Integration problem Sector 4 and 10

interference between cable tray and RPC service block

12

11 8

W +2

- -

-

- 107

104 100

109

102

118 103

86

64

62

63

65 186

174 106

151 152

59

56

83

82

60

117

111 198

175 184

183

179 177 180

187

133 3 bi gap 3 bi gap

outout 44

280

32 269

38 283 141

34 275

41 282

157 155

268

279 145

144

267 281

140

270

-

- -

2 5 3

6

154 150 153 149

8 17

105 108

116 115

110 11 2 113 114

41 36

3348 43

4

139

142

137

134 138

223

RPC Readiness for installation

New shorter service block has been built.

But changing it on the installed chambers was very difficult: in both chambers we broke the gas inlet

-Chamber in Sector 10 already replaced (last week).

(2)

W+2 Production Accept.

Italy- Sophia

At ISR. Ready for Installation

RB4 1 cham.

sect.8

(To replace sect. 4)

Done

March. March April

Production and test : W+2

Cham 123 (sect. 10 ) and cham 150 (sect. 4) will be repaired at ISR end of April.

(3)

•Sector 4 (chimney).

RB2-RB3 at ISR: 21 March

RB4-RB1. Assembling in March 05.

• RB1

Missing chambers arrive at CERN on 16 March

• RB4

Missing RB4

Under test in Bari.

12 235

190

207 218 172 164

194

202

39 162

182

11 W +1

- -

-

- 49

80

51

52

53 35

210 67

66

68

93

71

27

47 46

129 130 3 bi gap

3 bi gap out

out 222

148 204

31

206 21

234 18

227

156 143

226 273

219 220 224

-

- -

2 5 3

6

8775 73

88 90

76

91

119

10 1

203 205

10

291

20

97 221

225 146

211

ISR Status: W+1

(4)

W+1 Production Accept. Italy-Sophia At ISR. Ready

RB2 done done done Sect 6

End of March

RB1 done

3 cham: Sect 5-11-12 March

3 cham

Sect 5-11-12 16 March

Middle April

RB3 done done 1 cham.

21 March

Middle April

Chimney Sect 4

Feb 05 RB3-RB2 March 05 RB4-RB1

March RB3-RB2

April RB4-RB1

RB3-RB2 21 March RB4-RB1 End April

Middle April RB3-RB2 Middle May RB4-RB1

RB4 done 4 cham: sect 3-5 -6

March April Middle May

Production and test : W+1

(5)

12

79

158 188

132 191

99

9 11 8

W 0

- -

-

-

- 3 bi gap

3 bi gap

outout 233

274 208

236 284 209

192

271 16

232 277 74

169

168 278

-

- -

2 3

4

5

6

Z (+) Face

94

173 95

81 122

11

ISR Status: W0+

• RB1 3 missing chambers under test in Pavia

•RB3 4 missing chambers at ISR on 21 March

•RB4 missing RB4 to be tested in Bari

160

(6)

W0 Production Accept. Italy-Sophia Expected At ISR. Ready

RB2 Done done done Middle May

RB1

Done

3 cham. sect 6-10

April End of April .

End of May

RB3 Done done 21 March Middle April

RB4 Done 4 cham. sect 2 -3

May

End of May End of June

Production and test : W0+

(7)

3 bi gap 3 bi gap Z (-) Face

W -2

3 bi gap 3 bi gap

288 285

161- 159 201

61 290 -

11

10 85 131

189 72 54

55 70 W -1

ISR STATUS: W-1 /W-2 sect 10-11

•RB1 3 chambers to be built + 4 under test in Pavia

•RB2 1 chamber to be built

•RB3 4 chamber under test in Italy

•RB4 2 chambers to be repaired

(8)

W-1/W-2 Set 10/11

Production Accepted Italy-

Sophia Expected at

ISR. Ready

RB2 1 cham

April

May June July

RB1 3 cham.

April

May June July

RB3 done April May June

RB4 done done To be

repaired July

Production and test :W-1/W-2

(9)

RPC readiness vs DT schedule: W+2/W+1/W0+

W+1 36 DT

All chamber but S1/ S 7 and MB4To

W0+ 18 DT

All but MB4To Middle of May

W+2

6 MB4 S 3-5-9-10-11 Ready

9 MB4To W0+ W+1 End of June 3 MB4 W0 + 6 MB4To W+1

RPC Coupling - Installation

11 April – 6 May

30 May – 17 June

4 July – 22 July RB1s under test. Ready middle of April.

Chimney RB2-RB3 ready middle April Chimney RB1-RB4 ready middle May

DT

(10)

Production and test status : W0-

12

4

8

292 289 40

165

231

166 6

9

10 11

12

W 0

- -

-

-

-

212 213

3 bi gap

3 bi gap out

out 229

170 333

236 -

-

6 3 5

2

Z (-) Face

93 89

92 78 96

84 1

To be tested

Ready for installation Under test

(11)

W0- Production Accept. Italy-

Sophia Expected At

ISR. Ready

RB2 2 cham. Sect 4-9 April May July Aug.-Sept

RB1

7 cham: May

June 05 July

Aug-Sept

RB3 3 cham. April May July Aug-Sept

RB4 done April May June

Production and test : W0-

(12)

W-2/W-1 All

Production Ready

RB2 Start March End ‘05

/Beg ‘06

RB1 Start April End ‘05

/Beg ‘06

RB3 Start Feb End ‘05

/Beg ‘06

RB4 Start April End ‘05

/Beg ‘06 Production and test : W-2/W-1

Very preliminary

Riferimenti

Documenti correlati

I candidati per essere ammessi al corso dovranno sostenere apposita prova psico-attitudinali, test in lingua inglese, e colloquio; in tale sede saranno verificati i

The aim of research that was carried out is the analysis of air flow in the spaces where a solar chimney is one of the elements of a gravity ventilation system.. Measurements

The results of the continuous monitoring of the chimney base deflection are presented in a diagram of changes in the values and direction of the resultant deflection vector (Fig.

The increase in student debt, low rate of home- ownership, and low rate of participation in retirement saving plans has produced a big decline in the median ratio of wealth to

SET 4 CARROZZE Livrea ESCI logo rosso // ESCI livery, red FS logo Carrozze: 1ᵃ classe GC tetto liscio, 1ᵃ classe GC tetto liscio, BHR, 2ᵃ classe Z. Carrozze:

Tige en K-Knit sans coutures, avec renforcements en TPU aux points de plus grande usure2. Languette rembourrée avec soufflet pour limiter le passage de la

This sentence has been erroneously taken to be some kind of au- thoritative DSM-IV-TR definition of paraphilia and is then used to justify the diagnosis of a qualifying mental