MONTHLY PROGRESS REPORT

N/A
N/A
Protected

Academic year: 2021

Condividi "MONTHLY PROGRESS REPORT"

Copied!
10
0
0

Testo completo

(1)

ALSTOM

MONTHLY PROGRESS

REPORT

220MW

COMBINED CYCLE COGENERATION PLANT

SKOPJE

February 2008

(01.02.2008-29.02.2008)

(2)

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY ...2

2. ENVIRONMENT HEALTH & SAFETY STATISTICS...2

3. CONTRACTORS PERSONNEL...2

4. PROGRESS SUMMARY...2

4.1. ENGINEERING STATUS ... 2

4.1.1. CIVIL INPUT ENGINEERING ... 3

4.1.2. MECHANICAL ENGINEERING... 3

4.1.3. ELECTRICAL ENGINEERING ... 3

4.1.4. GT Control System ... 3

4.1.5. ST Engineering (including Control System) ... 3

4.2. PROCUREMENT STATUS ... 3

4.2.1. MAJOR SYSTEMS OVERVIEW ... 4

4.2.2. SHIPPING & TRANSPORT ... 6

4.3. CONSTRUCTION AND COMMISSIONING... 6

4.3.1. MOBILIZATION ... 7

4.3.2. CONSTRUCTION ... 7

4.3.3. COMMISSIONING ... 7

5. PROJECT SCHEDULE & PROGRESS...7

5.1. SCHEDULES ... 7

5.2. CRITICAL PATH ANALYSIS ... 7

5.3. PROGRESS CURVES... 7

6. PAYMENT STATUS ...7

7. VARIATIONS TO CONTRACT AND CHANGE ORDERS ...8

8. QUALITY ASSURANCE & CONTROL ...8

9. MAJOR CONCERNS AND CORRECTIVE ACTIONS ...8

(3)

1. EXECUTIVE SUMMARY

• This report is the ninth report established by Alstom (Switzerland) related to Alstom

Scope of work as defined in the “220MW CCPP SKOPJE / MACEDONIA Joint Contract Agreement”

• This report covers the period from 1st of February 2008 to 29th of February 2008. • Main events during the period:

o Engineering is on-going

The main foundation design is ordered based on the soil investigation and soil bearing capacity received from GAMA on the 21st February.

GAMA requested information in the event of equipment re-assembly at site. ALSTOM is waiting for the official confirmation for the delivery disassembled of the Gas turbine and its reassembly at site.

o HRSG missing information impacts ST engineering o 4th invoice payment related to rotor forgings received

2. ENVIRONMENT HEALTH & SAFETY STATISTICS N.a.

3. CONTRACTORS PERSONNEL No changes during the period. 4. PROGRESS SUMMARY

4.1. ENGINEERING STATUS

Engineering is ongoing and some purchase orders have been prepared during the reporting period.

Important input documents from GAMA are not complete and for some cases evening missing. These documents are preventing ALSTOM to proceed with engineering work and may have further an impact, for already placed purchase orders, see attachment 4 for details.

GAMA send feedback to several documents during the reporting period, however GAMA’s review of some engineering document are still overdue.

(4)

4.1.1. CIVIL INPUT ENGINEERING

The main foundation design is ordered based on the soil investigation and soil bearing capacity received on the 21st February from GAMA.

4.1.2. MECHANICAL ENGINEERING

An updated noise study was revived on 4th February from GAMA together with a

request of reducing the noise from the air intake system. A phone conference was held on the 14th February to further clarify the requirements. ALSTOM has

requested a quotation from G+H Schallschütz, based on the requirements from GAMA.

The outstanding information from seismic concept is a risk for mainly the air intake system, however also other equipments might be affected. An updated seismic concept was send to Colenco on the 29th February however the comments made

on the 19th November 2008 in CHAP/GPS/0159 is still valid.

4.1.3. ELECTRICAL ENGINEERING

Engineering ongoing according to schedule, except for:

• The design for the ST neutral point cubicle is on hold. Input received on the 29th February. ALSTOM will review the input.

ALSTOM commented the short circuit calculation on the 4th November 2007 ref.

CHAP/GPS/0107 and its revision B on the 8th February 2008 ref. CHAP/GPS/0224.

The minimum grid short circuit capacity at 110kV connection point is urgently needed to calculate the power system stabilizer parameters, which are stated in the Transfer Function Diagram. The transfer function diagram is required to achieve grid code compliance.

4.1.4. GT Control System

Engineering ongoing according to schedule. 4.1.5. ST Engineering (including Control System)

Engineering

Engineering design- ongoing.

Preparation of the technical specifications and documentation for the turbine factory

(5)

4.2.1. MAJOR SYSTEMS OVERVIEW

4.2.1.1 GAS TURBINE

Below are summarized the status of placed purchase orders as of 31.01.2008.

DESCRIPTION PO Nr. PO Date Country of Origin

Thermal Block total incl. FDS ALSTOM Mannh Internal 31.07.2007 D Air Cooled Generator GG423

(Swiss Part) ALSTOM Birr P039/2006 10-Aug-07 CH

Air Cooled Generator GG423

(Polish Part) ALSTOM Birr/ Wrozlaw P039/2006 10-Aug-07 PL

Steam Turbine complete ALSTOM Polska 4500352073 28-Feb-07 PL

Steam Turbine generator ALSTOM Power

Turbomachiness 4500354715 31-Mrz-07 FR

Air intake manifold with

on/off-line cleaning MTC 4500361135 20-Nov-07 CZ

Equalizing section BRADEN 4500367738 27-Jun-07 D

Thermal Insulation for EGD 1

and equalizing section Wendt 4500378530 3-Sep-07 D

Exhaust gas diffuser 1 with

NOX measuring device HRPPL 4500355099 15-Nov-07 HR

Blow off silencer AAF CN 4500365882 30-Jun-07 CN

Blow off valves Avintos 4500390161 14-Nov-07 I

Anti Icing Valve Avitnos 4500399769 2-Feb-08 I

Fuel Gas Filter Skid

w.Flowmeter Petrogas 4500391776 28-Nov-07 NL

Control valve block KELAG 4500392881 17-Dez-07 CH

Control Air Unit Reis 4500401788 7-Feb-08 CH

Air Intake System (GT ,

outdoor) G+H 4500376123 17-Aug-07 D/ CZ

GT auxiliaries block (for open

cooling circuit) Rockfin 4500392595 4-Dez-07 PL

GT foundation anchors and

plates MTC 4500363841 21-Nov-07 CZ

Sikadur Sika 4500400120 29-Jan-08 CH

GT erection material AWB 4500393365 12-Dez-07 D

GT special tools and devices &

X x Ausfahrvorric. AWB 4500374530 9-Aug-07 D

Wash Cart / skid Turbotect 4500398882 24-Jan-08 NL

Lube Oil Purifier Pall 4500398883 23-Jan-08 GB

Fire Fighting System GT Silvani 4500403997 20-Feb-08 I

Gas Detection System GT Tantronic 4500401950 11-Feb-08 CH

CLTD Minimax 4500401378 6-Feb-08 DE

MP/LP Piping 50 Hz DEE 4500365528 30-Jun-07 IND

Insulation for Piping Novisol 4500389362 12-Nov-07 CH

Platforms and ladders MTC 4500335368 10-Nov-06 CZ

Enclosure outdoor GT13E2 Wendt 4500378656 5-Sep-07 D, TCH

(6)

Low Voltage Switchgear ABB Lenzburg 4500392349 30-Nov-07 CH

DC/ UPS Gutor 4500386301 18-Okt-07 CH

Synchronization, Measuring,

Metering ALSTOM Belfort 4500392031 29-Nov-07 F

Generator Protection ABB Schweiz 4500391709 27-Nov-07 CH

Generator Circuit Breaker ABB Zürich 4500383042 27-Sep-07 CH

Neutral Point Cubicle ALSTOM Levallois 4500394293 12-Dez-07 F

SSD & Geno Exitation Coltrol Converteam 4500384752 9-Okt-07 D

Generator Exitation & Voltage

Control Ocrev 4500392839 4-Dez-07 I

Electrical Modules Gföllner 4500389774 13-Nov-07 A

Further POs were placed:

• 02. Feb. 2008 4500399769 Anti Icing Valve AVINTOS • 20. Feb. 2008 4500403997 Fire Fighting System SILVANI • 11. Feb. 2008 4500401950 Gas Detection System TANTRONIC • 06. Feb. 2008 4500401378 CLTD MINIMAX

GT Rotor: Rotor welding Ultrasonic test has been confirmed to TE-TO [letter 605-GPS-TTA-0202] to take place on 6th and 7th of March 2008. ALSTOM did not receive confirmation

from TE-TO and will proceed with the test. In case TE-TO s not present, test results will be sent to TE-TO.

4.2.1.2. STEAM TURBINE

Purchasing & Procurement

The status of placed Purchase orders

PO date PO-Nr PO description Name / Supplier

28.11.2006 internal Engineering ALSTOM Power Sp. z o.o.

24.11.2006 23/120031 Turbine 8CK76 ALSTOM Power Sp. z o.o.

02.01.2007 23/12035 Patterns for turbine castings ALSTOM Power Sp. z o.o.

10.10.2007 23/120044 Main Condenser ZBA S.A

10.10.2007 23/120044 Heat Exchanger ZBA S.A

03.12.2007 23/ 770111 Stop & Ctrl. Flaps sec. Steam Krombach

15.11.2007 23/ 120047 Vacuum pumps Gardner Denver Nash

03.12.2007 23/ 770108 Expansion joints Witzenmann

11.12.2007 23/ 770114 HP & LP bypass stations CCI Valve Technology GmbH. 20.12.2007 23/ 120050 Steam Turbine controller ABB

17.01.2008 23/ 770117 Taprogge System Taprogge

15.02.2008 23/120049 Oil supply unit Rockfin

• Turbine gland steam system control valves

offers received, technical and commercial evaluation ongoing, PO is planned to be placed by end of February 2008

(7)

• Turbine gland steam system steam cooler

offers collected, technical & commercial evaluation ongoing, PO is planned to be placed end of February 2008

• Turbine gland steam system stop valves

offers collected, technical & commercial evaluation ongoing, PO is planned to be placed end of February 2008

• Turbine drainage system stop valves

offers collected, technical & commercial evaluation ongoing, PO is planned to be placed end of February 2008

• PO for condensate pumps will be placed end of February 2008

4.2.1.3. OTHER KEY SYSTEMS

a. GSU Transformer N.a to ALSTOM scope b. Hybrid Cooling Tower N.a to ALSTOM scope c. Gas Compressor n.a

4.2.1.4. BALANCE OF PLANT

N.a

4.2.2. SHIPPING & TRANSPORT

• Stator of ST Generator and its accessories have been delivered and stored at Warehouse in Rotterdam/NL. AIM and Foundation Parts will be picked-up in KW9/10 and should be in Rotterdam after Easter (KW13). • Inspection should be done at warehouse in Rotterdam for these Parts.

Inspection time will be defined in due course.

• Alstom did not receive any comment to their letter 605-LT-GPA-TTA-M0173 dated 28 January 2008 (also ref. CHAP/TETO/031 dated 28 January 2008, concerning the “equipment or piece of equipment Owner or it’s Engineer would like to inspect as per clause 7.3 of the contract”

(8)

4.3.1. MOBILIZATION

• N.a

4.3.2. CONSTRUCTION

• N.a

4.3.3. COMMISSIONING

No information to report during report period.

5. PROJECT SCHEDULE & PROGRESS

5.1. SCHEDULES

• The current update of the OTS is attached 5.2. CRITICAL PATH ANALYSIS

• Critical path is indicated in red in the attached OTS.

5.3. PROGRESS CURVES

• No update during the period

6. PAYMENT STATUS

• Advance payment has been paid to the consortium in 31 may 2007. • Performance bond has been issued and submitted to the Owner.

• Applications to Serv for the Financial Closure of ALSTOM portion have

been submitted.

• Finance Security SBLC opened by TETO

• Amendment to performance bond as defined in Supplement 1 to

Contract Agreement issued to TETO

• Second invoice submitted by ALSTOM to TE-TO. Payment due by

25.08.2007

• Second invoice (7.161.197 €) paid by Landesbank Berlin on 28th of

August.

• Milestone “First issue of GT and ST P&IDs” has been reached on August

28th, (letter GPS-TTD-2007-0055 dd 28.08.07). Third invoice has been

submitted by ALSTOM to TE-TO letter CHAP/TETO/0019 dd 11.09.2007. Payment due by 11.10.2007

• Request for disbursement of third payment sent to LBB letter

CHAP/LBB/002 dd 16/09/2007.

• Third payment (4.774.131.50 €) received from LBB on 5th of October.

• 4th invoice related to payment of Rotor forgings submitted by ALSTOM to

TE-TO. As these long lead items were ordered long before the suspension started, this particular activity could not be suspended.

(9)

• 4th invoice rejected by TETO (TT-08-0105-GPS,GN,CPE Invoice n°4

rejection dated 18.01.

• Following TE-TO’s request TT-08-0109-GPS,GN,LBB dated 24.01.2008,

Notification to LBB of the SBLC G1070713AE03144 cancellation has been sent on 28.01.2008.

• 4th invoice resubmitted to TETO (CHAP/TETO/0032 Invoice n°4 dated

07.02.2008.

• 4th invoice payment received from LBB on 21st of February 2008

7. VARIATIONS TO CONTRACT AND CHANGE ORDERS

• Supplement 1 to Contract agreement signed • Supplement 2 to Contract agreement signed • Supplement 3 to Contract agreement signed

• Variation n°1 has been submitted to TE-TO by the consortium • Claim n°4 has been submitted to TE-TO by the consortium

8. QUALITY ASSURANCE & CONTROL

• No point to be reported during the period

9. MAJOR CONCERNS AND CORRECTIVE ACTIONS

Missing of incomplete documentation from GAMA.(acc. To JCA)

• HRSG characteristics (including start-up curves and operational parameters range) - within the package received on 19.11.2007 start-up curves are missing and boundary parameters are not given.

• Cooling water diagram and parameters (definition of minimal, nominal and maximal conditions) – still not yet received by TSR. Together with the fact, that steam turbine design has been frozen during the 2nd Design Review dd 10.12.2007 and the manufacturing process is progressing – an exposure of underperformance exists in case GAMA comes up with the cooling water parameters significantly deviating from the contractual boundaries. This risk cannot be verified without GAMA’s input.

LIST OF DELAYS

1 Condensate pumps Claim has been included in consortium claim for suspension.

(10)

2 Foundations design Claim has been included in consortium claim for suspension

10. APPENDICES

1. Overall Time Schedule (OTS) 2. Skopje Progress curves

3. Status of Engineering document received from GAMA

Legend

Review Expected within 5 days Review Delayed

4. Engineering Documentation Submitted to GAMA

Riferimenti

Documenti correlati

modelling of temperature and pore pressure distribution in the embankment during flooding processes SGEM 2015: Science and Technologies in Geology, Exploration and Mining :

On the other hand for a vertical stress of 800 kPa, the values of the collapse reduction ratio vary between 30% to 65%.Thus, the behavior of a treated soil by

After the conduction of the interface shear test, the cemented layer of the interface obtained at different initial degree of saturation was observed by using a 200×

In particular, people who are highly sensi- tive to the social facets of technology because of their external Locus of Control (LoC) and/or their neuroticism tend to reject

The obtained SGBs can be subdivided into 3 main groups (Figure 1B): i) the set of 1,134 known SGBs (kSGBs) that contain at least one reconstructed and one reference genome

Fotogramma tratto dal video “A Medjugorje i momenti dell’Apparizione alla Veggente Mirjana - 2 marzo 2020”, caricato sul canale YouTube “Medjugorje tutti i giorni”,

javanicum inoculation promoted the highest increase in aggregate stability with time, especially in the silt loam soil, which showed higher values than the sandy loam and loamy

A colonic drug delivery system is required to protect a drug during its transit through the upper gastro-intestinal tract and allow its release in the colon (1).. The aim of this