(1)E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management. DOI: 10.1051/ e3sconf/2016 0704003. Flood Modeling and Simulation using iRIC: A Case Study of Kabul City 1,a. 1. Jamal Abdul Naser Shokory , Jun-ichiro Giorgos Tsutsumi and Kazuhito Sakai. 2. 1 Department of Civil Engineering and Architecture, Faculty of Engineering, University of the Ryukyus, Senbaru 1, Nishihara, Okinawa 903-0213 JAPAN 2 Department of Regional Agricultural Engineering, Faculty of Agriculture, University of the Ryukyus, Senbaru 1, Nishihara, Okinawa 903-0213 JAPAN. Abstract. In Afghanistan, floods are common and measures must be taken to protect people and property from damage. There is, however, a lack of detailed observations and research on this subject in this area. Therefore, flood simulation models are needed to identify flood-prone areas. In this study, International River Interface Cooperative (iRIC) program that is river flow and riverbed variation analysis software with several solvers has been used. Nays2DFlood solver that simulates 2dimenstional plane flow has applied to a past flood in Kabul city. River discharge from two inflow points and averaged precipitation from three rain gauges at the time of flooding given as input to the model including DEM (Digital Elevation Model) data. The iRIC was confirmed as a 90-m grid digital elevation model to determine the position of streamlines correctly. However, the highest flood depth was overestimated because the 90-m grids were too coarse to detect the slight slope of the riverbed in some areas. Then the elevation of the riverbed modified using data acquired from Google Earth, and the simulation results improved. Moreover, it was found that river water rather than rainfall was the main cause of the flooding.. 1 Introduction  

(2)  

(3)   a stream or other body of water, or the accumulation of water in areas that are not normally submerged. Floods are affected by various characteristics of precipitation, such as intensity, duration, amount, timing, and phase   [1]. Flash floods are powerful enough to sweep entire houses and bridges away, cause severe and costly damage, and are the primary cause of loss of life in Afghanistan [2]. Afghanistan has always been under the periodic threat of flooding due to intense rainfall, melting snow, or a combination of both. Every year, there are many fatalities and thousands of homes are destroyed as a result of floods [3]. The international disaster database reported that 54.3% of all natural disasters in Afghanistan are flood related, and the average annual economic loss was US$92.17 million from 1990 to 2014 [4]. The capital of Afghanistan, Kabul, is also the          !!    "  3,289,000 in 2012 [5], and it is currently the fifth fastest growing city in the world [6]. Most of the rainfall occurs in April, with the rain events lasting either 1#2 or 3#7 days [7]. In Table 1 a summary of the damage caused by floods in Kabul from 2005 to 2007 is presented. Although the damage varies annually, the numbers of damaged dwellings are large [8]. Many of the most vulnerable houses are constructed in unplanned areas. They are at risk of damage by both earthquakes and floods [9], primarily because the main construction materials used a. are clay and clay bricks, both of which are susceptible to damage during floods and heavy rainfall events. Flood hazard areas have been identified along the administrative boundary between districts 5 and 13 (Figure 1) [8]. In Afghanistan, even basic information is lacking to describe the type of floods, the cause of floods, and the temporal window when floods can be expected. A nationor region-wide map is needed indicating areas that require further investigation and where mitigation studies might be useful [10]. Accordingly, Emlyn Hagen from North Atlantic Treaty Organization introduced the Flood Hazard Mapping Project for Afghanistan in 2008. Utilized a kind of cellular automata in which various amounts of water were simulated by computer to fill up one cell and then flow into the next automaton cell. The data were calibrated using available information from past flood events and remote sensing observational data from the Dartmouth Flood Observatory [11]. However, according to the IPCC Fifth Assessment Report, there is a high $ 

(4)         !  ! $   flows in snowmelt- and glacier-fed rivers. Moreover, it is likely that the frequency of heavy precipitation or the proportion of total rainfall from heavy rainfalls will increase in the 21st century in many areas of the globe [1]. If these predictions come true, they will affect future flood-prone areas. Therefore, using only past flood data may be not sufficient to establish flood protection plans in the future. Moreover, most of the river flows in. Corresponding author: jamalnaser.shokory@gmail.com. © The Authors, published by EDP Sciences. This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/)..

(5) E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management. DOI: 10.1051/ e3sconf/2016 0704003. Afghanistan depend on the amount of annual rain and snowfall [12]. 14. Year. No. People affected Missing. Killed. Injured. 18. 17. 19. No. Of dwellings. 11. 15 10. Partially damaged. Destroyed 106. 2005. 0. 0. 0. 67. 2006. 0. 12. 9. 150. 0. 2007 0 14 10 Table 1. Major Floods in Kabul.. 645. 281. 9. 4. 5. 21 16. 2. 3. 12. 1 8. 13 Boundary- Municipality Boundary-District 6 Landslide-Area Flood Area Special Area (Old Town) Unplanned Residential Area Unplanned Residential Area (HousingDevelopment) Planned Residential Area Planned Residential Area (<60%) Planned Residential Area (<10%) Planned Residential Area (Multistory) Planned built-up Area Area Used by Defense. Source: DMIS (Disaster Management Information System), National Anti-Disaster Department.  . A method to estimate future floods in Afghanistan has not yet been developed. Also, the public monitoring system of flooding in Afghanistan has not been sufficiently developed, and the amount of available data that can be easily obtained is limited. Therefore, a simulation system that can work with a limited amount of data is required. Simulation software is required to develop a simulation system because it takes a long time to write source code for a simulation model, creating simulation systems is challenging. Recently, the International River Interface Cooperative (iRIC) software application was developed specially for river flow analysis in developing countries. iRIC has several solvers, and the Nays2DFlood solver is used for flood analysis. In this study, the iRIC Nays2DFlood solver and flood data that was easily attainable from the Internet for Kabul city was used to evaluate the applicability of iRIC to flood analysis and examine the influence of rainfall and river water on flooding in the area.. 22 7. 20.  0 (    

(6) 

(7) "

(8)  . 2.2 iRIC Nays2DFlood  3 #4    #5 "        "   "   (

(9) 

(10) "  

(11)  

(12) 5    

(13)   

(14)  

(15)  

(16)  

(17)    "  

(18) 

(19) )  

(20) 

(21)   " 

(22) #  -6753 #4     

(23) 

(24)  

(25)  5   $ 8

(26) 5(

(27)      

(28)       (

(29) (

(30)              2)

(31)    

(32)    "     85(

(33)      )   9  

(34)   (

(35) 

(36) "  

(37) :

(38) 

(39) )

(40)    $   

(41) (

(42) " (4;0 4    ;)   0    6         ( (

(43)  "    )

(44) 

(45)

(46)   

(47)   !

(48)   "   "      )

(49)  (

(50) "

(51)  

(52) 

(53)   "

(54)   .

(55) )

(56) . .. .0  /.

(57) .  .

(58) .       %%#  

(59)  &    "    < "   "  "   " 5 

(60) )

(61)    ((   

(62)    (

(63)   "   

(64) )

(65)   )("

(66) +&, . 2 Material and Methods 2.1 Study Area   

(67)      

(68)          

(69)     

(70)    !"#$  #%# 

(71)  

(72)  &''%% ((  )   *##%%    

(73)  +,   

(74)    "   (  

(75)

(76)      "    (      - )

(77)    

(78)        

(79)   . . .  . " . . .  . . .   /. ( 

(80)   

(81) )

(82)  

(83)   "         "   

(84) 

(85)  

(86) " +, 0

(87)  

(88)    

(89) )

(90)   

(91) 

(92)    "  (

(93) " 

(94)     

(95)  

(96) 

(97)    "   

(98)  

(99)  

(100)     (

(101) (

(102)   " 

(103)  0

(104)  

(105) 

(106)  

(107)  )(   " 

(108)  

(109)    

(110)         

(111)       

(112)    " 

(113)           " 1

(114)   "   

(115) 

(116)   "

(117)     

(118) " 

(119)  

(120)   ) 

(121)  +', #   

(122)  "

(123)   

(124)  

(125) )

(126)  

(127)       "   2 " 

(128) 

(129)

(130)   

(131) "  ( (

(132)  "      "   )

(133)   

(134) )

(135)   

(136)      

(137) )

(138)   )

(139)   

(140)   ) 

(141)  )  . . .   -67 3 #4 5)

(142)     8

(143) 5 (

(144)      2)

(145)       85(

(146)     . 2.2.1 Model equations and work steps  "  

(147)     :  $ ;:       ப୦ பሺ୦୳ሻ பሺ୦୴ሻ ൅ ൅ ൌ “ ൅ ”    ப୲. 2. ப୶. ப୲.

(148) E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management డሺ௨௛ሻ డ௧ డሺ௩௛ሻ. ൅ ൅. డሺ௛௨మ ሻ డ௫ డሺ௛௨௩ሻ. ൅ ൅. డሺ௛௨௩ሻ డ௬ డሺ௛௩ మ ሻ. ൌ െ݄݃ ൌ െ݄݃. డு డ௫ డு. െ െ. ఛೣ ఘ ఛ೤. ఘ డ௬ డ௬ ఛ ఛೣ ൌ ‫ܥ‬௙ ‫ݑ‬ξ‫ݑ‬ଶ ൅ ‫ ݒ‬ଶ  ೤ ൌ ‫ܥ‬௙ ‫ݒ‬ξ‫ݑ‬ଶ ఘ ఘ డ డ డሺ௨௛ሻ డሺ௨௛ሻ ௫ ‫ ܦ‬ൌ ቂ‫ݒ‬௧ ቃ ൅ ቂ‫ݒ‬௧ ቃ  డ௫ డ௬ డ௫ డ௬ డ௧. ‫ܦ‬௬ ൌ. డ௫. డ. డ௫. ቂ‫ݒ‬௧. డሺ௩௛ሻ డ௫. ቃ൅. డ. డ௬. ቂ‫ݒ‬௧. డሺ௩௛ሻ డ௬.     (  

(149)     

(150) "  0  

(151)   ;

(152)     = 

(153)   1    +,  

(154)   0 < "" 

(155)   "     2     '%"J )      )  )

(156) 

(157) 

(158)   ' "J        # 1(

(159)  * K5

(160) "  4 

(161)   (

(162)      "  ((   

(163)   9 

(164) 

(165)  (

(166)    

(167)   " < "" 

(168)  ( !        <

(169) "    

(170) 

(171)  )

(172) # 

(173)  

(174) +', . ൅ ‫ ܦ‬௫ # ൅ ‫ ܦ‬௬  ൅ ‫ ݒ‬ଶ &. ቃ .  .  =

(175) K  

(176)  (W  "X  )    [

(177)   Y    )     \

(178)   J  

(179) )     

(180)   +  

(181)  

(182)   )    

(183) )

(184)   

(185)  

(186)    [5

(187)    

(188) )

(189)  

(190) 

(191)  \5

(192)   I 

(193) )

(194)   

(195)           )         ȡ       

(196)  :    

(197)   < )

(198)     ( ( 

(199)   ("( (

(200)   

(201)    

(202)  

(203)   4       

(204)  (

(205) )     -67 ( +&,   )

(206)  

(207) !      "        

(208) . 

(209) . . '      (. DOI: 10.1051/ e3sconf/2016 0704003. a. b. .      .        .  ! "   #   $. %&  . #  

(210) . '   .  

(211)    .  

(212)             

(213)  !. 

(214)    . 

(215)    .   

(216)          .     

(217)      

(218)    

(219)       .  

(220) 

(221)  .          

(222)   . 

(223)  . 

(224)

(225)

(226)  . Figure 3. Procedure for operating the Nays2DFlood solver with iRIC.. . Discharge in m3/sec. 2.2.2 Data preparation and simulation. Tangi Saydan Qala e Malik. 4.1.12 4.2.12 4.3.12 4.4.12 4.5.12 4.6.12 4.7.12 4.8.12 4.9.12 4.10.12 4.11.12 4.12.12 4.13.12 4.14.12 4.15.12 4.16.12 4.17.12 4.18.12 4.19.12 4.20.12 4.21.12 4.22.12 4.23.12 4.24.12 4.25.12 4.26.12 4.27.12 4.28.12 4.29.12 4.30.12. 6  "(

(227)      

(228)     )   "  4;0 

(229)   "    4;0          *%5" 

(230)      

(231) " 2-0 4;0 +, >  

(232)  "   "  )     )  

(233)   4;0    !+, 

(234)   "     !     1

(235) ?62 

(236)  @ )

(237)  A

(238)

(239)  . 

(240) .  . "

(241) .  . 

(242) ".  . . <

(243) " )   

(244)  B% "  " 

(245)  C. +DE,F. 6. .  .

(246)  G. .   .  !. " .  

(247)    

(248)    

(249)   )    4;0   

(250)    

(251)    !

(252)   "      "    

(253) "?;

(254) > )

(255)  4;0     !

(256)   "      (  

(257)  

(258) "  H    2               I  0  !        

(259) & >     ( ! 

(260)    * 1(

(261)  #%#  

(262)      9    

(263) " #H%% * 1(

(264)   'H%% # 1(

(265)  #%#    "    

(266)   (

(267)  (     

(268) "

(269) 

(270)         

(271)    

(272)     

(273)   )   

(274)  . 80,0 70,0 60,0 50,0 40,0 30,0 20,0 10,0 0,0. Precipitation in mm/hour. Figure 5. Daily discharge from two points in Kabul where inputted as hourly at the Model. 6,0. Logar. Qala e Malik. Below Qargha. 5,0 4,0 3,0 2,0 1,0 0,0. « « « « « « 0:00:00 2:00:00 4:00:00 6:00:00 8:00:00 « « « « « « « 0:00:00 2:00:00 4:00:00 6:00:00 8:00:00 « « « « «. 

(275)      . Figure 4. (a) Calculation grid map, colored image shows DEM of the study area with the background image from Google Earth. Blue polygon is roughness setting. Qala e Malik and Tangi Saydan are the inflow points. (b) Orange and purple polygons are modified elevations of the river, dots are the DEM elevation points.. Figure 6. Hourly precipitation during the period of flooding (12:00 19 April to 18:00 21 April 2012) as recorded at three rain gauge stations.. 3.

(276) E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management Log-normal probability Plot. 㻥㻥㻚㻥㻥㻥㻥㻌 㻥㻥㻚㻥㻥㻥㻌 㻥㻥㻚㻥㻥㻌 㻥㻥㻚㻥㻌. Exceedance Probability (%). DOI: 10.1051/ e3sconf/2016 0704003. 㻥㻥㻌 㻥㻜㻌 㻣㻜㻌 㻡㻜㻌 㻟㻜㻌 㻝㻜㻌. 㻝㻌 㻜㻚㻝㻌 㻜㻚㻜㻝㻌 㻜㻚㻜㻜㻝㻌 㻜㻚㻜㻜㻜㻝㻌 1. 10. Peak Discharge (m3/s). Figure 10. Velocity vector map of the study area from the 90-m DEM.. 100. Figure 7. Log-normal probability plot of 26 years annual peak discharge data (1962-1980,2008-2014).. 3.2 Simulation with the modified DEM 1 "         

(277)    4;0   ((  3 #4 )

(278)      ( " (  

(279)  # )   "    " (  

(280)     )   )

(281)  " (  

(282)  &       (  )

(283)  

(284)    4;0   "   

(285)   $   

(286)   :    

(287)  "      "(  9"   ? ;

(288) < "  $    

(289) )

(290)             )   (    

(291)    4;0  )  )

(292)  

(293) )

(294)  

(295) 

(296) )

(297)     &% "

(298)      "     

(299) "      

(300) " ? ;

(301)     )  (   -67 

(302) &

(303) " 

(304) #  

(305) " " < "" "    (   # "    

(306)  "    & "   

(307)  

(308) )

(309)  )  

(310)   "

(311) 

(312)      "  

(313)    

(314)    4;0 0

(315) )

(316)  

(317) "  

(318)     &    

(319) "   

(320)   

(321)     

(322)  "     

(323)   1        

(324) )      

(325)    )  

(326) 

(327) 

(328)  

(329) "  

(330) "  

(331) (

(332)  +*, )  "   

(333)   1  -67    )   :    )    !  )   

(334) "     "     

(335)   

(336)

(337) (        

(338)     

(339) (

(340) 

(341)        -67 "         "               "(

(342)  )  

(343) "6

(344) . 3 Results and Discussion 3.1. Simulation with the original DEM  

(345)    4;0 ((     -6753 #4  )

(346) 

(347)       (" ( 

(348) ' )   "    " (  

(349)  *   )   )

(350)  " ( 

(351) % >  "(

(352)   

(353)  *    !

(354)   " (   

(355) "     -67   

(356)

(357)       

(358)  "  *%5"4;0@ )

(359) " < ""   (%" 

(360)     

(361) '   )  "     

(362)  " 

(363)    " < "" (      

(364)  *   % = 

(365) 

(366)  < "    )     

(367)   

(368)   6  )

(369)     

(370)  

(371)   

(372)    )   

(373)  

(374)  "  (

(375) 

(376) "       ( 

(377) "  *%5" 4;0 

(378) 

(379) $")    "   "    

(380)  

(381) "    

(382) "?;

(383) . . a. Figure 8. Flood depth map of the study area from the 90-m DEM.. b. . Figure 11. (a) Original DEM at 72720 sec, The DEM could not pass the Flood. (b) Modified DEM at 72720 sec, the Flood covered certain area.. Figure 9. Velocity magnitude map of the study area from the 90-m DEM.. 4.

(384) E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management. DOI: 10.1051/ e3sconf/2016 0704003. (a). Figure 12. Flood depth map of the study area from the 90-m modified DEM.. (b). . 

(385)  "    

(386)  "(

(387)   (   

(388) (

(389)  +*,$ ?;

(390) "     "  

(391)  . Figure 13. Velocity magnitude map of the study area from the 90-m modified DEM.      ( " (    

(392)   

(393) "  *%5" "   4;0 

(394)    . 4 Conclusions Figure 14. Velocity vector map of the study area from the 90-m modified DEM. 3 #4 )

(395)   -67 ((  "  (  )                  6

(396)  7   (

(397) 

(398)    H   -67   "   

(399)  "  

(400)

(401)    *%5"

(402) 4;0 # =

(403) )

(404)    

(405)   )  

(406)           "     )    *%5"

(407) 4;0=

(408) 

(409)  "    )    

(410)    

(411) "  

(412)   

(413)  "   = 

(414)     "            "   4;0  &  

(415) )

(416)  

(417)  

(418) 

(419)    

(420)     

(421)    6 

(422)      

(423) )

(424)  

(425)    (

(426)  (       (  (    

(427)      "   

(428)   " ! (   )  

(429)        9

(430)  9 

(431)  "(" "    " 

(432) (

(433)  

(434) 

(435) 

(436)  )  "   

(437)   )"  . 3.3 Examination of the influence of rainfall and river water )

(438) ( < "  

(439)    

(440) )

(441)  

(442)    <      

(443)      "  

(444)  

(445)      (   

(446)        "    4;0       

(447)     

(448) # 

(449)   

(450)  "(

(451)      "        

(452) )

(453)  

(454) 

(455) 

(456)    

(457)     

(458)        "

(459)     (   

(460)  # (

(461) "

(462)   

(463)  

(464)    "       

(465)    0

(466) )

(467)   (    

(468)  "

(469)    :        

(470)   (

(471) 

(472)   

(473) 

(474)  

(475)    

(476)    

(477) )

(478)    

(479)     

(480)  

(481)    (         ) " 

(482)  

(483)  (

(484)        . 5.

(485) E3S Web of Conferences 7, 04003 (2016) FLOODrisk 2016 - 3rd European Conference on Flood Risk Management. 5 References 1.. 2.. 3.. 4.. 5.. 6.. 7.. 8.. 9.. 10.. 11.. 12.. 13.. Seneviratne S. I., Nicholls N., Easterling D., Goodess C. M., Kanae S., Kossin J., ... Zhang X. (2012). Changes in climate extremes and their impacts on the natural physical environment. Managing the risks of extreme events and disasters to advance climate change adaptation. IPCC, 109-230. http://ipccwg2.gov/SREX/images/uploads/SREXChap3_FINAL.pdf Jones J. A., Vardanian T., Hakopian C. (2009). Threats to global water security, Eds; Springer Science & Business Media. pp. 179-185. NATO-News. Satellite map helps predict floods in Afghanistan. http://www.nato.int/cps/en/natohq/news_56368.htm? selectedLocale=en(16.May.2015). Prevention Web.net. Afghanistan. http://www.preventionweb.net/countries/afg/data/ (16.May.2015). CSO (Central Statistics Organization). Afghanistan Statistical Yearbook 2012/13. http://cso.gov.af/Content/files/Population of Kabul City by District and Sex.pdf (16.May.2015). & '( )(*+, ,'' ,' &, '

(486)      growing cities and urban areas from 2006 to 2020. http://www.citymayors.com/statistics/urban_growth1 .html (16.May.2015). Dartmouth Flood Observatory. Duration of Floods Since (1985). http://floodobservatory.colorado.edu/archiveatlas/dur ationmonthmap.htm (16.May.2015). Takashi Koyama of RECS International Inc., Yachiyo Engineering Co., Ltd., and CTI Engineering International Co., Ltd. Draft Kabul City Master Plan. JICA 2011 6.1#6.56 http://pdf.usaid.gov/pdf_docs/pa00jmmj.pdf IRIN humanitarian news and analysis. AFGHANISTAN: Unsafe housing puts Kabul residents at risk. http://www.irinnews.org/report/85585/ (16.May.2015). Hagen E., Shroder J. F., Lu X. X., and Teufert J. F. (2010). Reverse engineered flood hazard mapping in Afghanistan: A parsimonious flood map model for developing countries. Quaternary International , 226(1-2): 82-91. http://www.sciencedirect.com/science/article /pii/S1040618209004273. Shroder, Jones E. (2014). Natural Resources in Afghanistan, 1st ed.; ELSEVIER. Waltham, USA, pp. 253-258. Favre R., and Kamal G. M. (2004). Watershed atlas of Afghanistan. Kabul: Ministry of Irriga. Aizon, I-II, 20-37 http://aizon.org/Watershed Atlas of Afghansitan/Volume I/Watershed Atlas_Part I & II.pdf Lashkaripour G. R., and Hussaini S. A. (2008). Water resource management in Kabul river basin, eastern Afghanistan. The Environmentalist, 28(3), 253-260. http://www.researchgate.net/publication/225906403_. 14.. 15.. 16.. 17.. 18.. 19.. 20.. 21.. 22.. 23.. 24.. 6. DOI: 10.1051/ e3sconf/2016 0704003. Water_resource_management_in_Kabul_river_basin _eastern_Afghanistan Takuya I., and Toshiki I. (2012) Nays2D Flood Solver Manual. iRIC Project, 1-25. http://iric.org/en/download/get/KNwWfa SRTM DEM Shuttle Radar Topography Mission http://www.viewfinderpanoramas.org/Coverage map viewfinderpanorama s_org3.htm (I42) (16.May.2015). Lehner B., Verdin K., and Jarvis A. (2006). HydroSHEDS Technical Documentation. World Wildlife Fund US, Washington, DC, 1-27. http://hydrosheds.cr.usgs.gov/webappcontent/Hydro SHEDS_TechDoc_v10.pdf MEW (Ministry of Energy and Water) Afghanistan, Water Resources Department. http://mew.gov.af/en (Add: Darullaman Road, 6th district, Kabul Afghanistan. Data was asked directly from Ministry office and it is not available in website) Pajhwok News: Flash Flood in Kabul Apr.2012 http://www.pajhwok.com/en/photo/176592 (16.Apr.2014). Wikipedia: Log-normal distribution https://en.wikipedia.org/wiki/Lognormal_distribution (20.Oct.2015). Takuya, I.; Toshiki, I. Nays2D Flood Examples. iRIC Project 2013, 1-87. http://iric.org/en/download/get/zdd4wJ fernan J. E., and Tawn J. A. (2004). A conditional approach for multivariate extreme values. Journal of the Royal Statistical Society, Series B (Statistical Methodology), 66(3), 497#546 Alonso E., Degoutte G. and H. Girard (1990). Results of seventeen years of using geomembranes in dams and basins. Proceedings of the 4th International conference on geotextiles, geomembranes and related products, Vol. 2, The Hague, The Netherlands, pp. 437-442. Cazzuffi D. (1987). The use of geomembranes in Italian dams, International Water Power & Dam Construction, Vol. 39, No. 3, pp. 17-21. Carvajal C., Peyras L., Arnaud, P., Boissier D. and Royet P. (2009). Probabilistic Modeling of Floodwater Level for Dam Reservoirs, Journal of Hydrologic Engineering, 14(3), 223-232.

(487)

Riferimenti

Documenti correlati

The pre-retrofit monitoring plan will include: delivered energy for space heating (Milan), delivered energy for electrical household and common uses (Milan and Lisbon), detailed

Both EUM and DTA have been considered in machine learning venues, instead, where different EUM algorithms have been proposed, and the optimal (Bayes) classifier at the population

The aim of this pilot study was to evaluate whether robot-assisted arm training might improve upper limb function in patients with Parkinson ’s disease.. Findings: Ten patients

[r]

This paper is organized as follows: Section 1 gives an introduction of this simulation system architecture; Section 2 talks about the flowchart of the whole simulation system design

Sea level rise, storm surge and high river discharge would increase water levels in the Huangpu River, the improvement of the floodwall (keep protection level of 1000 years

The topics discussed during the interviews included flood management procedures, agencies involved in handling the flood, early warning and preparation, evacuation

The purposes of this study are to prepare a flood hazard mapping in Perlis and to evaluate flood hazard using frequency ratio, statistical index and Poisson method.. The six