© Bombardier Inc. or its subsidiaries. All rights reserved.
Increase profitability through efficiency and de-risking of technology development
Innovation and technology at the heart of BT strategy
2
Passenger experience 1A
Performance 1B
Life cycle cost proposition 1C
System integration 1D
Standardisation, platform
optimisation and modularisation 2A
Maintain market leadership
and drive top line growth
1
© Bombardier Inc. or its subsidiaries. All rights reserved.
Passenger experience 1A
Performance 1B
Life cycle cost proposition 1C
System integration 1D
Maintain market leadership and drive top line growth 1
Role of innovation in our company strategy
Solving the mobility equation
Increase profitability through efficiency and de-risking of technology development
2 Standardisation, platform
optimisation and modularisation
2A
© Bombardier Inc. or its subsidiaries. All rights reserved.
Passenger experience
ZEFIRO is a benchmark train in terms of speed and comfort
Provide an attractive alternative mode of transport for journeys between Italy’s main cities
Reduce journey time and increase punctuality
Raise the bar in terms of design and comfort
Reduce environmental impact The challenge
The result
With a maximum speed of 380 km/h, V300ZEFIRO is the fastest train ever produced in series in Europe
Exceptionally comfortable interior
Ability to travel while being connected
Power consumption and noise limited by reduced air resistance
Lowest CO2emissions per passenger of all very high speed trains
© Bombardier Inc. or its subsidiaries. All rights reserved.
Performance
Systems allowed operators to run at close to 100% availability during the London Olympics
More passengers: 25-35% increase on previous year’s Transport for London services
High pressure: Press speculation that the transport infrastructure is the major bottleneck
Less time: Reduced ability to carry out maintenance (typically 3 hours vs. 8 hours window)
Increased performance: Safety, reliability, maintainability, availability of the fleet
Trains: Responsible for maintenance of 800 trains
Passengers: 66,7 million passengers on LOROL and London Underground
Performance: Enhanced fleet reliability programmes implemented
Performance: Availability across 800 trains of 99.8%, outperforming contract requirements and expectations
Time: Use of remote monitoring and diagnostics The results
The challenge
© Bombardier Inc. or its subsidiaries. All rights reserved.
Life cycle costs
Innovative concepts on QNGR vehicles to meet customer’s focus on life cycle costs
High focus on vehicle performance
High penalty from customers for failures in service
Fixed price maintenance leading to cost saving opportunity The challenge
The result
Lowered TCO and increased reliability / availability
Establishing partnerships with suppliers and encourage co- developments to optimize costs
Investing in engineering effort to reduce energy consumption, extend component life and reduce maintenance task times
© Bombardier Inc. or its subsidiaries. All rights reserved.
Systems integration
INNOVIA Monorail 300 offers a fully integrated system
Capacity of a metro system without the cost and implementation duration
The challenge
The result
Fast and cost efficient solution with immediate benefits for city and passengers
Urban-fit: sharp curve and steep grad; minimized land intake;
mass transit capacities
Low system and fleet costs
Fast construction with beams fabricated off-site
Cost-effective without need for underground construction
Significant journey-time reduction (Sao Paulo)
Increasing number of cities in the world including Nashville and Melbourne are planning for monorail projects
© Bombardier Inc. or its subsidiaries. All rights reserved.
Role of innovation in our company strategy
Solving the business equation
Increase profitability through efficiency and de-risking of technology development Standardisation, platform optimisation
and modularisation 2A
Increase profitability through efficiency and de-risking of technology development
The challenge
Standardization, platform optimization and modularization
The way forward
© Bombardier Inc. or its subsidiaries. All rights reserved.
One global value chain logic
Based on platforms and standardized building blocks
Operations &
maintenance Project
delivery Products
Platforms Market
Capture of O&M requirements in market and translation into platform
requirements
Development of a global platform for rolling stock and equipment based on standardized building blocks
Product
development based on platform with services built-in
Constant maturity assessments
Anticipation of project delivery
Anticipation of O&M opportunities and requirements
Reduced development cost
Faster time-to-market
Reduced project risk
Empowerment of new business models in service and operations
Extended resources for accelerating innovative solutions
Benefits: fast, lean and efficient product engines Feedback
© Bombardier Inc. or its subsidiaries. All rights reserved.
Optimization of platforms
Reduce complexity costs, lead times and enable higher share of re-use projects
Platform-based product portfolio for wider market segment and for several applications :
Development of new product families
Maintaining and upgrading existing platforms / products
Opportunistic use of legacy products (no investment) The challenge
The way forward
20
10
Current Mid-term
9
6
Current Mid-term
15
8
Current Mid-term
Single deck Double deck Metro
© Bombardier Inc. or its subsidiaries. All rights reserved.
Leading in innovation
Leveraging internal, academic and industrial research network
Internal research & technology
35 development programmes covering vehicle and sub- system platforms
40 innovation projects to foster high risk / high opportunity approaches
5 transversal innovation programmes (e.g. industrial cyber security)
Academic network
Framework partnerships with TU Dresden, TU Karlsruhe and DLR
Direct involvement of universities in development projects (e.g. KTH Stockholm)
Global academia network:
~30 lighthouse universities in core markets
~250 active university relationships
Supplier partnering
Joint roadmap alignment
Joint development activities (80 main partners)
Joint maturity assessments of developments
Intra-industrial network
Joint research programme Shift2Rail1(€920m) under Horizon2020 programme with BT as founding member
Constant collaboration in innovation initiatives (e.g.
EcoRail Initiative of Deutsche Bahn)