILENCER TECHNICAL SPECS 5 27-Aug-07 A 04-Sep-07 A
29-Jan-08 04-Feb-08
TG422605A1 BLOW OFF SILENCER INQUIRY/ ORDER 5 03-Sep-07 A 05-Sep-07 A
05-Feb-08 11-Feb-08
TG422605M1 BLOW OFF SILENCER ORDER 0 05-Sep-07
A
11-Feb-08
TG422610A1 BLOW OFF SILENCER MANUFACTURE 113 25-Jan-08 01-Jul-08 12-Feb-08 01-Jul-08
TG422606M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER -BLOW OFF SILENCER
0 25-Jan-08 11-Feb-08
TG422610M1 BLOW OFF SILENCER EFU -28D 0 04-Jun-08 04-Jun-08
TG422616B1 BLOW OFF SILENCER (FATS) 1 23-Jun-08 24-Jun-08 23-Jun-08 24-Jun-08
TG422611M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 BLOW OFF SILENCER
0 01-Jul-08 01-Jul-08
TG422612M1 EX- WORKS BLOW OFF SILENCER 0 01-Jul-08 01-Jul-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
A50160 STORAGE - BLOW OFF SILENCER 74 01-Jul-08 13-Sep-08
TG422615A1 BLOW OFF SILENCER TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG422615M1 BLOW OFF SILENCER MHO 0 30-Oct-08 17-Aug-08
GT BLOW OFF VALVE
GT BLOW OFF VALVE
244 05-Nov-07 A 30-Oct-08 05-Nov-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
244 05-Nov-07 A 30-Oct-08 05-Nov-07 17-Aug-08TG422701M1 BLOW OFF VALVE HANDOVER INFO 0 05-Nov-07
A
05-Nov-07
TG422703A1 BLOW OFF VALVE TECHNICAL SPECS 5 06-Nov-07 A 13-Nov-07 A
06-Nov-07 12-Nov-07
TG422703M1 BLOW OFFVALVE TECH SPECS COMPLETE 0 13-Nov-07
A
12-Nov-07
TG422705A1 BLOW OFF VALVE INQUIRY/ ORDER 5 14-Nov-07 A 17-Nov-07 A
13-Nov-07 19-Nov-07
TG422706M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER -BLOW OFF VALVE
0 19-Nov-07
A
19-Nov-07
TG422705M1 BLOW OFF VALVE ORDER 0 19-Nov-07
A
19-Nov-07
TG422710A1 BLOW OFF VALVE MANUFACTURE 161 20-Nov-07 A 01-Jul-08 20-Nov-07 01-Jul-08
TG422710M1 BLOW OFF VALVE EFU -28D 0 04-Jun-08 04-Jun-08
TG422711M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 BLOW OFF VALVE
0 01-Jul-08 01-Jul-08
TG422712M1 EX- WORKS BLOW OFF VALVE 0 01-Jul-08 01-Jul-08
A50170 STORAGE - BLOW OFF VALVE 74 01-Jul-08 13-Sep-08
TG422720A1 BLOW OFF VALVE TRANSPORT TO THESSALONIKI 47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG422725M1 BLOW OFF VALVE MHO 0 30-Oct-08 17-Aug-08
FUEL GAS BLOCK / SKID
FUEL GAS BLOCK / SKID
222 19-Nov-07 A 30-Oct-08 17-Dec-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
222 19-Nov-07 A 30-Oct-08 17-Dec-07 17-Aug-08TG424621M1 FUEL GAS SKID (INCL FINE FILTERS) HANDOVER INFO
0 19-Nov-07
A
17-Dec-07
TG424623A1 FUEL GAS SKID (INCL FINE FILTERS) TECHNICAL SPECS
10 20-Nov-07 A 22-Nov-07 A
18-Dec-07 31-Dec-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TG424623M1 FUEL GAS SKID (INCL FINE FILTERS) TECH SPECS
COMPLETE
0 23-Nov-07
A
31-Dec-07
TG424624A1 FUEL GAS SKID (INCL FINE FILTERS) INQUIRY/
ORDER
10 26-Nov-07 A 27-Nov-07 A
01-Jan-08 14-Jan-08
TG424629M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 28-Nov-07 A
14-Jan-08
TG424628M1 FUEL GAS SKID (INCL FINE FILTERS) ORDER 0 28-Nov-07 A
14-Jan-08
TG424631A1 FUEL GAS SKID (INCL FINE FILTERS) MANUFACTURE
154 29-Nov-07 A 01-Jul-08 15-Jan-08 01-Jul-08
TG424631W1 FUEL GAS BLOCK INSPECTION - 50% 1 14-Apr-08 15-Apr-08 14-Apr-08 15-Apr-08
TG424633M1 FUEL GAS BLOCK EFU -28D 0 04-Jun-08 04-Jun-08
TG424631X1 FUEL GAS BLOCK (FATS) 1 23-Jun-08 24-Jun-08 23-Jun-08 24-Jun-08
TG424635M1 EX- WORKS FUEL GAS SKID (INCL FINE FILTERS) 0 01-Jul-08 01-Jul-08
TG424632M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
A50180 STORAGE - FUEL GAS SKID 74 01-Jul-08 13-Sep-08
TG424641A1 FUEL GAS SKID (INCL FINE FILTERS) TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG424643M1 FUEL GAS SKID (INCL FINE FILTERS) MHO 0 30-Oct-08 17-Aug-08
CONTROL VALVE BLOCK
CONTROL VALVE BLOCK
222 13-Dec-07 A 30-Oct-08 14-Dec-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
222 13-Dec-07 A 30-Oct-08 14-Dec-07 17-Aug-08TG424904A1 CONTROL VALVE BLOCK INQUIRY/ ORDER 15 13-Dec-07 A 15-Dec-07 A
31-Dec-07 18-Jan-08
TG424901M1 CONTROL VALVE BLOCK HANDOVER INFO 0 14-Dec-07
A
14-Dec-07
TG424903A1 CONTROL VALVE BLOCK TECHNICAL SPECS 10 15-Dec-07 A 16-Dec-07 A
17-Dec-07 28-Dec-07
TG424903M1 CONTROL VALVE BLOCK TECH SPECS COMPLETE 0 15-Dec-07 A
28-Dec-07
TG424905M1 CONTROL VALVE BLOCK ORDER 0 17-Dec-07
A
18-Jan-08
TG424910A1 CONTROL VALVE BLOCK MANUFACTURE 129 18-Dec-07 A 23-Jun-08 21-Jan-08 23-Jun-08
TG424906M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 17-Jan-08 A
18-Jan-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG424951M1 CONTROL AIR UNIT HANDOVER INFO 0 21-Jan-08
A
21-Jan-08
TG424953A1 CONTROL AIR UNIT TECHNICAL SPECS 10 22-Jan-08 A 04-Feb-08 22-Jan-08 04-Feb-08
TG424953M1 CONTROL AIR UNIT TECH SPECS COMPLETE 0 04-Feb-08 04-Feb-08
TG424955A1 CONTROL AIR UNIT INQUIRY/ ORDER 15 05-Feb-08 25-Feb-08 05-Feb-08 25-Feb-08
TG424955M1 CONTROL AIR UNIT ORDER 0 25-Feb-08 25-Feb-08
TG424960A1 CONTROL AIR UNIT MANUFACTURE 91 26-Feb-08 01-Jul-08 26-Feb-08 01-Jul-08
TG424910M1 CONTROL VALVE BLOCK EFU -28D 0 27-May-08 27-May-08
TG424910X1 CONTROL VALVE BLOCK (FATS) 1 16-Jun-08 16-Jun-08 16-Jun-08 16-Jun-08
TG424912M1 EX- WORKS CONTROL VALVE BLOCK 0 23-Jun-08 23-Jun-08
TG424911M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 23-Jun-08 23-Jun-08
TG424960M1 EX- WORKS CONTROL AIR UNIT 0 01-Jul-08 01-Jul-08
A50190 STORAGE - CV &CONTROL AIR BLOCK 74 01-Jul-08 13-Sep-08
TG424920A1 CONTROL VALVE BLOCK TRANSPORT TO THESSALONIKI
47 13-Sep-08* 30-Oct-08 01-Jul-08 17-Aug-08
TG424965A1 CONTROL AIR UNIT TRANSPORT TO THESSALONIKI 47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG424925M1 CONTROL VALVE BLOCK MHO 0 30-Oct-08 17-Aug-08
TG424965M1 CONTROL AIR UNIT MHO 0 30-Oct-08 17-Aug-08
AIR INTAKE SYSTEM
AIR INTAKE SYSTEM
273 12-Jun-07 A 30-Oct-08 01-Jun-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
273 12-Jun-07 A 30-Oct-08 01-Jun-07 17-Aug-08TG425101A1 AIR INTAKE SYSTEM TECHN.SPECIFICATION 20 12-Jun-07 A 12-Jul-07 A
15-Jun-07 12-Jul-07
TG425101M1 AIR INTAKE SYSTEM TECH SPECS COMPL. 0 12-Jul-07 A
12-Jul-07
TG425105A1 AIR INTAKE SYSTEM INQUIRY/ ORDER 25 13-Jul-07 A 16-Aug-07 A
13-Jul-07 16-Aug-07
TG425105M1 AIR INTAKE SYSTEM ORDER 0 17-Aug-07
A
16-Aug-07
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG425106M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 17-Aug-07 A
16-Aug-07
TG425130A1 AIR INTAKE SYSTEM MANUFACTURE - STRUCTURES
207 17-Aug-07 A 02-Jun-08 17-Aug-07 02-Jun-08
TG425120A1 AIR INTAKE SYSTEM MANUFACTURE - MAIN COMPONENTS
228 17-Aug-07 A 01-Jul-08 17-Aug-07 01-Jul-08
TG425140M1 ANTI- ICING SYSTEM EFU -28D 0 03-Sep-07
A
01-Jun-07
TG425110M1 AIR INTAKE SYSTEM EMBEDMENTS/ BASE PLATES EFU - 28D
0 03-Sep-07
A
01-Jun-07
TG425108D1 AIR INTAKE SYSTEM CONNECTION DIAGRAM (TBCD) - FINAL
0 11-Oct-07
A
11-Oct-07
TG425115D1 AIR INTAKE SYSTEM - TYPICAL ERECTION BID DOCUMENT
0 12-Oct-07
A
11-Oct-07
TG425106D1 GT AIR INTAKE SYSTEM P&ID - FINAL ISSUE 0 12-Oct-07 A
13-Sep-07
TG425105D1 GT AIR INTAKE SYSTEM OUTLINE DRAWINGS (INCL.
LOAD PLANS) - FINAL ISSUE
0 30-Oct-07
A
13-Sep-07
TG425107D1 GT AIR INTAKE SYSTEM ELECTRICAL LOADS - FINAL ISSUE
0 30-Oct-07
A
13-Sep-07
TG425145B3 AIR INTAKE SYSTEM DUCT WORK INTERMEDIATE INSPECTION - 50%
2 12-Feb-08 14-Feb-08 12-Feb-08 14-Feb-08
TG425145B2 AIR INTAKE SYSTEM SILENCER PANELS INTERMEDIATE INSPECTION - 50%
1 13-Feb-08 14-Feb-08 13-Feb-08 14-Feb-08
TG425145B5 AIR INTAKE SYSTEM FILTERHOUSE INTERMEDIATE INSPECTION -75%
2 21-Apr-08 23-Apr-08 21-Apr-08 23-Apr-08
TG425145B4 AIR INTAKE SYSTEM DUCT WORK INTERMEDIATE INSPECTION - 75%
2 21-Apr-08 23-Apr-08 21-Apr-08 23-Apr-08
TG425116D1 AIR INTAKE SYSTEM - ERECTION EXECUTION DOCUMENT
0 23-Apr-08 23-Apr-08
TG425130M1 AIR INTAKE SYSTEM - STRUCTURES EFU -28D 0 06-May-08 06-May-08
TG425132M1 EX- WORKS AIR INTAKE SYSTEM - STRUCTURES 0 02-Jun-08 02-Jun-08
TG425120M1 AIR INTAKE SYSTEM - MAIN COMPONENTS EFU -28D
0 04-Jun-08 04-Jun-08
TG425145B7 AIR INTAKE SYSTEM DUCT WORK (FAT) 3 19-Jun-08 24-Jun-08 19-Jun-08 24-Jun-08
TG425145B8 AIR INTAKE SYSTEM FILTERHOUSE (FAT) 3 19-Jun-08 24-Jun-08 19-Jun-08 24-Jun-08
TG425145B6 AIR INTAKE SYSTEM SILENCER PANELS (FATS) 1 23-Jun-08 24-Jun-08 23-Jun-08 24-Jun-08
TG425145B1 AIR INTAKE SYSTEM FILTERHOUSE INTERMEDIATE INSPECTION -50%
2 01-Jul-08 03-Jul-08 01-Jul-08 03-Jul-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG425121M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
TG425118D1 AIR INTAKE SYSTEM - O&M DOCUMENTATION 0 01-Jul-08 01-Jul-08
TG425117D1 AIR INTAKE SYSTEM - COMMISSIONING DOCUMENTATION
0 01-Jul-08 01-Jul-08
TG425122M1 EX- WORKS AIR INTAKE SYSTEM - MAIN COMPONENTS
0 01-Jul-08 01-Jul-08
A50200 STORAGE - AIR INTAKE SYSTEM 74 01-Jul-08 13-Sep-08
TG425135A1 AIR INTAKE SYSTEM TRANSPORT TO THESSALONIKI - STRUCTURES
46 13-Sep-08 29-Oct-08 02-Jun-08 18-Jul-08
TG425125A1 AIR INTAKE SYSTEM TRANSPORT TO THESSALONIKI - MAIN COMPONENTS
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG425125M1 AIR INTAKE SYSTEM - MAIN COMPONENTS MHO 0 30-Oct-08 17-Aug-08
GT AUXILIARY BLOCK
GT AUXILIARY BLOCK
212 05-Nov-07 A 16-Oct-08 26-Nov-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
212 05-Nov-07 A 16-Oct-08 26-Nov-07 17-Aug-08TG427101M1 AUXILIARY BLOCK HANDOVER INFO 0 05-Nov-07
A
26-Nov-07
TG427103A1 AUXILIARY BLOCK TECHNICAL SPECS 10 06-Nov-07 A 10-Nov-07 A
27-Nov-07 10-Dec-07
TG427103M1 AUXILIARY BLOCK TECH SPECS COMPLETE 0 12-Nov-07
A
10-Dec-07
TG427104A1 AUXILIARY BLOCK INQUIRY/ ORDER 15 13-Nov-07 A 03-Dec-07 A
11-Dec-07 31-Dec-07
TG427104M1 AUXILIARY BLOCK ORDER 0 04-Dec-07
A
31-Dec-07
TG427113M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 04-Dec-07 A
31-Dec-07
TG427106A1 AUXILIARY BLOCK MANUFACTURE 141 05-Dec-07 A 17-Jun-08 01-Jan-08 17-Jun-08
TG427106B1 AUXILIARY BLOCK INTERMEDIATE INSPECTION - 50%
1 24-Mar-08 25-Mar-08 24-Mar-08 25-Mar-08
TG427106M1 AUXILIARY BLOCK EFU -28D 0 21-May-08 21-May-08
TG427106C1 AUXILIARY BLOCK (FATS) 1 09-Jun-08 10-Jun-08 09-Jun-08 10-Jun-08
TG427107M1 EX- WORKS AUXILIARY BLOCK 0 17-Jun-08 17-Jun-08
TG427114M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 17-Jun-08 17-Jun-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
A50210 STORAGE - AUXILIARY BLOCK 74 17-Jun-08 30-Aug-08
TG427108A1 AUXILIARY BLOCK TRANSPORT TO THESSALONIKI 47 30-Aug-08* 16-Oct-08 01-Jul-08 17-Aug-08
TG427108M1 AUXILIARY BLOCK MHO 0 16-Oct-08 17-Aug-08
GT - DRAIN EQUIPMENT
GT - DRAIN EQUIPMENT
200 25-Jan-08 30-Oct-08 24-Dec-07 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
200 25-Jan-08 30-Oct-08 24-Dec-07 17-Aug-08TG427501M1 GT DRAIN EQUIPMENT HANDOVER INFO 0 25-Jan-08 24-Dec-07
TG427503A1 GT DRAIN EQUIPMENT TECHNICAL SPECS 10 25-Jan-08 08-Feb-08 25-Dec-07 07-Jan-08
TG427503M1 GT DRAIN EQUIPMENT TECH SPECS COMPLETE 0 08-Feb-08 07-Jan-08
TG427505A1 GT DRAIN EQUIPMENT INQUIRY/ ORDER 15 08-Feb-08 29-Feb-08 08-Jan-08 28-Jan-08
TG427505M1 GT DRAIN EQUIPMENT ORDER 0 29-Feb-08 28-Jan-08
TG427506M1 ASSURE ECC COMPLIANCE AT PURCHASE ORDER 0 29-Feb-08 28-Jan-08
TG427510A1 GT DRAIN EQUIPMENT MANUFACTURE 88 29-Feb-08 01-Jul-08 29-Jan-08 01-Jul-08
TG427510M2 GT DRAIN EQUIPMENT EFU -28D 0 04-Jun-08 04-Jun-08
TG427516B1 GT DRAIN EQUIPMENT (FAT) 1 23-Jun-08 24-Jun-08 23-Jun-08 24-Jun-08
TG427512M1 ECC COMPLIANCE FINAL CHECK - UNIT 1 0 01-Jul-08 01-Jul-08
TG427511A1 EX- WORKS GT DRAIN EQUIPMENT 0 01-Jul-08 01-Jul-08
A50220 STORAGE - DRAIN EQUIPMENT 74 01-Jul-08 13-Sep-08
TG427515A1 GT DRAIN EQUIPMENT TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG427515M1 GT DRAIN EQUIPMENT MHO 0 30-Oct-08 17-Aug-08
FOUNDATION ANCHORS & TEMPLATES / SIKADUR
FOUNDATION ANCHORS & TEMPLATES / SIKADUR
186 07-Nov-07 A 28-Sep-08 11-Jan-08 30-Jul-08BLOCK 1 GT 11
BLOCK 1 GT 11
186 07-Nov-07 A 28-Sep-08 11-Jan-08 30-Jul-08TG429410A1 GT FOUNDATION PLATES & ANCHORS TECH SPECIFICATION
5 07-Nov-07 A 10-Nov-07 A
11-Jan-08 17-Jan-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration TG429410M1 GT FOUNDATION PLATES & ANCHORS TECH
SPECIFICATION
0 12-Nov-07
A
17-Jan-08
TG429414A1 GT FOUNDATION PLATES & ANCHORS INQUIRY/
ORDER
5 12-Nov-07 A 16-Nov-07 A
18-Jan-08 24-Jan-08
TG429414M1 GT FOUNDATION PLATES & ANCHORS ORDER 0 21-Nov-07 A
24-Jan-08
TG429420A1 GT FOUNDATION PLATES & ANCHORS MANUFACTURE
137 22-Nov-07 A 30-May-08 25-Jan-08 30-May-08
TG429448A1 GROUTING (SIKADUR) GENO TECHNICAL SPECIFICATION
5 22-Apr-08 28-Apr-08 22-Apr-08 28-Apr-08
TG429448M1 GROUTING (SIKADUR) GENO TECHNICAL SPEC COMPL.
0 28-Apr-08 28-Apr-08
TG429456A1 GROUTING (SIKADUR) GENO INQUIRY/ ORDER 5 29-Apr-08 05-May-08 29-Apr-08 05-May-08
TG429420M1 FOUNDATION ANCHOR BOLTS EFU -28D 0 05-May-08 05-May-08
TG429456M1 GROUTING (SIKADUR) GENO ORDER 0 05-May-08 05-May-08
TG429458A1 GROUTING (SIKADUR) GENO MANUFACTURE 29 06-May-08 13-Jun-08 06-May-08 13-Jun-08
TG429425M1 EX- WORKS GT FOUNDATION PLATES & ANCHORS 0 30-May-08 30-May-08
A50230 STORAGE -FOUNDATION PLATES & ANCHORS 74 30-May-08 12-Aug-08
TG429459M1 GROUTING (SIKADUR) GENO EX WORKS 0 13-Jun-08 13-Jun-08
TG429470A1 GROUTING (SIKADUR) GENO TRANSPORT TO THESSALONIKI
47 12-Aug-08 28-Sep-08 13-Jun-08 30-Jul-08
TG429440A1 GT FOUNDATION PLATES & ANCHORS TRANSPORT TO THESSALONIKI
47 12-Aug-08 28-Sep-08 30-May-08 16-Jul-08
TG429474M1 GROUTING (SIKADUR) GENO MHO 0 28-Sep-08 30-Jul-08
TG429444M1 GT FOUNDATION PLATES & ANCHORS MHO 0 28-Sep-08 16-Jul-08
GT FIELD ASSEMBLY & COMMISSIONING MATERIAL
GT FIELD ASSEMBLY & COMMISSIONING MATERIAL
194 01-Dec-07 A 30-Oct-08 04-Feb-08 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
194 01-Dec-07 A 30-Oct-08 04-Feb-08 17-Aug-08TG429501M1 SPARE MATERIAL HANDOVER INFO 0 01-Dec-07
A
04-Feb-08
TG429503A1 SPARE MATERIAL TECHNICAL SPECS 10 01-Dec-07 A 06-Dec-07 A
05-Feb-08 18-Feb-08
TG429505A1 SPARE MATERIAL INQUIRY/ ORDER 5 07-Dec-07 A 11-Dec-07 A
19-Feb-08 25-Feb-08
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334
Duration
TG429503M1 SPARE MATERIAL TECH SPECS COMPLETE 0 07-Dec-07
A
18-Feb-08
TG429505M1 SPARE MATERIAL ORDER 0 12-Dec-07
A
25-Feb-08
TG429510A1 SPARE MATERIAL MANUFACTURE 143 13-Dec-07 A 01-Jul-08 26-Feb-08 01-Jul-08
TG429510M1 SPARE MATERIAL EFU -14D 0 18-Jun-08 18-Jun-08
TG429512M1 EX- WORKS SPARE MATERIAL 0 01-Jul-08 01-Jul-08
A50240 STORAGE - SPARE MATERIAL 74 01-Jul-08 13-Sep-08
TG429520A1 SPARE MATERIAL TRANSPORT TO THESSALONIKI 47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG429525M1 SPARE MATERIAL MHO 0 30-Oct-08 17-Aug-08
GT SPECIAL TOOLS
GT SPECIAL TOOLS
198 27-Dec-07 A 30-Oct-08 28-Jan-08 17-Aug-08BLOCK 1 GT 11
BLOCK 1 GT 11
198 27-Dec-07 A 30-Oct-08 28-Jan-08 17-Aug-08TG429601M1 SPECIAL MACHINE TOOL HANDOVER INFO 0 27-Dec-07
A
28-Jan-08
TG429603A1 SPECIAL MACHINE TOOL TECHNICAL SPECS 10 27-Dec-07 A 04-Jan-08 A
29-Jan-08 11-Feb-08
TG429603M1 SPECIAL MACHINE TOOL TECH SPECS COMPLETE 0 04-Jan-08 A
11-Feb-08
TG429605A1 SPECIAL MACHINE TOOL INQUIRY/ ORDER 5 05-Jan-08 A 09-Jan-08 A
12-Feb-08 18-Feb-08
TG429605M1 SPECIAL MACHINE TOOL ORDER 0 10-Jan-08
A
18-Feb-08
TG429610A1 SPECIAL MACHINE TOOL MANUFACTURE 96 11-Jan-08 A 01-Jul-08 19-Feb-08 01-Jul-08
TG429610M1 SPECIAL MACHINE TOOL EFU -14D 0 18-Jun-08 18-Jun-08
TG429612M1 EX- WORKS SPECIAL MACHINE TOOL 0 01-Jul-08 01-Jul-08
A50250 STORAGE - SPECIAL TOOLS 74 01-Jul-08 13-Sep-08
TG429620A1 SPECIAL MACHINE TOOL TRANSPORT TO THESSALONIKI
47 13-Sep-08 30-Oct-08 01-Jul-08 17-Aug-08
TG429625M1 SPECIAL MACHINE TOOL MHO 0 30-Oct-08 17-Aug-08
WASH CART/ SKID
WASH CART/ SKID
206 09-Jan-08 A 30-Oct-08 11-Feb-08 17-Aug-086 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 334