• Non ci sono risultati.

2) quantity in supply area is lower than reorder point in control cycle; if yes =>

N/A
N/A
Protected

Academic year: 2021

Condividi "2) quantity in supply area is lower than reorder point in control cycle; if yes =>"

Copied!
6
0
0

Testo completo

(1)

Allegato B

Push and Pull Transaction

ZWM_PUSH ZWM_PUSHR ZWM_PULL

Condition(s) 1) quantity in supply area does not cover the material requirements from released production orders within the selected horizon; if yes =>

2) quantity in supply area is lower than reorder point in control cycle; if yes =>

3) automatic creation of TO dependant on push-supply type:

“P” (former “blank”):

- replenishment quantity from control cycle;

- if this is more than necessary to cover the requirements from released production order => only the difference is replenished;

- additonally taking the

“avoid”-packing percentages into account

“A”: always the replenishment quantity from control cycle

“G”:

- complete quantity from next FIFO source storage bin

- if replenishment quantity in control

1) quantity in supply area is lower than reorder point in control cycle =>

replenishment quantity from control cycle will be replenished, no avoid packaging percentages are taken into account

1) quantity in supply area

does not cover the

material requirements

from released production

orders

(2)

cycle is higher than quantity in next source storage bin => more than 1 bin can be replenished

“J”:

- like “P”, but to increase the chance to avoid partial removal from source bins, the

replenishment quantity is not only depending on required quantities from open production orders but also on required quantities from planned orders

- sequence of calcilating the replenishment quantity for

“J”-supply:

1) calculating with push type “P”; if complete removal from source bin is possible: ready

2) if not: calculate with

“J”-parameters

3) the “J”-supply overfills the open required quantity from production orders just 1 time

Execution Manually / automatically Manually / automatically Manually

Number of

material Selectable Selectable Just 1

Number of

supply areas Selectable, but at least 1 Selectable, but at least 1 Just 1

Empties source

- Yes for supply type “G”

- To achieve for supply type “J”

Just coincidentially Always

(3)

storage bin? - Coincidentally for supply type “_”

- For supply type “A” only, if

- The replenishment quantity fits to the bin quantity or

- The replenishment is a multiple of the bin quantities

General comment

Ased on system data thw replenishment is riggered off;

advantage: low manual efforts

Based on system data the replenishment is triggered off;

advantage: low manual efforts

Worker in production

“decides”, at wich time a replenishment is triggered off ;

advantage e.g. in case of

limited available space in

supply area

(4)

Allegato C1

Inforc. Posiz. Impil. Contr. Cerc. Rastr. Sfasc. Fasc.

A B C D E F G H

6 7 9 100 30 4 40 70

Prodotto Codice Descrizione Attività N° op. N° op. N° op. N° op. N° op. N° op. N° op. N° op. Origine Destinaz. Distanza N°viaggi Tempo

P.O. S-Jtd 90600100Prodotto Finito 1-Trasferire a magazzino PF 4 2 2 0 0 0 0 0 11 12 30 4 136

P.O. S-Jtd UNIBOX ALVEARI 2-Trasferire alveari sulla linea 1 1 0 0 0 0 0 0 5 11 153 1 115

P.O. S-Jtd 2240754 CORPO S-JTD 1-Costruire scorta 60 30 30 0 0 0 0 0 1 10 145 30 3740

P.O. S-Jtd 8924016 CORPO LVM S-JTD 3-Togliere vuoti 3 2 2 0 0 0 0 0 9 4 137 1 141

P.O. S-Jtd UNIBOX PERIMETRO 1-Trasferire perimetri sulla linea 1 1 0 0 0 0 0 0 5 11 153 7 727

P.O. S-Jtd Minuteria 1-Controllare fabbisogno rastrelliera 3 0 0 1 0,0 0,0 0 0 29 8 119 3 356

P.O. S-Jtd 2240754 CORPO S-JTD 3-Togliere vuoti 6 4 4 0 0 0 0 0 9 4 137 2 283

P.O. S-Jtd 6241439 INSIEME TROMBA PLASTICA S-JTD 3-Fasciare vuoti 1 1 0 0 0 0 1 1 6 5 106 1 194

P.O. S-Jtd 8924016 CORPO LVM S-JTD 1-Costruire scorta 27 14 14 0 0 0 0 0 1 10 145 1 483

P.O. S-Jtd 8924016 CORPO LVM S-JTD 2-Trasferire 3 CM sulla linea 3 2 3 0 0 0 0 0 10 9 13 1 68

P.O. S-Jtd 6241439 INSIEME TROMBA PLASTICA S-JTD 1-Trasferire pieno sulla linea 1 1 0 0 0 0 1 0 2 7 90 1 113

P.O. S-Jtd 2240754 CORPO S-JTD 2-Trasferire 3 CM sulla linea 6 6 0 0 0 0 0 0 10 9 13 2 95

P.O. S-Jtd 6241280 COPERCHIO S-JTD 3-Fasciare vuoti 1 1 0 0 0 0 1 1 6 5 106 1 194

P.O. S-Jtd 6241278 TAPPO+OR(3.70055.00+1/445 1-Caricare la rastrelliera 0 0 0 0 1,0 12,2 0 0 2 8 104 79

P.O. S-Jtd 6241439 INSIEME TROMBA PLASTICA S-JTD 2-Togliere vuoti 1 1 0 0 0 0 0 0 7 6 60 1 53

P.O. S-Jtd 6241289 ROTORE INTERNO S-JTD - S.I. 3-Fasciare vuoti 1 1 0 0 0 0 0 1 6 5 106 1 154

P.O. S-Jtd 6241288 PIASTRA S-JTD S.I 3-Fasciare vuoti 1 1 0 0 0 0 0 1 6 4 105 1 153

P.O. S-Jtd 6241290 ROTORE ESTERNO S-JTD - S.I. 3-Fasciare vuoti 1 1 0 0 0 0 0 1 6 5 106 1 154

P.O. S-Jtd 6241280 COPERCHIO S-JTD 1-Trasferire pieno sulla linea 1 1 0 0 0 0 1 0 3 7 130 1 140

P.O. S-Jtd 6241018 VITE FIRE-B/C-131(IN SOST.NE DI 6214763) 1-Caricare la rastrelliera 0 0 0 0 1,0 6,0 0 0 2 8 104 54

P.O. S-Jtd 6241289 ROTORE INTERNO S-JTD - S.I. 1-Trasferire pieno sulla linea 1 1 0 0 0 0 1 0 2 7 90 1 113

P.O. S-Jtd 6241290 ROTORE ESTERNO S-JTD - S.I. 1-Trasferire pieno sulla linea 1 1 0 0 0 0 1 0 2 7 90 1 113

P.O. S-Jtd 6241424 TAPPO S-JTD 1-Caricare la rastrelliera 0 0 0 0 1,0 5,0 0 0 2 8 104 50

P.O. S-Jtd UNIBOX PEDANA + TAPPO 3-Trasferire ped. e tap. sulla linea 4 3 1 0 0 0 0 0 5 11 153 1 156

P.O. S-Jtd 6241279 ViteAutof.M6x12 tipsgrowsix tc 1-Caricare la rastrelliera 0 0 0 0 1,0 4,0 0 0 2 8 104 46

P.O. S-Jtd 6241288 PIASTRA S-JTD S.I 1-Trasferire pieno sulla linea 1 1 0 0 0 0 0 0 2 9 117 1 91

P.O. S-Jtd 6241287 VALVOLA S-JTD - S.I. 1-Caricare la rastrelliera 0 0 0 0 1,0 2,5 0 0 2 8 104 40

P.O. S-Jtd 6240870 PRIGIONIERO FIRE46465806 1-Caricare la rastrelliera 0 0 0 0 1,0 2,3 0 0 2 8 104 39

P.O. S-Jtd 6241288 PIASTRA S-JTD S.I 2-Togliere vuoti 1 1 0 0 0 0 0 0 9 6 87 1 71

P.O. S-Jtd 6241286 MOLLA S-JTD S.I 1-Caricare la rastrelliera 0 0 0 0 0,9 0,9 0 0 2 8 104 29

P.O. S-Jtd 6241289 ROTORE INTERNO S-JTD - S.I. 2-Togliere vuoti 1 1 0 0 0 0 0 0 7 6 60 1 53

P.O. S-Jtd 6241290 ROTORE ESTERNO S-JTD - S.I. 2-Togliere vuoti 1 1 0 0 0 0 0 0 7 6 60 1 53

P.O. S-Jtd 6241280 COPERCHIO S-JTD 2-Togliere vuoti 1 1 0 0 0 0 0 0 7 6 60 1 53

P.O. S-Jtd 6241215 LOCTITE N.574 GR.275 (SOST.6240177) 1-Caricare la rastrelliera 0 0 0 0 0,5 0,5 0 0 2 8 104 17

P.O. S-Jtd 6241285 CORTECO S-JTD 40-52-7 (RFT 3.70053.01) 1-Caricare la rastrelliera 0 0 0 0 0,4 0,4 0 0 2 8 104 13

P.O. S-Jtd 6241281 GUARNIZIONE COP. S.JTD 1-Caricare la rastrelliera 0 0 0 0 0,2 0,2 0 0 2 8 104 6

P.O. S-Jtd 6241282 VITE TROMBA S-JTD TB.10360 1-Caricare la rastrelliera 0 0 0 0 0,2 0,2 0 0 2 8 104 6

P.O. S-Jtd 6241340 TAPPO PROTEZIONE FORO RACCORDO 1-Caricare la rastrelliera 0 0 0 0 0,2 0,2 0 0 2 8 104 6

Calcolo del tempo di ogni singola attività

(5)

Allegato C2

Produzione Q in DB Richiesta Q/imballo Buffer(Imballi)Buffer rastrFrequenzaFrequenzaTempo (sec)T. rastrelliera1° A 2° A 1° B 2° B 3° AB

3000 1 3000 32 4 23,44 7,81 1063 L L L

3000 1 3000 28 5 21,43 7,14 821 L L L

1140 1 1140 66 45 0,38 0,13 479 L L L

1860 1 1860 66 3 9,39 3,13 443 L L L

3000 0,031 93 60 1 1,55 0,52 376 L L L

1,00 356 356,0 M

1140 1 1140 66 5 3,45 1,15 325 L L L

3000 1 3000 720 1 4,17 1,39 269 L L L

1860 1 1860 66 20 1,41 0,47 227 L L L

1860 1 1860 66 3 9,39 3,13 212 L L L

3000 1 3000 720 1 4,17 1,39 157 L L L

1140 1 1140 66 5 3,45 1,15 110 L L L

3000 1 3000 2304 1 1,30 0,43 84 L L L

3000 1 3000 245 17 12,245 1,00 79 78,98 M

3000 1 3000 720 1 4,17 1,39 74 L L L

3000 1 3000 2100 1 1,43 0,48 73 L L L

3000 1 3000 2116 1 1,42 0,47 72 L L L

3000 1 3000 2160 1 1,39 0,46 71 L L L

3000 1 3000 2304 1 1,30 0,43 61 L L L

3000 5 15000 2500 3 6,000 1,00 54 54,00 M

3000 1 3000 2100 1 1,43 0,48 54 L L L

3000 1 3000 2160 1 1,39 0,46 52 L L L

3000 1 3000 600 9 5,000 1,00 50 50,00 M

3000 0,031 93 20 5 0,93 0,31 48 L L L

3000 4 12000 3000 5 4,000 1,00 46 46,00 M

3000 1 3000 2116 1 1,42 0,47 43 L L L

3000 1 3000 1200 5 2,500 1,00 40 40,00 M

3000 2 6000 2600 3 2,308 1,00 39 39,23 M

3000 1 3000 2116 1 1,42 0,47 34 L L L

3000 1 3000 3500 2 0,857 1,00 29 29,14 M

3000 1 3000 2100 1 1,43 0,48 25 L L L

3000 1 3000 2160 1 1,39 0,46 25 L L L

3000 1 3000 2304 1 1,30 0,43 23 L L L

3000 0,170 510 1000 3 0,510 1,00 17 17,34 M

3000 1 3000 8000 1 0,375 1,00 13 12,75 M

3000 1 3000 16000 1 0,188 1,00 6 6,38 M

3000 2 6000 32000 1 0,188 1,00 6 6,38 M

Calcolo della frequenza giornaliera di ogni singola attività Impegno nel turno Assegnazione attività

(6)

Allegato D

Operatore T. Minuteria T.Rifornimento T. linea T.Totale Minut.+Rif. Linea Tot. N° attività

1° A 75 103 56 234 29566 1570 31136 282

2° A 78 103 56 237 47664 1570 49234 379

1° B 0 0 239 239 0 8375 8375 100

2° B 0 0 239 239 0 8375 8375 100

3° AB 0 39 295 334 2969 8375 11344 124

Totale 154 244 886 1284 80199 28265 108464 985

N° attività Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot.

282 201 144 345 168 94 262 7 56 63 8 0 8

379 195 144 339 166 94 260 7 56 63 8 0 8

100 0 313 313 0 241 241 0 87 87 0 0 0

100 0 313 313 0 241 241 0 87 87 0 0 0

124 28 313 341 24 241 265 2 87 89 0 0 0

985 424 1227 1651 358 911 1269 16 373 389 16 0 16

N° Impilare N° Controllare rastrelliera

N° Inforcare N° Posizionare

Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot. Minut.+Rif. Linea Tot.

38 0 38 177 0 177 43 1 44 26 2 28

34 0 34 115 0 115 43 1 44 26 2 28

0 0 0 0 0 0 0 17 17 0 7 7

0 0 0 0 0 0 0 17 17 0 7 7

0 0 0 0 0 0 8 17 25 5 7 12

72 0 72 292 0 292 94 53 147 57 25 82

N° Fasciare imballo N° Cercare codice N° Caricare rastrelliera N° Sfasciare imballo

Coefficiente notte 75%

Operatore T. Minuteria T.Rifornimento T. linea T.Totale

1° A 75 105 75 255

2° A 78 105 75 258

1° B 0 2 258 260

2° B 0 2 258 260

Riferimenti

Documenti correlati

Studies of patients presenting to an ED with the chief complaint of headache have identified the following fac- tors to be associated with a higher risk of secondary head-

We know that Δ ℎ and Δ are mean values over a temperature range, and since the required temperature is inside such range, we consider both values as constant... We may split

After 2 and 4 weeks of storage, peaches were put at 20°C and less (LeM) and more (MoM) fruit were analyzed after 2 and 3 days of shelf life for firmness, expressible juice,

Alessandro Degl'Innocenti, Antonella Capperucci & Miss Lucrezia Frateschi (2011): Synthesis of Enantiomerically Pure 1,2-Disubstituted 2-Selenoamines, Phosphorus, Sulfur,

Current understanding, based on the noticeable, small, truly congenital nevi and nevi acquired early in life, is that the first develops before puberty, presents with a

In a first analysis, we compared the time course of pupil diameter observed in 3 conditions: after a verbal cue later reported by the participant as the trigger of a spontaneous