Planning, Scheduling and

Controlling Long Term Projects

The paper will show how a long term project can be controlled using dynamics or according to the project characteristics and duration.

(2)

65

term is substantially stochastic.

as a project whose duration is more

We dare then to propose a new

short term

be calculated with high reliability and a limited contingency margin

medium term

durations can change not in a way to impact on the constraint structure

long term can change

project can be adjusted during the owners and then in the goals to be achieved through the project (in this case, it would probably be better to divide the whole project in several medium term or long term minor

and medium term, this is to say that deterministic methods are not enough. The most used deterministic method

scheduling are only limited to work start, it becomes quite impossible, or

since there is always something deterministic and, on the other side, deterministic.

allow us to project the past data towards

The historical data we have are generally not enough, in addition short-term statistical data and indicators are not

needed

Major political or economic events,

company, normally “short term” means sheet, “medium term” means within the

while “long term” means beyond the say that short and medium term are substantially deterministic while long

T

his paper is relevant to long term well as industrial project, however we other, longer term projects.

composed by 15 hydroelectrical projects, 17 power plants (thermoelectric or

Even long term project can be duly kept under control, but we must consider meaning. Sometimes the owners do not really own the time span they need, in some cases the original budget are estimated lower on purpose in order to get a project decision. This has important projects. Without those heavily underestimated at the beginning, beginning, nobody would make the decision to go on and the world, today, would be poorer.

time and on budget.

(3)

become clearer, this is still a deterministic methods albeit organised into two levels

method, with the possibility to consider some durations with a stochastic approach.

contingencies and work variation can help up to a certain point, however it

due to owner related events or to major political events, as well as to causes

methods, as they are known in the operational research, we would like to

either the probability that an

the stochastic network creating an equivalent reduced network, that can be managed as deterministic

simulation

as well as stochastic methods can be

operational research, that is beyond the

allow stochastic routines and add-ons. quite impossible to make a reliable adjusted through projected economic

resources needed, whose amount is

as in the overall project budget.

term projects cannot be managed in a be considered neither in level 1 nor in

those cases, also budgeting becomes stochastic.

cases the best way is to divide it into

motorway or railway projects than can be divided in several sections to be put in operation one by one, being the other sections still not completed or even cancelled. The same has been applied side, a project like the bridge to connect divided into sections with the same would become quite useless.

economic indicators are normally work processes. Those indicators are quite reliable in the short and medium and analysing is quite completed and statically correct, but they start

that are assumed as a sample has

services are varying,

the technology evolves,

equipment evolves too.

maintenance workshop whose contract was stipulated on 1976 and suspended [1] that, multiplied

(4)

67

and then to re-negotiate the contract.

When we investigated into the design, we noticed that

the railway signal technology used

calculated considering that the rails be installed by hand, while the on mechanical installation

installation works had had a sensible increase

the workshop should have been in the to say, contractor should have been years, but this consideration was

span suspension bridge with a central

budget was again estimated in about 6

using regression methods and then comparing with the actual data. Some

times the estimated cost

estimated cost

on the assumption that no major change happens neither in the world economic system. The same will apply to sensitivity analysis, that makes

A major petrochemical plant in Middle East was composed by 13 process units centred around a steam cracker, 6 utility units and a connecting network canteen, etc. The project was actually

onsite (process units), that were

offsite (connecting network and

utilities

cooling water system, steam

services (workshops, warehouses, restaurant, emergency toom,

was about 6 years, standard workload

the term sub-project was misused. The project controls was based on a project schedule and on a budget, that were

value criterion to compare the planned versus the actual cost. When the project went into delay and then toregister cost overrun, although the assumption was still to use a deterministic method, constraints as well as the critical path this is to say that the planning became that such change was never declared

was necessary to redraw the structure any sense to keep the process units and to cancel the utilities. Simply, the plant would not work. By this way, the scope

(5)

been better to consider this possibility since the beginning, by introducing by taking into consideration a more suitable division into autonomously sustainable sub-projects.

term project is a medieval cathedral

To have an idea about how those a modern project that is more similar to a medieval cathedral than to the projects we are usually taking into consideration in recent times. Thisis in Barcelona, whose construction been consecrated by pope Benedict

death, in order to complete his design.

construction had to rely only on private not any possibility to make a reliable planning, the work packages were

was changed several times, the actual design is not anymore the original one

completed. “

[2] The Messina bridge was clearly a long term project, albeit articulated in several subprojects (bridge properly so said, road connection in Sicily, road not make any sense to complete the bridge without the road connections on both sides.

corresponding to the reality, it would have been better to consider the subdivided into Project A

gasoline hydrogen, LLD

utilities,

services. Project B

butadiene, polybutadiene rubber Project C

has been managed. When the works were still in the strategic phase. Then,

some years.

A long term project whose scope is quite time to time the parametres to the

kept under control section by section,

impossible to make any assumption about time and cost, thedesign was only the willingness to build a cathedral. Like in medieval cathedrals, design during construction, parts were added Even now, that the cathedral is already consecrated (business-like, we can say

(6)

69

- ,

, Flaccovio

, John W., Kenneth K. editor. , , Marcel, Stuart

, and Eddy

, Alessandro, and Aldo . , Franco Angeli

, Roger, and Donald R. The Ingegneria Economica, Alinea Editrice , [1] L.it [2] La Sagrada Família is

Notes

Riferimenti

Documenti correlati

Among the available embedding feature selection methods ([18], [19]), the Least Absolute Shrinkage Selection Operator (LASSO [20]-[22]) has been used in a few applications

(a) Voltage output from one of the 16 tactile units; (b) result of the algorithm application using a 40 ms window for the ON/OFF signal computation; (c) result of the

In this frame, since the Italian Pharmacovigilance System (Italian Medicines Agency—AIFA) only collects reports for registered drugs, the Italian National Institute of Health

The aim of the present study was to review the experience of our Unit, comparing three different regimens for breast cancer, used in subsequent years: CMF, protocols

Il tramonto apparentemente de- finitivo di questo scenario, a fine Ottocento, in seguito al pensiero epocale di Nietzsche, da un lato frantuma l’orizzonte della disciplina, che si

Naturalmente, dai processi di internazionalizzazione derivano anche degli effetti, sia sullo sviluppo locale che sulla forza lavoro delle imprese venete: i primi, risultano essere

Under the Belarusian Criminal Code, trafficking in persons means purchase and sale of a human being or other transactions with regards to a human being, as well

• list all available attributes for digital cards in the