• Non ci sono risultati.

3 STATE OF ART AND STATE OF PROJECT

N/A
N/A
Protected

Academic year: 2021

Condividi "3 STATE OF ART AND STATE OF PROJECT"

Copied!
1
0
0

Testo completo

(1)

STATE OF ART AND STATE OF PROJECT

Maria Anna Di Iorio | Chiara Rovelli

Prof. Angela Poletti

A BIM-GIS VALUATION MODEL OF URBAN GREEN INFRASTRUCTURE PROJECT

3

The project is born from a real municipality competi-tion, in fact the Mayor wants a green place that can con-nect the central part of Rotterdam with the suburban one. The main hope for this part of Rotterdam is the transfor-mation of an unwelcome, traffic dominated Oostplein into a green urban park at the entrance of the city centre. As the below masterplan shows the green will beco-me the main elebeco-ment of the project. Also the viabili-ty will be completely modified, giving less importan-ce to cars and more importanimportan-ce to pedestrians and bicycle circulation, but also to the public transportation.

Riferimenti

Documenti correlati

This approximant does not take into account any of the other parts of the portion, and is computationally cheap to perform given the low number of parameters involved and the small

By using the term “residents” then the Palestinians of WBGS were treated by the Israeli occupation forces as foreign nationals and aliens, who just happened to be present in

En este contexto, se detiene en los esfuerzos de Felipe González y sus compañeros por hacerse visibles ante los socialistas europeos, y sobre todo los alemanes, para

To assess the effects of Hpx or HO2 knockout on microglial acti- vation, we immunostained brain sections with Iba1 anti- body to observe microglial activation/morphology around

We determine the time evolution of the pressure agyrotropy and discuss how the propagation of “magnetoelastic perturbations” can affect the pressure tensor anisotropization and

That is particularly significant when data are measured with reference to different methodologies; for example, individual data do not always meet the requirement

The method designed in this paper can perform the parking task in any parking scene, but the efficiency is not high because the vehicle needs to move back and forth many times to

This paper (Part 2) includes sections regarding: Promoting Physical Activity across the Spectrum of COPD (Physical activity: definitions, measurements, and significance;