Mission-level performance verification approach for the Euclid space mission

Title

Vavrek, Roland D.; Laureijs, René J.; Lorenzo Alvarez, Jose; Amiaux, Jérôme; Mellier, Yannick; et al.

Authors 10.1117/12.2233015 DOI http://hdl.handle.net/20.500.12386/24912 Handle PROCEEDINGS OF SPIE Series 9911 Number

(2)

PROCEEDINGS OF SPIE

SPIEDigitalLibrary.org/conference-proceedings-of-spie

Mission-level performance

verification approach for the Euclid

space mission

Vavrek, Roland, Laureijs, René, Lorenzo Alvarez, Jose,

Amiaux, Jérôme, Mellier, Yannick, et al.

Roland D. Vavrek, René J. Laureijs, Jose Lorenzo Alvarez, Jérôme Amiaux,

Yannick Mellier, Ruyman Azzollini, Guillermo Buenadicha, Gonzalo Saavedra

Criado, Mark Cropper, Christophe Dabin, Anne Ealet, Bianca Garilli, Anna

Gregorio, Henk Hoekstra, Knud Jahnke, Martin Kilbinger, Tom Kitching, John

Hoar, Will Percival, Giuseppe D. Racca, Jean-Christophe Salvignol, Marc

Sauvage, Roberto Scaramella, Luis M. Gaspar Venancio, Yun Wang, Andrea

Zacchei, Stefanie Wachter, "Mission-level performance verification approach

for the Euclid space mission," Proc. SPIE 9911, Modeling, Systems

Engineering, and Project Management for Astronomy VI, 991105 (16 August

2016); doi: 10.1117/12.2233015

Event: SPIE Astronomical Telescopes + Instrumentation, 2016, Edinburgh,

United Kingdom

(3)

Mission-level performance verification approach for the Euclid space

mission

Roland D. Vavrek

*a

, René J. Laureijs

b

, Jose Lorenzo Alvarez

b

, Jérôme Amiaux

c

, Yannick Mellier

c,d

,

Ruyman Azzollini

k

, Guillermo Buenadicha

a

, Gonzalo Saavedra

Criado

b

, Mark Cropper

k

, Christophe

Dabin

p

, Anne Ealet

i

, Bianca Garilli

f

, Anna Gregorio

n,o

, Henk Hoekstra

l

, Knud Jahnke

j

, Martin

Kilbinger

c

, Tom Kitching

k

, John Hoar

a

, Will Percival

g

, Giuseppe D. Racca

b

, Jean-Christophe

Salvignol

b

, Marc Sauvage

c

, Roberto Scaramella

m

, Luis M. Gaspar Venancio

b

, Yun Wang

h

, Andrea

Zacchei

e

and Stefanie Wachter

j

aEuropean Space Agency / ESAC, Villanueva de la Cañada, E-28692 Madrid, Spain

bEuropean Space Agency / ESTEC, Keplerlaan 1, 2201 AZ Noordwijk, The Netherlands

cIRFU, Service d’Astrophysique, CEA Saclay, F-91191 Gif-sur-Yvette Cedex, France

dCNRS-UPMC, Institut d’Astrophysique de Paris, 98B Bd Arago, F-75014 Paris

eINAF-Osservatorio Astronomico di Trieste, via G.B. Tiepolo 11, 34131 Trieste, Italy

fINAF-IASF Milano, vis Bassini 15, I-20133 Milano, Italy

gInstitute of Cosmology and Gravitation, University of Portsmouth, Burnaby Road, Portsmouth PO1 3FX, UK

hIPAC, California Institute of Technology, 314-6, 1200 East California Blvd., Pasadena, CA 91125, USA

iCPPM de Marseille, 163 avenue de Luminy, 13288 Marseille Cedex 9, France

jMPIA, Königstuhl 17, D-69117 Heidelberg, Germany

kMullard Space Science Laboratory, Holmbury St. Mary, Dorking, Surrey, RH5 6NT, UK

lLeiden Observatory, Oortgebouw, 2333 CA Leiden, The Netherlands

mINAF-Osservatorio di Roma , via Frascati 33, I-00040 Monteporzio Catone, Italy

nINAF-Istituto Nazionale di Astrofisica, OAT, via A. Valerio 2, 34127 Trieste, Italy

oUniversity of Trieste, via A. Valerio 2, 34127 Trieste, Italy

pCNES, 16 Avenue Edouard Belin, 31401 Toulouse Cedex, France

ABSTRACT

ESA's Dark Energy Mission Euclid will map the 3D matter distribution in our Universe using two Dark Energy probes: Weak Lensing (WL) and Galaxy Clustering (GC). The extreme accuracy required for both probes can only be achieved by observing from space in order to limit all observational biases in the measurements of the tracer galaxies. Weak Lensing requires an extremely high precision measurement of galaxy shapes realised with the Visual Imager (VIS) as well as photometric redshift measurements using near-infrared photometry provided by the Near Infrared Spectrometer Photometer (NISP). Galaxy Clustering requires accurate redshifts (Δz/(z+1)<0.1%) of galaxies to be obtained by the NISP Spectrometer.

Performance requirements on spacecraft, telescope assembly, scientific instruments and the ground data-processing have been carefully budgeted to meet the demanding top level science requirements. As part of the mission development, the verification of scientific performances needs mission-level end-to-end analyses in which the Euclid systems are modeled from as-designed to final as-built flight configurations. We present the plan to carry out end-to-end analysis coordinated by the ESA project team with the collaboration of the Euclid Consortium. The plan includes the definition of key performance parameters and their process of verification, the input and output identification and the management of applicable mission configurations in the parameter database.

Keywords: Euclid, performance verification, parameter database, Mission Database

*Euclid Deputy Project Scientist, [email protected], phone +34 918131398, http://sci.esa.int/euclid

Modeling, Systems Engineering, and Project Management for Astronomy VII, edited by George Z. Angeli, Philippe Dierickx, Proc. of SPIE Vol. 9911, 991105

© 2016 SPIE · CCC code: 0277-786X/16/$18 · doi: 10.1117/12.2233015 Proc. of SPIE Vol. 9911 991105-1

Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020 Terms of Use: https://www.spiedigitallibrary.org/terms-of-use

(4)

1. INTRODUCTION

The primary objective of cosmological research in the coming decade is to understand the accelerated expansion of the Universe. For this purpose, the Euclid mission has been selected for implementation in 2012, it is the second medium-class mission (M2) of the ESA Cosmic Vision 2015 – 2025 program. The mission is designed to make the most accurate measurement of the expansion history and the growth rate of cosmic structures generated by the accelerated expansion of the Universe, allowing us to make decisive statements on the nature of dark energy. Euclid is a space-borne 1.2 m survey telescope, its science payload is equipped with two imaging and spectroscopic instruments operating in the visible (VIS) and near-infrared wavelength ranges (NISP). This instrumentation is capable to explore how the accelerated expansion manifests by measuring shapes and redshifts of galaxies over a large fraction of the sky. The satellite is scheduled for launch in 2020 by a Soyuz ST-2.1B rocket and transferred to the L2 Sun-Earth Lagrange point for a six-year mission that will cover at least 15000 square degrees of sky. Euclid will measure more than 1.5 billion galaxy shapes through imaging, and more than 25 million galaxy redshifts through slitless spectroscopy.

This paper is organized as follows: this introductory section summarizes the science case and the mission concept, describes the science payload and the sky survey design in brief. Section 2 describes the allocation of key performances at mission level. Section 3 summarizes the mission-level performance verification concept applied to the Mission Preliminary Design Review in 2015 and will be applied for the Science Performance Verification in 2017-2019. Section 4 describes the Euclid Mission Database (MDB), a centralized mission configuration management system. Finally Section 5 summarizes on the ongoing Euclid performance verification activities and outlook activities in the future. In the current “concordance cosmological model” cosmic structures of Universe grew hierarchically from gravitational instabilities to form galaxies, galaxy clusters and filaments, three quarters of its mass-energy density at our epoch is in the form of Dark Energy (DE), and approximately one fifth of Dark Matter (DM). While the remaining only five percent composes the source of all visible matter, no existing theories can explain the nature of dark energy and dark matter in framework of the standard cosmological model and the standard model of particle physics.

Euclid is designed to carry out a large area optical and near-infrared imaging survey and a massive spectroscopic survey in the wavelength range 1.1 − 2.0 micron. The mission is optimised for two cosmological probes: Weak Lensing (WL) and Galaxy Clustering (GC). These probes enables unprecedented statistical precision for Euclid, and provide a crucial cross-check of systematic effects, which become dominant at these levels of precision. Euclid aims at improving the dark energy Figure of Merit (defined by FoM = 1/(Δwp×Δwa), where wp and wa parametrize the dark energy equation of state). From the weak lensing and galaxy clustering information alone a FoM of ~430 can be derived, which is a factor ~20-40 higher than what is presently achievable by merging all known observations. The following key questions can then be addressed by Euclid:

• Nature of Dark Energy: Is dark energy simply a cosmological constant, or is it a field that evolves dynamically with the expansion of the Universe?

• Modified Gravity: Alternatively, is the apparent acceleration instead a manifestation of a breakdown of General Relativity on the largest scales, or a failure of the cosmological assumptions of homogeneity and isotropy? • Dark Matter: What is dark matter? What is the absolute neutrino mass scale and what is the number of

relativistic species in the Universe?

• Initial Conditions: What is the power spectrum of primordial density fluctuations, which seeded large-scale structure, and how deviations to Gaussian probability distribution in Euclid data can unveil inflation?

Euclid’s two primary dark energy probes, GC and WL, are complemented by a number of additional cosmological probes which further improve Euclid’s constraining power: cross correlation between the cosmic microwave background and the large scale structure; abundance and properties of galaxy clusters and strong lensing and possible luminosity distance through supernovae Ia.

Euclid will be one of the most powerful tools to test these new theories, one in which the systematics will be controlled to an unprecedented accuracy through the combination of technical capability and different cosmological approaches.

Proc. of SPIE Vol. 9911 991105-2 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(5)

The main task of the VIS instrument is to enable WL estimates, which require an exquisite image quality to perform accurate galaxy shape measurements. The gravitational potential aggregates ordinary and dark matter as the Universe expands. The complex self-similar interwoven structure of overdensities perturb the path of photons traveling through space from distant background galaxies to the observer. These background objects appear distorted - at small spatial scales comparable to the apparent size of a galaxy - the weak distortion accounts for a small but measurable change in their ellipticity. From the statistical averages of at least 30 galaxy shapes per square arcminute a sufficiently dense galaxy shear pattern can be obtained. When combined with the photometric redshift of the same objects the 3-dimensional mass distribution, corrected from the contamination by intrinsic galaxy alignment, can be reconstructed. This is how Euclid measures dark matter distribution. From the mass distribution as a function of redshift, the rate at which matter aggregated can be derived. This is directly related to the expansion rate of the Universe and the growth rate of structure in the Universe, which are attributed to dark energy and dark matter, so the characteristics of the dark energy can consequently also be constrained.

The VIS instrument focal plane array (FPA) consists 6×6 CCDs (4k×4k pixels each) with 0.101 arcsec pixel platescale, giving a field of view 0.55 deg2 with one wide visible band covering the broad the range ~550-900 nm. VIS is equipped with a shutter mechanism to close the optical path for read out and dark calibration, and a calibration unit for multi-colour flat-field measurements. The VIS channel measure the shapes of galaxies with about 0.16 arcsec (FWHM) system point- spread function excluding pixelisation. A detailed description of the VIS instrument can be found in Cropper et al [3] (these proceedings).

The clustering properties of galaxies with redshift is a sensitive alternative and complementary probe of the accelerated expansion of the Universe. The NISP instrument is optimised to characterize galaxy clustering by measuring the Hα (rest wavelength 656.3 nm) line redshift of more than 25 million emission line galaxies in the range 0.8<z<1.8. Redshifts are used to reconstruct the three-dimensional distribution of galaxies in the Universe, which can be quantified in terms of its power spectrum. The amplitude, shape and anisotropy of these statistics contain the crucial information on the expansion and structure growth histories of the Universe.

The NISP instrument contains an array of 4×4 HgCdTe NIR detectors (2k×2k pixels each) with 0.3 arcsec per pixel and 2.3 µm cut-off wavelength. NISP can be operated in either photometer mode or slitless spectrometer mode by means of a filter wheel and a separate grism wheel. In the slitless spectrometry mode, the light is dispersed by a grism in the wavelength range 0.92 to 1.85 µm with a constant Δλ at a spectral resolution λ/Δλ ˃ 380 for an object of 0.5 arcsec diameter. A detailed description of the NISP instrument can be found in Maciaszek et al. [4] (these proceedings).

To achieve the exquisite science objectives, Euclid must carry out a survey of over 15000 deg2 of the extragalactic sky.

This survey is complemented by at least 40 deg2 of deep fields and calibration observations regularly interleaved within

the main survey schedule. The nominal field observation sequence allows to reach VIS imaging of galaxy shapes down to AB magnitude 24.5 (10 σ, extended source), NISP photometry in the Y, J and H near-infrared bands (0.92 – 2.0 microns) reaching AB magnitude 24 (5σ, point source) corresponding to a photometric redshift accuracy of

σ(z)/(1+z)<0.05. Parallel to the VIS exposures, NISP will detect redshifts of at least 1700 galaxies/deg2 with a

completeness higher than 45% at a detection limit of 2×10-16 erg/s/cm2 (3.5σ) for a typical source of 0.5 arcsec in the

wavelength range 1250-1850 nm. The survey coverage avoids high background regions dominated by the diffuse zodiacal light and galactic background. The Reference Survey defines the actual observing baseline, it implements an efficient scheduling scheme fitting within 6 years of operations with minimum amount of scheduling overheads and survey gaps. A detailed description of the Euclid reference survey can be found in Amiaux et al. [9].

Besides studies in cosmology, Euclid will deliver an immense legacy science archive, with optical imaging at 0.2 arcsec spatial resolution to very faint limits (AB magnitude 24.5 10 σ), infrared imaging in three bands to similar limits and only slightly worse spatial resolution, and spectra and redshifts of nearly 100 million sources. A dataset of this size will have huge scientific impact in various fields of astrophysics.

The key features of Euclid are the amount of data that the mission will generate, the heavy processing that is needed to process science products, and the accuracy and quality control which are required at every step in the processing. The Euclid Science Ground Segment (SGS) is designed to process telemetry data, as well as external data from ground based photometry, to obtain the mission data products. The SGS is composed of a number of geographically distributed Science Data Centres (SDCs), in charge of science data processing, production of Level-1 (raw telemetry), Level-2 (calibrated data) and Level-3 (science-ready) science products, simulations, handling and cross-matching of external data from ground-based surveys, and in general all science-driven data processing. The ESA Science Operations Centre

Proc. of SPIE Vol. 9911 991105-3 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(6)

(SOC) main responsibility is Level-1 production and Quick Look Analysis (QLA). The science data processing can be decomposed in ten Processing Functions (PFs), each of which represents a self-contained processing unit in the pipeline. A given PF is under responsibility of an Organisation Unit (OU) which develops the algorithms in prototype code, performing numerical tests, and comparing the results against specifications. A detailed description science ground segment concept can be found in Pasian et al. [6].

All Euclid data will be publicly released in subsequent data releases after a relatively short proprietary period and will constitute for many years the ultimate survey database for astrophysics.

The overall scientific aims of Euclid have been recently summarized in [5], an overview of the mission design and performances are also available in this proceedings [2] and in the Euclid Red Book [1].

2. EUCLID MODELING AND KEY PERFORMANCE PARAMETERS

The Euclid mission top-level science objectives translate into stringent performance requirements allocated at the different elements of the mission architecture. The Mission Requirements Document (MRD) establishes the general set of performance requirements, while the Mission Budget Justification File provides a requirement-by-requirement description of the rationale and a full description of the derivation to lower levels.

The Euclid mission level performance requirements refer to observing capabilities, and can be grouped in the following categories:

• Image quality: requirements on the complete VIS and NISP observing chain Point Spread Function (PSF) characteristics. The precision with which the Euclid visible image sensors can measure the shapes of galaxies is of paramount importance to the success of the mission.

• Sensitivity (radiometric performance): photometric sensitivity achievable for the visible and near infrared channels, and specifies unresolved emission line detection flux limit for the spectrometric channel.

• Spectroscopic performance: slitless spectroscopy performance encompasses purity (proportion of accurate redshift determination) and completeness (ratio of successfully measured targets from the observable galaxy sample).

• Survey performance: survey area covered by the wide and deep surveys, and total time required to complete the coverage.

Each of these elements are explained in detail in the Red Book [1] and collected for Euclid’s three instrumental capabilities in the following sub-sections.

The collection and maintenance of the complete set of assumption and justifications for the requirements flow-down is the responsibility of the mission Systems Engineering function. A Model Based System Engineering (MBSE) approach has been implemented to trace requirements of the complex Euclid systems. For each requirement or group of related requirements, snapshots from the Euclid SysML Model are provided to visualize the traceability and dependency, an example is shown on Figure [1]. Further examples and a description of the Euclid MBSE approach is provided in the same proceedings in Alvarez et al. [10].

Proc. of SPIE Vol. 9911 991105-4 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(7)

Figure 1 VIS channel PSF FWHM requirements flow-down.

2.1 Visible imaging

The main role of the visible imaging is to measure galaxy shapes and hence, the shear induced by weak gravitational lensing as described in the introduction. The observational technique requires a small and stable point spread function, and the uniformity provided by wide field imaging using a stable platform in space. Note that the typical size of a Euclid galaxy is ~0.3 arcsec. In order to meet the top-level requirements for WL, the visible imaging must:

• Cover a large area of the sky (at least 15000 square degrees) in order to observe a sufficiently large sample of galaxies;

• Have sufficient sensitivity to allow a deep census of galaxies providing a surface density of 30 galaxies per square arcminute;

• Have a PSF which allow determination of shapes down to a fraction of an arcsec. The PSF must be well understood and predictable on any position of the FPA at any time.

The first two are driving the field of view of the detectors and the size of the telescope. The third requirement is the most critical one, and consists of two parts: not only must the Point Spread Function (PSF) be acceptable, but its characteristics must also be known very precisely at any point over the field of view and for any epoch of the observation.

The main requirements on the acceptability of the PSF are on its size expressed in terms of FWHM, its ellipticity (ε), as

well as a constraint on the extension of its wings in the secondary lobes (R2). Then, the knowledge of this PSF can be

expressed in terms of residuals of these quantities (as determined by a model) from their true values. In orbit, the technique adopted by Euclid relies on the availability of a number of relatively bright stars across the focal plane, which allows to calibrate the PSF at these points, and from which a model of the PSF at any position of the focal plane and at the time of the observation can be constrained.

2.2 Near-infrared imaging

The NISP photometric measurements completed with ground-based multiband measurements are used to estimate the photometric redshifts of the weak lensing galaxies. Since the main purpose is accurate photometry, the image quality requirements are expressed in terms of radii of encircled energy (EE50, EE80) of (<0.30, <0.62) arcsec, (<0.30, <0.63)

custom MRD-WL-002: VIS PSF FWHM <= 0.18''_OK

MRD-WL-002: VIS PSF FWHM <= 0.18'' SRD-PLM-04: VIS FPA to TA optical IF (from SRD: Telescope Requirements) SRD-PLM-24: VIS Telescope PSF FWHM < 0.155 arcsec over 700s

(from SRD: VIS Channel Image Quality)

R-VIS-P-003: VIS Instrument PSF FWHM <10.8um

(from PERD: Euclid VIS performance requirements)

SRD-PLM-22: VIS FPA flatness tolerance +/-60um

(from SRD: VIS Channel Optical Interface)

R-WL.2.1-003: VIS FWHM <= 0.18''

(from SciRD: Requirements from

Weak Lensing) SRD-POINT-03: Pointing requirements

derivation

(from SRD: Pointing Requirements)

MOCDA-WL-002: Average Density

(from MOCDA: Wide Survey)

MOCDA-WL-003a: small holes budget

(from MOCDA: Wide Survey)

«analysis» VIS IQ Analysis (from End to end verification)

«verify»

Proc. of SPIE Vol. 9911 991105-5 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(8)

arcsec and (<0.33, <0.70) arcsec at the centre of the Y, J and H bands respectively. This high image quality is required to meet the sensitivity requirements AB magnitude 24 (5σ point source) in all three bands. The Y, J, and H band passes are defined for Euclid and instrument and telescope optical design is such that the bands passes are stable and understood at any position of the FPA.

For both visible and infrared imaging, the PSF characteristics of the imaging modes is a convolution the following components: the optical system PSF (generated from the telescope and instrument optical design perturbed according to realistic manufacturing and element misalignment errors), the satellite’s pointing jitter, the instrument optics quality, and the detection element response. Extra non-convolutive contribution may also degrade the final PSF.

2.3 Near-infrared spectroscopy

The NIR spectroscopic channel is designed to carry out redshift measurements with σ(z)/(1+z)<0.001 in several redshift bins up to a redshift of 1.8. As described in the introduction, the redshift measurement relies mainly on the detection of the Hα emission line. For a given Hα line flux, the precision, accuracy and success rate of redshift determination depends on the intrinsic NISP instrumental parameters (PSF size, resolution, and instrumental background) and on the observing strategy adopted to mitigate the specific limitations of the slitless technique, in particular confusion of spectra, out-of-field straylight and the Zodiacal light levels. The completeness is defined as the number of galaxies for which a correct

redshift is measured at 50% confidence level, (Ncorrect) divided by total number of galaxies at the flux limit (Nmeas).

The performance verification has to demonstrate (i) that single redshifts are unbiased and measured with sufficient

precision in order to reach the needed flux limit of 2×10-16 erg/s/cm2 (3.5σ) and (ii) that the completeness and purity are

sufficient to get galaxy number densities per redshift bins that meet the scientific goal of at least 1700 galaxies/deg2. In

order to optimize the survey and the unit observing block, it is crucial the relative importance of contributing factors to purity and completeness are well characterized (in particular for signal-to-noise, stellar densities, and number of dispersion orientations parameters).

2.4 Survey performance

The survey is intending to repeat a pre-defined sequence of atomic observations over the most suitable extragalactic sky defined by the Wide and Deep survey requirements and associated calibration sequence. The primary requirement for Euclid is the 15000 square degrees area covered by the wide survey. The survey scheduling concept aims at tiling the survey area with the elementary observing pattern in the most efficient way. The total survey time is limited by 6 years.

3. PERFORMANCE VERIFICATION CONCEPT

Euclid requires a reliable and executable modelling approach to verify its science return at a few checkpoints where the actual system performance can be synthesized and applied for mission-level predictions.

3.1 Performance verification cycles

Euclid mission-level verification activities are distinguished in five components (performances, survey definition, mission profile, mission reliability and interface verification), each component has a specific verification cycle with assigned milestones. Scientific performances are re-evaluated at completion of the End-to-End (E2E) performance analysis cycles, of which four repetitions are foreseen between 2011 and 2020. The first cycle was started after the mission selection in 2012, and the last edition will start after the Mission Critical Design Review (MCDR) in 2018. The planned timeline of Euclid E2E verification cycles is shown on Figure [2].

Proc. of SPIE Vol. 9911 991105-6 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(9)

EzEPerformance. EzE Performance EzE Performance EzE Performance Mladnn 5alaa[bn

Starr

II, Alvid Analysis v. -Analysis v.a Analysis V.3 Analysis V.4 PLIO CI' c )ecember 2013 Mbßß

san vs ion an no.

___ I , ct gal fxf]M Vf Mid -2018 GS IF En 's9mon Ms Figure 2 End The Euclid m elements of requirements documents m performance operations, a verification is Figure 3 End In this sectio concluding th can actually b Finally, we o in the period before launch requirements supported by Collaboration bdd [Pa d-to-End perf mission scien the mission for the Euc mission constra requirements and verified t s shown on Fi d-to-End perf on we first su he second End be met with cu outline the vali d of 2017-201

h. The ambiti described in ESA, it requi n.

ackage] End to end v erific

«bloc

VIS Ch mo

«Test»

EPLM e2e test

«Test»

EPLM e2e test

«satisfy»

formance ver

nce objectives architecture. clid mission. aints and alloc s are valid d through the E igure [3]. formance ver ummarize mis d-to-End perf urrent best est idation approa 9. These two ious campaign n the introdu

ires a highly c

ation [E2E Perf Verification

«block,a NISP-P Analys ck,anal... annel PSF odelling «Test,analys NISP-P IQ Ana «satisfy rification plan s translate in The Mission It defines f cates high lev during the Eu E2E Perform rification acti sion performa formance veri timate sub-sys ach of the Sci SPVs are co ns aim to ver uction. SPVs collaborative n] «analysis» Image quality nal... P IQ sis «block,anal... NISP-S IQ Analysis «analysis,Test NISP-S IQ Analy sis» alysis «satisfy» y» n nto stringent p n Requiremen functional and vel interface re uclid develop ance Verifica

ivity tree indi

ances from M fication cycle stem performa ience Perform onsidered the rify the Eucli are organized effort with th «block,anal... VIS IQ Analysis «analysis» VIS IQ Analysisysis «Satisfy» performance nts Document d performanc equirements a pment phase, ation cycles. icating key p Mission Prelim e in 2015, it d ances. mance Validati most complet id mission is d and implem he involvemen «analysis,b... VIS radiometric calculation «analysis» VIS Radiometric Calculation «Satisfy» requirements t (MRD) esta ce requiremen among the Eu commissioni The activity erformances minary Design demonstrates t ion (SPV) cam te science ver compliant wi mented by th nt of almost al «analysis» Radiometric performance «analysis,block» NISP-P radiometric performance constraints snr_calc : SNR «analysis» NISP-P radiometric performance «satisfy» allocated at ablishes the g nts to the E uclid segments ing and scien

tree of E2E of observing n Review. Th the Level-2 sc mpaigns #2 an rification effo ith its top-lev he Euclid Co ll constituents «analysis,block» NISP-S radiometric calculation «analysis» NISP-S radiometric calculation «satisfy» the differen general set of Euclid system s. Key science ntific mission E performance g capabilities he MPDR was cientific goals nd #3 foreseen orts for Euclid vel cosmology onsortium and s of the Euclid t f m, e n e s s n d y d d

Proc. of SPIE Vol. 9911 991105-7 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(10)

1: Mission en

straff al

:Calculate Zodiacal level d :Calculate Strayllgh oacRgrouno fii iht sis coverage Survey feasi study on. :NS 10 min I _y. 4ralysiz :NS Radiometric Calculation :NISP.P radiomen performance :NISP -S radiomen calculation :Spectroscopic Performance

Ee

4: Key perf 5: Sped to -end =_y imaging ormances r radiometric Formances troscopic end-performance d-to-end nalysis i ESA nri ul a. Calculate ieleewpe 1771 U W W YJidaY IMI eleiWee

I

Mission Straylio rformance analy T 3.2 Perform The performa architecture r system, analy assessment h performance scientific obj survey defini this proceedin A central ele studies and s management Requirements modeling res synchronized EC-led SPV c End-to-end p Figure 4 MP mance verifica ance verificati relevant for th ysis performe has been perfo

verification o ectives as spe ition and its c ngs in the mis ement support software deve of parameters s depending s idual error), w d to performan campaigns. erformance ve PDR perform ation at the M ions have been he assessment ed for all elem

ormed in the f bjectives of th ecified in the M compatibility w ssion status ov ting performa elopment app s in Euclid Mi solely on the were not anal nce verificatio erification of o ance analysis Mission PDR n carried out a t of the exqui ments where u framework of he MPDR are Mission Requ with the space verview paper ance verificati ply consistent ission Databas data process lyzed in this c on cycles. The observing cap s flow diagram at mission lev site key perfo updated infor f the Mission : (i) confirm t uirements Doc ecraft design. by Racca et a ion activities assumptions se (MDB) is d ing pipeline p cycle because ese elements pabilities: m el by combini ormances. To rmation is ava PDR and com that the missio cument, and (i A detailed d al. [2].

is the param for all elem described in de

performance ( e the developm

will be analy

ing all individ evaluate the ailable from a

mpleted in m on performanc ii) confirm the description of meter repositor ments of the m etail in Sectio (for instance ment of data ysed after the

dual elements current perfor as-designed sy mid-2015. The ce are adequat e adequacy of MPDR result ry. It is impe mission. The n 4. non-convolut processing fu SGS DR, as of the mission rmance of the ynthesis. This main science te to fulfill the f the reference ts are given in erative that al configuration tive bias, PSF unctions is no well as in the n e s e e e n l n F t e

Proc. of SPIE Vol. 9911 991105-8 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(11)

1. The mission straylight end-to-end analysis provides NDI (Normalised Detection Irradiance) models from an assessment of the straylight performance for both instruments due only to particulate contamination including the telescope plus SVM and instruments VIS and NISP-P optical elements. This assessment compiles the results of simulations performed at ESA and the results presented by ADS and NISP teams at their respective PDRs. 2. Significant attention and effort at system level has been dedicated to the mission straylight performance analysis

which provides the estimated total background from straylight and zodiacal light. It provides the reference evaluations of straylight levels covering the in-field and out-field contributions based on the NDI straylight modelling for the spacecraft (telescope plus SVM) and the instruments. Calculations apply stellar surface densities and magnitude distributions combined from 2MASS observations [8] and from the Besancon model of the Milky Way [7] at the faint end required for Euclid sensitivities. Stellar fluxes are integrated at 1 square degree resolution over the reference survey area providing a model of the external illumination of the telescope. 3. Imaging performance analysis calculation is based on a Monte Carlo analysis combining realizations of the

optical system at several points in the Field of View (FoV), 100 realizations of pointing jitter series over a nominal exposure, and the best fit CCD PSF determined by Bayesian analysis.

4. Radiometric analysis takes the input from the background radiation determination process of point [2.] above. Illumination is modeled by the input radiance of a reference object combined with background levels. Signal at the detector level is determined by the systems transmission and detection elements quantum efficiency, as well as by the selected radiometric aperture for signal recovery. Analytic calculations combine the derived signal level with detection chain noise contribution and provide SNR maps over the whole reference survey sky coverage.

5. Specific simulations have been carried out for spectroscopy, because of the confusion due to overlapping spectra and the background produced by unresolved faint sources, slitless spectroscopy carries an intrinsic risk of failing to measure galaxy redshifts. The purity and completeness of the baseline redshift recovery method can only be tested through extensive simulations, which have to be as realistic and representative as possible, but also has to be feasible by restricting the sky coverage of computationally very demanding pixel simulations. For the MPDR, 9 pointings on the sky with varying levels of background were selected for performance evaluation representing scenarios of extreme, mean or more frequent skies NISP will observe. The analysis was performed incrementally by including first the effects of straylight, then persistence and finally cosmic rays. The simulation pipeline applied a realistic input catalogue of sources with spectro-photometric information, it created 2D dispersed images, and finally applied spectral extraction and analysis algorithms which produced redshifts. Results of the Mission PDR analysis show that the purity with the current spectra recovery algorithms is limited strongly by the background, in particular by the out-of-field straylight and the zodiacal light levels. It is expected that improvements on data processing, both in terms of background correction and spectral extraction will move performance close to compliance. The next iteration in the Euclid Wide Survey that jointly optimizes the performance of WL and GC should bring the performance to compliance. This analysis highlights the importance on the straylight control both in the design and in the cleanliness and contamination.

Required and estimated Euclid key performances at this analysis cycle are summarized in Table [1].

Technical Performance Measure Requirement CBE

Image Quality

VIS Channel

FWHM (@ 800nm) 180 mas 163 mas

Ellipticity 15.0% 5.9%

R2 (@ 800 nm) 0.0576 0.0530

ellipticity stability σ(εi) 2.00E-04 2.00E-04

R2 stability σ(R2)/<R2> 1.00E-03 1.00E-03

Plate scale 0.10 " 0.10 "

Out-of-band avg red side 1.00E-03 1.13E-05

Out-of-band avg blue side 1.00E-03 2.12E-04

Slope red side 35 nm 15 nm

Slope blue side 25 nm 8 nm

NISP Channel rEE50 (@1486nm) 400 mas 217 mas

As shown on the MPDR peerformance annalysis flow diagram (Figurre [4]) studies are grouped iin five threadss:

Proc. of SPIE Vol. 9911 991105-9 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(12)

&Wm

UI'`

1

Ip

f

IN

attic Pole North

PRO

Sensit VIS SN NISP-S NISP- NISP-S Purity Comp Survey Wide Survey Table 1 Eucl Survey perfor The Referenc mission. The 6 years of implementati telemetry, life Figure 5 Re colours, whe In summary, margins on k the purity re however it re MPDR perfor the difficulty to the maturi margin at MP tivity

NR (for mAB = 24.5 sou S SNR (@ 1.6um for 2x P SNR (for mAB = 24 s S Performance y pleteness y Survey Coverage y length [years] lid system pe rmance verific ce Survey (RS 15000 deg2 s operations (< on (see Figu etime, and ins

eference surv ere colour cod

the assessm key performan equirement is einforces the f rmance result or complexit ity of the MP PDR for the p rEE Plat urces)

xe-16 erg cm-2 s-1 sour

ources) Y-b J-ba H-b rformance su cation: S) for MPDR d sky coverage i <5.5 years f ure [5]) respe strument const vey coverage ding refers to ment of missio nces of image expected to focus on stray s are shown in ty of the requi PDR performa particular para E80 (@1486nm) te scale rce) band and band ummary at M demonstrates including the for nominal ects all bound

traints). e in Mollwei o scheduling o on performan quality and ra be recovered ylight (and cle n Figure [6]. D irement comp ance estimate. ameter. As suc

Mission PDR

that the space deep field and 4400 second dary condition ide projectio order. nce based on adiometric lev d by advance eanliness) con Difficulty on t pliance verific . The radius o ch, the red cir

700 mas 0.30 " 10 3.5 5 5 5 80% 45% 15,000 deg2 5.5 e segment mee d calibration o ds common b ns of the sys n. Schedulin the as-design vels. The marg ments in cap ntrol already in

the y-axis rep cation process of the circles rcle represents

ets the primary observations c block duratio stem (most im ng units (pat ned system c ginal spectros pabilities of d n place for the presents a relat s, while the y-is a third par s a 'negative r 583 mas 0.30 " 17.1 5.04 5.78 6.69 5.35 72% 52% 15,000 5.4 y science goal can be obtaine on). The sur

mportant poin tches) are in configuration scopic non-com data processin e mission. A tive number p -axis relative rameter, it is radius' (negati l of the Euclid ed in less than rvey schedule nting, orbital ndicated with shows robus mpliance with ng algorithms cartoon of the proportional to number refers related to the ive margin) in d n e l, h t h , e o s e n

Technical Performance Measure Requirement CBE

Proc. of SPIE Vol. 9911 991105-10 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(13)

10 8 > ... 6 4 2 Purity( -11.11 %) Completeness (13.46 %)

®

SNR H-band (6.54%( O iiSNR GR-band (28.13%)

0

R2(8.68%) V IS S NR (41.52%) (7SNRJ-band(25.26%)

®

SNR Y-band (13.49%) E (154.67%) FWHM (10.43%) 2 4 6 8 10 Maturity of estimate

case of the spectral purity requirement. The upper-left corner of high difficulty and low maturity indicate requirements which require the most attention in upcoming science verification cycles. These requirements (purity, completeness and spectroscopy SNR) are related to the galaxy clustering probe. With subsequent iteration of E2E performance verification cycles the maturity of estimate will increase for all key performances.

Figure 6 Summary of MPDR key performances on difficulty vs. maturity of estimate diagram

3.3 Science Performance Verification campaigns

The successful MPDR is a major achievement for Euclid, however, a need for extension of its objectives and of its methodology has been proposed by the Consortium. The concept of the EC-led Science Performance Verification (SPV) campaigns #2 and #3 scheduled in the period of 2017-2019 is outlined in this section. The validation approach of the SPVs requires a very ambitious collaborative effort between the SGS, the Instrument Development Teams, ESA, Industry and the Science Working groups, the outcome is certainly the most reassuring verification that the Euclid mission will meet of its goals originally set up by the scientific community.

The End-to-End performance verification concluded by the MPDR was an ESA Project milestone to evaluate the current performance of the mission. Now that design parameters becomes available and some of the components are being built, a revised and more complete snapshot of mission performances are desirable to obtain. The EC interest is also focused on the verification of top-level science requirements which requires a complete different methodology of simulations and modeling. The two main objectives of the SPV are set up:

1. Verify mission-level performance requirements including mission elements of: joint hardware (instrument and satellite), operations (survey and calibrations) and data processing (SGS pipeline prototype).

2. Verify end-to-end science performance based on the current reference space segment, ground segment and ground data. Verify compliance with top-level (Level-0 and Level-1) science requirements, estimate the Weak Lensing and Galaxy Clustering joint constraining power assuming a reference cosmology.

These two approaches can lead to parallel implementations with different levels of integration in the Euclid infrastructure. It is, however, foreseen the two activities are highly inter-related as described below in a possible scenario currently being adopted.

The first objective is within the ESA verification scope, and to a large extent is in overlap with the objectives of the ESA-led End-to-End science performance verification cycles described in Section 3.1. Although, these are programmatically independent activities, the two campaigns also do overlap in time. One shall consider these are complementary efforts aiming to verify mission-level key performances with different toolsets. Identical boundary

Proc. of SPIE Vol. 9911 991105-11 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(14)

conditions and parameters will be applied from the same baseline Mission Configuration, therefore the starting point of verifications is considered identical.

The first objective can be achieved by pixel simulations over a large (~300 square degrees) area on the sky. This simulation effort can be implemented through the following procedure:

• Capture the Euclid baseline Mission Configuration in the Mission Database (See Section 4) including current best estimate sub-system performances obtained at CDR (Critical Design Review) level.

• Execute reference cosmology simulation that will be used for both GC and WL probes, create a joint GC and WL all-sky input catalogue (galaxy mockup) with a realistic Universe.

• Use the OU-SIM Processing Function (simulator PF) to generate simulated survey Level 0 data (raw pixel data) for 300 square degrees area on the sky (including VIS, NISP, calibration data plus ground data). These simulations shall be done for a range of scenarios which are defined by a number of simulation configuration parameters:

Cover simulation parameter space what effect radiometric and spectroscopy performance (zodiacal light levels, straylight, extinction, ghosts, PSF and detector effects). These simulated images feed the SGS pipeline in order to estimate the performance of the data processing for variable conditions of background, extinction and star densities. The results of this exercise are directly applicable to mission level key performance verification. • Use as much of the ground segment pipeline codes to process data and generate data products on which science

analysis can be performed. In case a task in a PF does reach the necessary maturity, or the processing can be simplified by simulating residual effects then apply a data processing shortcut. Again, on the processing side a choice of parameters can be set:

Cover data processing parameter space (background subtraction, detector effect correction etc.) and evaluate SNR for point source and galaxies, evaluate spectroscopy processing chain impact on completeness and purity. are applicable to mission level key performance verification.

• Feed the Science Working Group with the measured catalogue and with Level-3 data.

• Establish the catalogue-to-catalogue Euclid transfer function representative of the current estimated Euclid performance and applies to the parameter space covered by the choice of scenarios with all bypasses clearly defined.

The second objective can be achieved if circumventing the computationally very intensive pixel simulations:

• Go from catalogue to catalogue by by-passing applying the Euclid transfer function applicable to the covered parameter space and baseline Mission Configuration

• Feed the science Working Group with the resulting joint catalogue for WL and GC for a reference cosmological model with correct clustering, magnitude, shape parameter, size, redshift, spectrum; all affected by representative post-calibration residuals.

• The SWG establish science performance of Euclid in the current baseline Mission Configuration.

This process is outlined in the chart shown in Figure [7]. The concept can be continuously verified by comparing the output catalogue of pixel simulations with the output catalogue obtained from the bypass for the same set of galaxies. There are a number of open issues currently being investigated, like what is the most suitable way to calibrate analytical by-pass for shape measurements, photometric or spectroscopic redshifts from first evaluations of the respective Processing Functions. Also need to define clearly the content of pixel simulations in terms of the choice of sky coverage and the precise choice of parameters applied for the scenarios.

Proc. of SPIE Vol. 9911 991105-12 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(15)

"True" catalogue

w parameters: cal light level' ction levels light levels it densities :tor effects... is

>ply Euclid transf

1,p2,p3,...,pN) to Reference Sur Establish Euclid t Database: on configuration Sk selec pike J-51N ixcl inul,+ Parameters depend on (a,b) sky position Instrument and optical parameter er function on the catalogu( vey coverage transfer function :y positions ted for image !I simulations tions ocessing shortcu Pixel si in ([a,6], K [MOW e

newt

i TF([a,b], p1, p2, Level 0 data OU-SIR OU-SPE Data processini it configurations Pipeline ci Backgr Detect, imulation c 31, p2, p3, ..., pN , P3, ..., PN) g pipeline

TT

L onfigurations: ound subtraction or effect correction.

onfiguratio

I) parameter spar z ce 20,000 legrees )gue Measured catalogue

/\

L

Measured catalogue

II

i

0--Simulato Zodia Extinc Stray! Stella Detec Ghosi PSF By -pass: ap TF([a,b], pl applicable 1 OU-S Mission baseline missi or Figure 7 Scie The SPV cyc system flight hardware dat performing ca Besides the p activities is t share the sam weighting sch very complex area, and if ne

Numerous te contribute in ence Perform cle #2 (June 20 t model (FM) ta. Processing andidate algor parameter ba the release of me wide surve heme. The res x spherical ge

ecessary, the R

ams and hund significant wa mance Verific 017) baseline ) information g Functions a rithms shall b seline and da f optimized Re ey area, theref sulting survey ometry of the RS will be

re-4. SYSTE

dreds of indiv ays to the defi

ation model e relies on the will be avail apply evolvin e available. ata processing eference Surv fore an optimi y area and cov e survey perim -optimised in t

EM CONFI

viduals from finition and de sub-system C lable followe ng versions o g algorithm p vey (RS). The ized coverage verage map h meter. Ultimate terms of cove

IGURATIO

industrial con evelopment of CDR informat d by PLM E of prototype prototype ava e optimization strategy has t as to be creat ely, the SPV # erage for SPV

ON MANA

ntractors, from f the Euclid sy

ion, while for nd-to-End tes code, for cyc ailability, a ne n considers th to satisfy both ted, which is n #2 analysis sh #3.

AGEMENT

m the Euclid C ystems. It is of r cycle #3 (Ap st results and cle #3 a sele ecessary prec hat the WL an h probes with not a trivial ta hall confirm o

T

Consortium a f critical impo pril 2019) sub-AOCS fligh ection of best ursor of SPV nd GC probes an applicable ask due to the optimal survey

and from ESA ortance that al -t t V s e e y A l teams designing hardware and software sub-systems make identical assumptions on satellite, instrument, mission and natural parameters and apply the most up to date version of them from a central resource.

Proc. of SPIE Vol. 9911 991105-13 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(16)

In the context of Science Performance Verification, the integration of a unique and controlled snapshot of the mission configuration in both the simulation and data processing software significantly minimize the risk that parameters from a reference configuration may be inadvertently altered. A central repository can guarantee adherence to a reference mission configuration. A large part of the system model applicable to end-to-end pixel simulations will be self-contained within a parameter database, therefore the database content management plays an active role in the science verification process by providing key elements for the simulation and data processing pipeline.

The Euclid Consortium and ESA adopted the highly successful Gaia Parameter Database (GPDB) concept [11] and set out an approach to evolve its design supporting the Euclid mission architecture and the massive data exchange foreseen in the future between the Euclid Mission Database (MDB) and the Euclid Science Ground Segment.

4.1 System parameters configuration control and distribution system: the Euclid Mission Database (MDB) If database client software and users can share the same set of parameters then hard-coding of constants, tables, etc. or inventing numbers from the widespread Euclid documentation is error prone and avoidable. The Euclid Mission Database (MDB) is a response to this problem, the MDB provides a single reference project-wide repository for the Euclid Mission System, it disseminates at any time the official representation of the system consistent with the reference models of each sub-system (for instance, CCD charge transfer inefficiency (CTI) as required specifications, or later flight CCD CTI model characterized in laboratory tests). The MDB provides a centralized version control and distribution system of parameters required by the SGS software, ESA Project, the Euclid Consortium members and Industry contractors. It contains spacecraft and payload parameters, mathematical, physical and astronomical constants and parameters, as well as derived parameters required for the simulation, data processing and calibration processes of the SGS.

MDB follows a hierarchical system engineering top-down decomposition of the satellite and its payload into logical units such as Space Segment, Ground Segment, Launch Segment, Survey, Environment and External Data as shown in an example in Figure [8]. Each of these mission-level components can be followed by additional sub-levels what capture the parameters on which the system is designed and going to be verified. For instance, the Space Segment is decomposed into Instruments, PLM, and SVM, then Instruments are further divided between VIS and NISP. At the level of NISP and VIS the database follows a flat structure in order to avoid multiplication of common parameters (for instance, the number of pixels along the edge of CCDs is identical to all detectors of VIS). The MDB structure implies that parameters are stored exclusively at the lowest level of the hierarchy allowing an easy mapping and location of parameter groups. This becomes a very useful feature when client software needs to locate a given parameter.

Parameter names are designed such that a database user shall be able to alter between database trunks applicable to different mission configurations in a transparent way, without the need to change the reference to individual parameter names.

A Parameter is an abstraction of a configurable item in the database what consists of meta data and a single dataset what

can be a text table, fits file, image, binary file etc. A parameter could be a fundamental data item, and derived data; and both of them can be of scalar type or multi-dimensional (such as filter transmission curves as a function of wavelength, or wavefront error maps in the focal plane). Derived parameters can be created by Transfer Functions (TFs), which allow to process some input MDB parameters by a model and produce the output derived parameter. The resulting derived parameters are mandatory to be used by different SGS processing functions. The use of the transfer function ensures consistency in the interpretation of the MDB parameter sets (for instance, the VIS model of non-linearity consists of four parameters and a complex analytic function to derive the output signal, the transfer function implements the analytic function with the given four parameters of the MDB). Transfer functions are stored under the MDB configuration control and accessible by processing functions. Standards about reference systems and related conventions and notations are being collected in order to ensure that parameters can be unambiguously interpreted in the right units, coordinates, angles etc. Some flexibility at the definition of CBE parameters allows cases in which the disseminated value reflects merely a choice rather than an actual measurement or simulated value. These “dummy parameters” are necessary to

provide a commplete set of parameters required for thhe proper exeecution of SGGS processing functions. Duummies neverr

obtain validatted status, andd as the systemm evolves theyy are replacedd with CBE orr as built valuees.

Proc. of SPIE Vol. 9911 991105-14 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(17)

Collapse all Expan n.., , xi. v.... -0Environment - External Data -0GroundSegm, - LaunchSegmi -CISpaceSegmer -IgInstrumei -UNISP NNI en,NISP-NISPAsRequired xml %table rx.table rx.table rx.table ISpaceSegmer (Description : ontioarci proc pixels. Source : Inpul Release : 0.1 SpaceSegmer Description Source : Input KeleaSe : U.1 SpaceSegmer Description : plane assemb Source : Input Release : 0.1 ISoaceSeemer Description : assembly. 1Source : Inpui : 0.1 SpaceSegmer Description : assembly. 1Source : Inpui : 0.1 1SpaceSegmer 1Description : 1Source : Inpui : 0.1 Li nt.Instrument.N ISP.NISPAsRequ This is EOL total exposure noise

.eSSing) m NISF' JpeCtrOSCOpIC m

It by J.A. Non validated. for MDB

nt.Instrument.N ISP.NISPAsReq u Dark current. It by J.A. Non validated. for MDB

nt.Instrument.N ISP.NISPAsRequ This is the total number of NIR c )ly.

It by J.A. Non validated. for MDB

nt.I nstru ment. N ISP.NISPAsRea u This is the number of NIR Detec

It by J.A. Non validated. for MDB

nt.Instrument.N ISP.NISPAsRequ This is the number of NIR Detec

It by J.A. Non validated. for MDB

nt.Instrument.NISRNISPAsRequ This is the average physical size It by J.A. Non validated. for MDB

iired.NISPS95DetectorNoise 13 (detector plus detection chain p

IOW MatSnail De MetTOr OT

1 testing. iired.NISPDarkNoise 10.07 e/ test ng. iired.NISPDetectorNumber 16 detector integrated into the NISF Itesting. iired.NISPDetectorRow 2.001. dSIN 01.1, uwnicn E UO JOY U1111110,101.381.8ad,,,,,J, .2u4se, Id dsiN ay, Mal e UO .2uusa, Do, au, uo simod Jopa,ap ay, Jo on,Luaz,siaxwa2eianyds..paqi t the N SH /sip, P focal lane al plane in 118 um .al plane. id all 3 lent lent nt nt IISPAsDesigned IISPAsRequired alEUC-MDB-SpaceSegment-Instrume NISPYExposureTime NISRIExposureTime NISPHExposureTime NISPGRExposureTime NISPPMeanDetectorNoise NISPSMeanDetectorNoise NISPP95DetectorNoise NISPS95DetectorNoise - NISPDetectorNumber - NISPDetectorRow - NISPDetectorColumn - NISPAveragePixelSizemicron -SINISPHTransmissionMinMax I- NISPHTransmissionMinMax.ti -SINISPJTransmissionMinMax L NISPJTransmissionMinMax.ta -SINISPGRTransmissionMinMax NISPGRTransmissionMinMax. -CINISPGRATransmissionMinMax LNISPGRATransmissionMinMa -SINISPGRBTransmissionMinMax LNISPGRBTransmissionMinMa -SINISPGRCTransmissionMinMax LNISPGRCTransmissionMinMa - NISPLambdaMin - NISPLambdaMax Figure 8 The payload unit Spacecraft an performance isolate param into the MDB be “As Built” milestones, o Verification. Each mission is continuous bound to cha given develop MDB is in fa repository wi The MDB is Parameter bro for offline us parameter (b Consortium. e Euclid MD ts (left), and s nd instrument advances. Th meter sets. The

B. It is followe ”. Each of th or obtained fro n configuration sly updated un ange in order t pment period act a passive d ith no automat accessible th owse capabili e, facilitates d oth meta dat f B online bro some NISP pa t parameters he MDB prov e first mission ed by “As Des hese database om unit-tests, n may have a ntil parameters to facilitate a of the SGS. data transfer co

tic data transfe hrough two di

ities are only database acces ta and param owser interfac arameters wi change with vides paramet n configuration signed”, and “ instances adh sub-system l number of da s applicable to stable config omponent serv fer from data p

istinct interfac foreseen thro ss from softwa

eter value). T

ce shows par ithin the “As

time as desig ter branches n is “As Requi “Current Best here to differ evel or ILT o tabase version o flight-hardw guration for al ving a numbe processing pip ces: (1) a we ough this

web-are clients. Bo The MDB arc rt of the hiera Required” m gn evolves, o called Missio ired” what is Estimate” con rent representa

or IST test cam ns, for instanc ware are not av ll applications er of SGS proc peline and othe b-based interf -interface mai oth interfaces chitecture is archical deco mission configu or as the kno on Configurat a translation o nfigurations. T ation of the s mpaigns, or d ce, the current vailable. In pra s and activitie cessing functi er systems as face accessibl intained at ES provide acces designed and omposition of uration. owledge of as tions (MCs) w of sub-system The final conf

system, collec during in-orbit best estimate actice, parame es relying on t ions, it remain shown on Fig le from an on SAC; (2) and ss to all availa d developed b f satellite and s built system what serve to m requirements figuration wil cted at design t Performance configuration eter values are the MDB in a ns a read-only gure [9]. nline browser API interface able fields of a by the Euclid d m o s l n e n e a y r. e a d

Proc. of SPIE Vol. 9911 991105-15 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(18)

Science Ground Segmenit Euclid Archive Systems ESA Mission Cent TM fil I ESA Science Cent I Level 1, Qu SGS data proces and syst 4, HLevel 2, L Science Worki Operations :re les Dperations :re J lick Look sing pipeline ing Groups terns _evel 3

r

Insi s trument Operati Team

II

'I Lar, riu.IcUL Industry Figure 9 A s by M. Sauva 4.2 The Mis A careful con possess a com in the MDB o flown to the M The MDB ma parameters. A configuration distributing u The MDB is configurable The MDB CC configuration parameter cha database vers content. The parameter) fo description o Database, thi Redmine) wh handle user justification f chematic dia age presentati ssion Databas ntrol of inform mmon underst on due time. C MDB. anagement pl Activities req n control proce unintentionally s managed b items of the d CB is compos n control and ange request i sion shall be CCB collects or traceability r source field s may happen here MDB use accounts, iss files. The sche

agram of the M ion “The Euc

se content ma mation flow be tanding of par Content mana an promotes a quired to crea ess to ensure y altered conte y a Configur database. ed of member validation of is accepted fo released. Sy s parameter ju y of paramete ds. The CCB a n through a fa

ers and the CC sue categorie ematic CCB p MDB interfa clid Ground S anagement pr etween parame rameter values agement must a structured s ate and chang

the operationa ent shall be m ration Contro rs of the Eucli f parameters or implementa ystem enginee ustification fi er values back assesses and a st track CCB CB can monito es, status and

rocess is show

aces with the Segment”, Li rocess eter providers s, and paramet also ensure th equence of da ge content of al database co minimized. ol Board (CC id Mission Sy deployed in ation in the de ers monitor if iles (such as t k to their ori approves delt and results a or the entire l d priorities, wn on Figure [ Euclid Scienc isbon Consor s and paramete ter required fo he currently b ata manageme f the Euclid M ontains only a CB) what app stem Enginee the operation evelopment da f parameter u test reports w igin. These so a changes to new sub-vers life cycle of d database ver [10]. ce Ground Se rtium Meeting er users is cru or developmen best knowledg ent activities t Mission Data approved and v plies a contin ring Working nal database. atabase and w update is requ which describe ources are ref the database ion. An issue atabase chang rsion assignm egment (base g 2016) ucial to ensure nt are being m ge of the syste through a life abase are def validated item nuous supervi g Group. Its m

The CCB de when a validate

uired and pro e the derivati ferenced in th

released in th tracking syst

ge requests. T ments and sto

ed on a figure

that all actors made available em is properly e cycle of data fined within a ms. The risk of ision over al main duty is the

ecides when a ed operationa ovide updated on of a given he parameters he Operationa em is used (in he system can ore parameter e s e y a a f l e a l d n s l n n r

Proc. of SPIE Vol. 9911 991105-16 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(19)

se 1

-se 2

se 3

ra meters required for SGS Pr systems in the next MDB r

Pal (s

pdate change

in Retlm rvine y

ter - ticket owner

^etto 'ble Assign prepari emeg complete request procks

II-Analyze 41. CCB: Monitor statu! approved tickets, m MDB release schedi r/ m Prepare MDB rel, changes approve version into the o

MOB

meter Justification source, description) 111

ocessing Functions and

eiease 'es/ ssrne ted rt MDB CCB MDB Approve Archive change request Runautomats tliagnosHCte! Procedure

Actions in MOB's client application

MD

Format and Ingest approved parameter into development

4unumoa ,iya! ',MN 1aalay area,¿ 41 K Pa N Ia,P4YlA sal

Actions in issue tracking system )B Configuration Contre I D9 Development DB r. Validate N osetickehin ReAine Figure 10 Th The MDB re system design called Scient assembled in (CDR) are bo 2018. Based performance 2018. The Euclid s high spatial r 1.5 billion ga The end-to-e performances A mission lev advancement programmatic he Euclid MD elease cycle i n and develop ific Challenge to a pipeline oth expected to on updates fr evaluation ac cience payloa resolution ima alaxies and a ti end science s are re-evalua vel Preliminar t and the miss c constraints. DB configurat s synchronize pment milesto es (SCs). Scie and integrated o be conclude from these sub ctivities for th

ad together w ages, photome ight control of performance ated with the e

ry Design Re sion performa tion control p ed to SGS de ones. Subsequ entific Challe d in the SGS ed before the e b-system leve he SPV #2 as

5. C

ith the Euclid etric measurem f systematic b

verification evolving estim

view (MPDR ance were ass

process evelopment cy uent MDB re enges probe th processing in end of 2016. T el CDRs, the well as activi

CONCLUSI

d optical syste ments and slit biases, will pro program is mate of sub-sy R) was success sessed and con

ycles, End-to eleases are for

he correct fun nfrastructure. The spacecraft MDB will pr ities at missio

IONS

em and survey tless spectra o ovide tight con repeated in ystem perform sfully held in nsidered fulfi -end simulati reseen for SG nctioning of P The instrumen t CDR is now rovide a stabl on CDR level y and calibrat of most of the nstraints on co four cycles mances betwee October 2015 illing the scien

ions campaign GS developme Processing Fu nt Critical De planned for th le configurati , what will be tion strategies e extragalactic osmological m s, allowing t n 2011 and 20 5. All the mis ntific objectiv ns, as well as ent milestones unctions when esign Reviews he first half of on supporting e held in mid-s will produce c sky, of over models. that scientific 020. ssion elements ves within the s s n s f g -e r c s e

Proc. of SPIE Vol. 9911 991105-17 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

(20)

Following the successful MPDR, the EC-led Science Performance Verification (SPV) plan applicable for the period of 2017-2019 has been set up. The very ambitious SPV aims to verify top-level science performance requirements for the combined WL and GC probes, applying the increasingly mature representation of the mission baseline.

The Euclid Mission Database provides parameter management and distribution system in which the actual system is being modeled and disseminated for the SGS processing functions. This component is essential to synthesize the actual system performances and design parameters for the needs of the ground segment, including science performance evaluations. The hierarchical approach to structure system parameters provide a maintenable, fexible and extensible environment. Mission configurations isolate branches of parameters allowing instrument performances are analysed with as required, as designed, current best estimate or as built parameter sets.

REFERENCES

[1] Laureijs, R. et al., “Euclid Definition Study report”, ESA report ESA/SRE(2011)12, arXiv:1110.3193 (2011) [2] Racca, G., et al., “The Euclid Mission Design” , Proc. SPIE 9904-19 (2016)

[3] Cropper, M. et al., “VIS: the visible imager for Euclid”, Proc. SPIE 9904-20 (2016)

[4] Maciaszek, T., et al., “Euclid Near Infrared Spectro Photometer instrument concept and first test results at the end of phase C”, Proc. SPIE 9904-22 (2016)

[5] Amendola, L. et al., "Cosmology and fundamental physics with the Euclid satellite", arXiv:1606.00180 (2016)

[6] Pasian, F., et al., “Science Ground Segment for the ESA Euclid mission”, Proc. SPIE 8451 (2012)

[7] A. C. Robin, C. Reylé, S. Derrière and S. Picaud. “A synthetic view on structure and evolution of the Milky Way”, 2003, Astron. Astrophys., 409:523 (2003), erratum: Astron. Astrophys., 416:157 (2004)

[8] Skrutskie M. F. et al., “The Two Micron All Sky Survey (2MASS)”, Astrophysical Journal, 131, 1163 (2006) [9] Amiaux, J.; Scaramella, R.; Mellier et al., “Euclid mission: building of a reference survey”, Proc SPIE 8442

(2012)

[10] Alvarez, J. L. et al., “Model-based system engineering approach for the Euclid mission to manage scientific and technical complexity”, Proc. SPIE 9911-12 (2016)

[11] Perryman M; de Bruijne, J.; Lammers U. "A parameter database for large scientific projects:application to the Gaia space astrometry mission", Exp. Astron. 22:143–150 (2008)

Proc. of SPIE Vol. 9911 991105-18 Downloaded From: https://www.spiedigitallibrary.org/conference-proceedings-of-spie on 04 May 2020

Riferimenti

Documenti correlati

L’anarchismo, cioè la soppressione del “principio” e del “governo”, non ci dà la libertà massima possibile perché non dà visibilità al numero massimo

Abbiamo scoperto le fragilità di un sistema, quello educativo, che va innovato e che deve investire sull’alfabetizzazione digitale non solo, come ormai da anni suggeriscono

Tutti i collocamenti di minori e i relativi abbinamenti con i CEM (Terapeutici ed Educativi), vengono fatti dopo un’osservazione e una valutazione della situazione. Si vuole evitare

Impact of primary coronary angioplasty delay on myocardial salvage, infarct size, and microvascular damage in patients with ST-segment elevation myocar- dial infarction: insight

In un paziente poliurico con ipersodiemia, se le urine so- no ipotoniche, occorre scandagliare le varie possibilità eziopatogenetiche che portano a determinare un diabete

Un trapezio ABCD rettangolo ha la base maggiore di misura AB = 8 doppia dell’altezza AD e il perimetro del trapezio misura 22.. In un triangolo isoscele il seno dell’angolo alla

THE MAN DOESN'T TAKE OFF HIS CLOTHES Vol.1 by Narise Konohara Book Novel Yaoi. CELESTIAL CLOTHES SHIONO ETOROUJI JAPANESE ANIME MANGA BOOK SET VOL.1-7. How To Draw Manga BL YAOI

&#34;Il diario di Satana&#34; è un romanzo incompiuto, scritto in forma di appunti di diario, sul destino di Satana sulla terra sotto spoglie umane.. Incarnatosi in un