comune di trieste P.zza Unità d'Italia, 4 34121 Trieste Telefono 040/6751 www.comune.trieste.it partita iva 0021024321

AREA LAVORI PUBBLICI, FINANZA DI PROGETTO E PARTENARIATI Spazi Aperti, Verde Pubblico e Strade

Codice Opera 17035 Progetto esecutivo - elaborato I

CRONOPROGRAMMA DEI LAVORI

! "" #

$ "

$ % & & $ '

Trieste, ottobre 2018

(2)

COMUNE DI TRIESTE

P.zza Unità d'Italia, n. 4 Telefono 040/675111 Telefax 040/675…..

e-mail: @comune.trieste.it C.F. e P. IVA: 0021024321

AREA LAVORI PUBBLICI, FINANZA DI PROGETTO E PARTENARIATI Spazi Aperti, Verde Pubblico e Strade

OGGETTO: Codice Opera 15045

Rifacimento segnaletica orizzontale - Anno 2017

CRONOPROGRAMMA DEI LAVORI

settimana rif. tav. zone d’intervento tipologia intervento

1 1, 2 Santa Croce in orario diurno

2 4, 5 Banne-Conconello, Trebiciano, Padriciano, Gropada

in orario diurno

3,4 2, 7 Grignano in orario notturno

5 5 Longera - Sottolongera in orario notturno 6,7 9 Barriera Vecchia - Ospedale in orario notturno

7 9 Barriera Nuova in orario notturno

9 9, 12 Foraggi – Rossetti - Piccardi in orario notturno 10 10,12 Rozzol, Ippodromo in orario notturno

11 12 S.M.M.Inferiore in orario notturno

12 12 S.M.M.Superiore in orario notturno

Gli interventi previsti nel presente appalto e riportati nelle planimetrie di progetto possono, in fase esecutiva, subire modifiche derivate dalle esigenze di intervenire con carattere d’urgenza in altre località di tutto il territorio del comune di Trieste, dichiaratamente considerate di potenziale pericolo per il pubblico transito perciò l’effettiva programmazione sarà fatta solo alla consegna dei lavori di

(3)

ogni singolo stralcio esecutivo, valutando in quel momento le esigenze di quartiere e le opportunità dettate dal coordinamento generale dei servizi. (cfr. art. 11.2 “Programma esecutivo dei Lavori” dello Schema di Contratto per gli appalti pubblici di lavori)

2

(4)

Atto n. 539 del 22/10/2018 Questo documento è stato firmato da:

Elenco firmatari

ATTO SOTTOSCRITTO DIGITALMENTE AI SENSI DEL D.P.R. 445/2000 E DEL D.LGS. 82/2005 E SUCCESSIVE MODIFICHE E INTEGRAZIONI

NOME: CORTESE ENRICO

CODICE FISCALE: CRTNRC58S30L424X DATA FIRMA: 17/10/2018 11:39:00

IMPRONTA: 2833A1CA0B39BF7AF1846A10B61600C703AC191F3F31F969970A5424BC3C66F6 03AC191F3F31F969970A5424BC3C66F68608DFE1FF1444CA243D738F28BDE37D 8608DFE1FF1444CA243D738F28BDE37DC3102A968C8512A3C72AC9E54E4C7971 C3102A968C8512A3C72AC9E54E4C797118A8ED1BC76D3B4C58980C0A6A32105E

NOME: TERRANOVA SANTI

CODICE FISCALE: TRRSNT56A17C351S DATA FIRMA: 23/10/2018 19:56:44

IMPRONTA: 847778F86A75260814359E2D784D62A9B7EDF2AC26080E05B2A16C2FAF1103F4 B7EDF2AC26080E05B2A16C2FAF1103F41CF86F8D9716DE2CB7C8540FD8460ED7 1CF86F8D9716DE2CB7C8540FD8460ED75C11DE39CF914BE51BC67998CA5EC8C2 5C11DE39CF914BE51BC67998CA5EC8C23A3915F0FF1180C8E17F8ECE875E5BE6

NOME: POLIDORI PAOLO

CODICE FISCALE: PLDPLA64S07L424P DATA FIRMA: 24/10/2018 12:51:07

IMPRONTA: 045DE5C0B62AED3253357CCB065E28A2C91CCA0FC30B83516A368FFF026FF616 C91CCA0FC30B83516A368FFF026FF6164B583ED1D2E148F14CC0A73C2F3C0D28 4B583ED1D2E148F14CC0A73C2F3C0D283DE8DE48FD3276D7C79EB11B37761C48 3DE8DE48FD3276D7C79EB11B37761C48448A5FB22C0AFD653DA8A14A27847167

Riferimenti

Documenti correlati

 cavo tipo FG7(O)R rispondente alla norma CEI 20-22 II (non propagazione dell’incendio), norma CEI 20-35 (non propagazione della fiamma), norma CEI 20-37 I (contenuta emissione

La Regione Abruzzo attraverso il MASTERPLAN ABRUZZO, Settore Prioritario Ambiente – PSRA n.44 Interventi di difesa della Attuazione DGRn.34 del 02.02.2017 –

l'affidamento del minore ai servizi sociali, avesse omesso di vigilare adeguatamente sulla condotta tenuta all'interno della Comunità dalla madre che godeva di ampia libertà di

ORDINE INGEGNERI PROVINCIA DI CAGLIARI N..

AMMINISTRAZIONE AGGIUDICATRICE: COMUNE DI Modena (MO) – con sede in Via Scudari n. NORME DI GARA: Le regole della gara sono contenute nel presente Bando e ulteriormente

1. La esecuzione dei contratti aventi ad oggetto lavori, servizi, forniture, è diretta dal responsabile unico del procedimento, che controlla i livelli di qualità delle

C ollettori solari piani U niko -p21 - a rea 2,06 m 2 Il collettore UNIKO-P21 è reversibile per l’installazione in verticale o orizzontale grazie agli accessori idraulici,

“colonna B” e saranno realizzate ai lati del nuovo canale. Le barene nelle quali si prevede di refluire parte del materiale fanno parte degli interventi di ripristino morfologico a