• Non ci sono risultati.

leppo C ultural C enter 19A

N/A
N/A
Protected

Academic year: 2021

Condividi "leppo C ultural C enter 19A"

Copied!
1
0
0

Testo completo

(1)

7

0

10

20

1

8

8

9

10

12

12

12

10

7

6

6

JAN

MAXIMUM WIND FLOW SPEED (KTS)

SOLAR ILLUMINANCE ANALYSIS WITH AUTODESK INSIGHTS

LIGHTING LUMINANCE ANALYSIS WITH VELUX SOFTWARE

21of September h:12.30

Rendered interior lighting

Analytical interior lighting

WIND DIRECTION

LIMIT CONDITION ANALYZED WITH AUTODESK FLOW DESIGN:

Month= July

Wind speed = 22 m/s (12kts)

Direction : W

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

N

500

438

375

313

250

188

126

63

Velux lighting simulation software permitted us to

prove the efficiency of our design and material

choi-ces. The idea to express massiveness with a facade

that also had to permit the lighting of the interior

space was not that easy. During our work we

simula-ted various proposal of density for the pattern facade

(studied with Grasshopper script on Rhino) and then

we processed the obtained proposal into this

simula-tion software.

Clearly from the simulation we discovered how the material

choice of the ceramic could reach the right lighting effect for

the interior space. As it’s seen in the upper picture, even the

back of the ceramic tile is lighted because of the reflectivity of

the material.

Then we discovered how the interior cirrculation between the

courtyard glass and the exterior facade was darker than the

outer parts. But it was still acceptable because of the use of this

kind of circulation spots.

Cameras keyplan

lux

266

0

213

160

107

51

lighting lx: 6/21 clear sky

19

A

leppo

C

ultural

C

enter

Aleppo Cultural Center

Lorenzo Maria De Vecchi

Nicolò Sciolti

Vittorio Vaghi

897579

897097

897169

TECHNOLOGY and DESIGN in BIM ENVIRONMENT

LEED SUSTAINABILITY CHECKLIST

LEED v4 for BD+C: New Construction and Major Renovation

Project Checklist

Project Name:

Aleppo Cultural Center

Date: 18/11/2019

Y ? N

Credit Integrative Process

1

9

4

0 Location and Transportation

16

11 0

0 Materials and Resources

13

Credit LEED for Neighborhood Development Location 16

Y Prereq Storage and Collection of Recyclables Required 1 Credit Sensitive Land Protection 1

Y Prereq Construction and Demolition Waste Management Planning Required

2 Credit High Priority Site 2

4 Credit Building Life-Cycle Impact Reduction 5 5 Credit Surrounding Density and Diverse Uses 5

2 Credit Building Product Disclosure and Optimization - Environmental Product

Declarations 2

2 Credit Access to Quality Transit 5

2 Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials 2

1 Credit Bicycle Facilities 1

1 Credit Building Product Disclosure and Optimization - Material Ingredients 2 1 Credit Reduced Parking Footprint 1

2 Credit Construction and Demolition Waste Management 2

1 Credit Green Vehicles 1

14 0

1 Indoor Environmental Quality

16

7

3

0 Sustainable Sites

10

Y Prereq Minimum Indoor Air Quality Performance Required

Y Prereq Construction Activity Pollution Prevention Required

Y Prereq Environmental Tobacco Smoke Control Required

1 Credit Site Assessment 1

2 Credit Enhanced Indoor Air Quality Strategies 2

2 Credit Site Development - Protect or Restore Habitat 2

2 Credit Low-Emitting Materials 3

1 Credit Open Space 1

1 Credit Construction Indoor Air Quality Management Plan 1

3 Credit Rainwater Management 3

2 Credit Indoor Air Quality Assessment 2

2 Credit Heat Island Reduction 2

1 Credit Thermal Comfort 1

1 Credit Light Pollution Reduction 1

2 Credit Interior Lighting 2

3 Credit Daylight 3

2

0

0 Water Efficiency

11

1 Credit Quality Views 1

Y Prereq Outdoor Water Use Reduction Required

1 Credit Acoustic Performance 1 Y Prereq Indoor Water Use Reduction Required

Y Prereq Building-Level Water Metering Required

5 0

0 Innovation

6

0 Credit Outdoor Water Use Reduction 2

5 Credit Innovation 5

1 Credit Indoor Water Use Reduction 6

Credit LEED Accredited Professional 1 0 Credit Cooling Tower Water Use 2

1 Credit Water Metering 1

1 0

0 Regional Priority

4

1 Credit Regional Priority: Specific Credit 1

19 0

0 Energy and Atmosphere

33

0 Credit Regional Priority: Specific Credit 1 Y Prereq Fundamental Commissioning and Verification Required

0 Credit Regional Priority: Specific Credit 1 Y Prereq Minimum Energy Performance Required

0 Credit Regional Priority: Specific Credit 1 Y Prereq Building-Level Energy Metering Required

Y Prereq Fundamental Refrigerant Management Required

70

7

1

TOTALS

Possible Points:

110

1 Credit Enhanced Commissioning 6

Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110 14 Credit Optimize Energy Performance 18

1 Credit Advanced Energy Metering 1

2 Credit Demand Response 2

0 Credit Renewable Energy Production 3 1 Credit Enhanced Refrigerant Management 1 0 Credit Green Power and Carbon Offsets 2

TOTAL ACHIEVABLE CREDITS = 68/110 CERTIFIED GOLD

WORKFLOW

Politecnico di Milano 2018/2019

School of Architecture Urban Planning Construction Engineering

MSc in Architecture - Building Architecture

Master Thesis

Supervisor: Prof. M. G. Folli

CONCEPTUAL DESIGN

FREE HAND SKETCHING

MAP ANALYSIS CONCEPTUAL MODELING EXPORTING TO REVIT CONTEXT MODELING BUILDING ANALYSIS FACADE MODELING

AND ANALYSIS PARAMETRIC DENSITY TRIAL

3D VIEWS

2D GRAPHIC

GRAPHIC PRODUCTION AND PRESENTATION DETAILING

Riferimenti

Documenti correlati

when u be10ngs to the space of the uniform1y continuous X =U.C.B.(R) 3 and the existence and uniqueness of the 10ca1 (in time) stria solution is proved.. In [lJ , mollifying

rate of change, during time, of the spati a l metric; .~ ., describes the rate of change, during time, of the spatial di recti ons. This facts

The quantification of quantumness is necessary to assess how much a physical system departs from a classical behaviour and thus gauge the quantum enhancement in opera- tional tasks

Carbazoles, prevalent as structural motifs in various synthetic materials and naturally occurring alkaloids, as is known, have many applications such as

sense that when a superlinear condition at infinity is assumed, then we have an unbounded sequence of solutions, while when we require a sublinear behaviour near zero we find

The idea that it’s virtuous to spend more of your time working was embodied by the gure of the yeoman farmer, a smallholder who owned his own land and understood hard work, in

La strada che abbiamo scelto per provare che il “Paradigma dell’Evolvibilità” può essere usato con successo è di mostrare come, due prodotti molto differenti,

For the area in front of the Madrasa al-Sultaniyya the AKTC designed a pedestrian area planted with palm trees and benches to create shade and cooling the area.. After the Civil