• Non ci sono risultati.

From infrastructure to service: mapping long-distance passenger transport in Italy

N/A
N/A
Protected

Academic year: 2021

Condividi "From infrastructure to service: mapping long-distance passenger transport in Italy"

Copied!
1
0
0

Testo completo

(1)

15°0'0"E 10°0'0"E 45 °0 '0" N 40 °0 '0" N 45 °0 '0" N 40 °0 '0" N 15°0'0"E 10°0'0"E 1:7.000.000 0 50 100 200 300 km 1:7.000.000 0 50 100 200 300 km                                         !    !          ! !         15°0'0"E 10°0'0"E 45 °0 '0" N 40 °0 '0" N 15°0'0"E 10°0'0"E 0 50 100 200 300 km 1:3.500.000

 



)02

4+(

 

' (. $/' 

3(*. (/4

The category Economy identifies trips made for personal reasons by people traveling alone,

20. 

 

20. 



without the availability of its own means of transport, low value of time and high level of perception of the tariff.

$4$

052&(3

© Journal of Maps, 2015

(/(2$-,3('

0343

"8#

Zone of Origin

2$/31 024

(26,&(3

511 -7

Rail Services

(Bidirectional) 20-40 per day 10-20 per day up to 10 per day 40-60 per day 60-150 per day more than 150 per day

Coach Services

(Bidirectional) 90-150 per week 30-90 per week up to 30 per week 150-240 per week 240-600 per week more than 600 per week

Air Services

(Bidirectional) 6-10 per day 2-6 per day up to 2 per day 10-16 per day 16-40 per day more than 40 per day Politecnico di Milano - Milano (Italy)

 $%02$402,0' ,0-,4,&$' (,2$31 024,

Andrea Debernardi Emanuele Ferrara

45',0 - Monza (Italy)

2015

Raffaele Grimaldi, Antonio Laurino, Alberto Bertolin Paolo Beria

The database have been compiled from real timetables NTV, OAG and coach operators, in 2013/14. Transport supply are refferring to the periods: - winter 2014 for rail services.

- springtime 2013 for air services;

collected by authors from websites of Trenitalia,

- winter 2013/14 for coach services;

0-30 30-60 60-90 90-120 120-150 150-180 more than 180 absence of connection

WGS 1984 UTM Zone 32N

Projection: Transverse Mercator False Easting: 500.000,0000 False Northing: 0,0000 Central Meridian: 9,0000 Scale Factor: 0,9996 Latitude Of Origin: 0,0000 Linear Unit: Meter Datum: WGS 1984

002' ,/$4(

734(.

M ul tim od al Pl an e Tr ain             !    !                         

4$-,$/

-0/*

' ,34$/&(

42$/31 024

3511 -7

,/

 

$/' 

*(/(2$-,3('

&0343

0)

' ,))(2(/4

42$/31 024

. 0' (3



 







 



 

 

 



  

            !    !  ! !             Co ac h

Riferimenti

Documenti correlati

Piano 2 Materiali: Travertino, calcare SX: Fasi: 2 Apertura: Finestra Intradosso: Architrave Estradosso: Architrave CDX: Fasi: 2, 3 Apertura: Portale Intradosso: A tutto

This topic assumes a particular importance in the case of both stepped gabion weirs and rock grade control structure because of the different scour processes that

A study designed to determine the effective- ness of radioiodine scanning in detecting recur- rence of thyroid cancer after thyroid ablation and the withdrawal of l-T 4 after

In normal characters, name of the variety as registered in the country and its registered synonyms, country, year of the national catalogue's last update available,

Among the di fferent tested models, one pool OLS is shown (Model 1) in which the dependent variable (i.e., the number of PPIs) has been connected to several geographical

The existence of this source suggests that a signi ficant population of strongly lensed, high-redshift quasars could have been missed by previous surveys, as standard color

Prof.ssa Enriqueta Llabres Valls, Bartlett School of Architecture Proposta di riqualificazione urbana per la zona di South Dagenham a Londra. Requalification intervention proposal

In the following tables the annual revenues for the long distance passenger transport service are reported. The PV of long distance passenger transport service revenues is