• Non ci sono risultati.

• The pSCT camera will be equipped with 25 sensor modules, forming a “backplane” –

N/A
N/A
Protected

Academic year: 2021

Condividi "• The pSCT camera will be equipped with 25 sensor modules, forming a “backplane” –"

Copied!
19
0
0

Testo completo

(1)

• The pSCT camera will be equipped with 25 sensor modules, forming a “backplane”

– each module consists of 64 SiPM sensors segmented in 4 independent SiPM carriers (“PCBs”),

connected to a dedicated TARGET7-based module, that communicates with a high-speed backplane.

• The INFN effort, agreed with the SCT community, is to provide at least 25 sensor modules, i.e.

100 PCBs, each housing 16 SiPMs, for a total of 1600 SiPMs.

– Actually only 16 out of 25 modules will be mounted, leaving room for 9 additional modules to be mounted in the next year

• The module and mechanical design and the front-end electronics were adapted to equip the focal plane of the Prototype Schwarzschild-Couder Telescope (pSCT), which will be operated at the VERITAS site in Arizona in 2017.

SiPM = 6,24 x 6,24

Dimensioni Modulo = 53,8 x 53,8 Spazio x Bonding= 0,51 Passo di ripetizione = 6,75 Distanza SiPM-bordo = 0,16

A4

V.Postolac he

R1

CTA MODULE

PESO: $PRPSHEET:{Peso}

$PRPSHEET:{Fine}

FR4 MODULE 6 x 6 x SiPM Separati

FOGLIO 1 DI 1 SCALA:2:1

N. DISEGNO TITOLO:

REVISIONE NON SCALARE IL DISEGNO

MATERIALE:

DATA FIRMA

INFN PERUGIA

DISEGNATO

SBAVATURA E BORDI NETTI INTERRUZIONE DEI

NO ME

VERIFIC ATO APPROVATO FATTO

FINITURA:

ANGOLARE:

QUALITA' SE NO N SPECIFICA TO:

QUOTE IN MILLIMETRI FINITURA SUPERFICIE:

TOLLERANZE:

LINEARE:

15/02/2016

6,24

0,16 6,24

0,51

6,75

53,80

0,51

53,80

0,16

(2)

SiPM 6x6 Step Repet 6,75 TITOLO:07/03/2016 R1

I.N.F .N. P ERU GIA

DISEGNATOVERIFICATOAPPROVATO INTERRUZIONE DEI

LINEARE:

PESO: $PRPSHEET:{Peso} A3

CTA MO DULE

FATTOQUALITA' $PRPSHEET:{Fine}

ANGOLARE: FINITURA:

TOLLERANZE: BORDI NETTI

NOMEFIRMADATA

MATERIALE: NON SCALARE IL DISEGNOREVISIONE

FR4 N. DISEGNO

SCALA:2:1FOGLIO 1 DI 1 SE NON SPECIFICATO:QUOTE IN MILLIMETRIFINITURA SUPERFICIE: SBAVATURA E

PCB_Mod_6x6_Simetrico V.Postolache A

6,75 Step Repet

6,75 Step Repet 0,10 0,30

53,80 0,16

53,80

0,51

0,16 6,24 0,11 0,51

53,80

1,51

BBONDING PAD SCALA 10 : 1 DETTAGLIO B BONDING PAD

SiPM 6x6

DETTAGLIO A SCALA 10 : 1

2,27 1,70

0,30 0,30

0,16

0,51 0,10 0,11

2,27

6,24

64 FBK 6x6mm2

25.80 mm

25.80 mm

53.80 mm

53.80 mm

2 x 25.80 mm = 51.6 mm

~ 2 x 25.8

0 mm = ~ 51.6 mm

Module unit: formed by 4 independent quadrants (“PCB”)

Quadrants (”PCB”)

(3)

• A copper block is used to thermally and mechanically couple the PCB to the camera pods to form a module in a backplane

• It is placed on the PCB back-side with high precision in both X, Y and Z coordinates, before the

SiPM placement. This is crucial for the performance of the camera.

• More than 100 copper blocks are available for the assembly

• The requirements for alignment precision are of ~300 mm in XY plane and < 2° in z (vertical) axis

• Custom mechanical holders are

being produced with holes and

position pins to achieve a high

accuracy for the alignment (~10

mm) in the xy plane and z direction

(<0.1°).

(4)

Perugia activity progress

• Jig for SiPM gluing, bonding and transport

– 2 ready: metrology to be done – 2 to be done in Perugia workshop

• Board fabrication and assembly

– 100 final boards ready by Artel srl

– Components and copper blocks soldered – Metrology done

– Continuity test to be done

• SiPM

– Cca 2500 pcs in Perugia

– Single sipm storage box fabrication: 11/25 ready in Perugia workshop

• SiPM assembly start: second half of September

6

(5)

Livello SiPM

5

9

1,84

9

102

14 9 120

380

5 0,80 9 14

1,84 120

380 B

B A A

UNI EN 22768-1-f per quote senza tolleranzaUNI EN 22768-1-f

27/ 06/ 2016

01 Gluing &Bonding JIG_03 CTA_SiPM_Module

+/ - 0.01 mm. per quote dei fori

PESO : $PRPSHEET:{Peso}

{Fine}

Alluminio A2

FO G LIO 1 DI 1 SC ALA :1/ 1 N. DISEGNO TITOLO :

REVISIO NE NO N SC ALA RE IL DISEG NO

M ATERIALE:

05/ 07/ 2016 V.Postolache

FIRMA NO ME

INTERRUZIO NE DEI

DATA PROG ETTATO

Q UALITA ' FATTO

SBAVA TURA E BO RDI NETTI FINITURA:

A NG O LARE:

R1 I.N.F.N.PERUGIA

V.Postolac he DISEG NATO VERIFIC ATO A PPRO VATO SE NON SPEC IFIC ATO:

Q UOTE IN MILLIM ETRI FINITURA SUPERFIC IE:

TOLLERANZE:

LINEARE:

UNI EN 22768-1-f per quote senza tolleranza SEZIONE A-A

SC ALA 2 : 1

7

0,20

1,50

5,60 SEZIONE B-B

SC ALA 2 : 1 18,90

9

9

14

• The custom jigs to handle the PCB have been designed and are being produced at the PG mechanical workshop

• They have been designed such that up to 27 PCB can be hosted and assembled at the same time

• The jigs will be used to manage the PCBs in all the phases of assembly:

• To place the copper block on the backside, before SiPM placement

• To place SiPM chips with the pick&place machine

• To ship them around

• To bond the SiPMs to input/output lines

• To coat the SiPm surface with UV transparent resin

• Two pairs different jigs were built since the PCBs are of two different, symmetric types

(6)

Jig for SiPM gluing, bonding and transport - 2 ready

- 2 work in progress. Ready in one week

8

(7)

Board mounting on gluing, bonding, transportation jigs.

(8)
(9)

- 100 Boards assembled at ARTEL srl with components and copper blocks (50 Left type and 50 Right type) - Metrology done: analysis in progress

- Electrical test in progress

Board fabrication and assembly

11

(10)
(11)
(12)
(13)
(14)
(15)

Metrology Results

• Good results (8 out of 100 are bad)

• Some unexpected offsets and rotations must be analyzed

• Analysis still in progress

(16)

SiPM: 2500 pcs in Perugia

18

The SiPM must be unglued from the wafer to the single sipm storage boxes

(17)

Electrical Qualification Tests

PCB multiplexer

Test Station

1

16

• After the assembly, the PCBs are electrically tested

• Tests are made using Semtek multiplexer with 16 channels connected through the PCB connector

• Circuit design ready, boards ready 5/9

Riferimenti

Documenti correlati

In this study, we investigated the single nucleotide polymorphisms (SNPs) rs7574865 (G &gt; T) and rs3024839 (T &gt; C) in STAT4 and rs3747517 (C &gt; T) and rs1990760 (C &gt; T)

chopper, working at frequencies below 200 Hz, for preliminary solar chameleon search runs, also taking advantage of the fact that the KWISP membrane orientation in space is such, that

Expression quantitative trait locus (eQTL) analysis using RNA- seq data suggests that index SNPs in nearly half of the identified loci (20/44) are associated with cis gene expression

We also assessed the role of FYB SNPs in the insurgence of autoimmune polyglandular syndrome type III (APSIII), characterized by the simultaneous presence of autoimmune thyroid

vomiting, with a final diagnosis of right ovarian torsion. At that time, the ultrasound imaging was not able to identify the left kidney, the left ovary and uterus. Surgical

controls; RV = right ventricular; TAPSE = tricuspid annular plane systolic excursion; PASP = pulmonary arterial systolic pressure; GLS = global longitudinal strain; EDV =

L’RNA estratto da cellule esposte a concentrazioni di oxaliplatino pari all’IC 50 è stato retrotrascritto e analizzato mediante PCR quantitativa; in tre linee cellulari

Solution proposed by Roberto Tauraso, Dipartimento di Matematica, Universit`a di Roma “Tor Vergata”, via della Ricerca Scientifica, 00133 Roma,