[1] Fielding C. The design of fly-by-wire flight control systems. BAE SYSTEM, Aerodynamics (W427D), Warton Aerodrome, Preston PR4 1AX.
Testo completo
Documenti correlati
Due disegni (figg. 16, 17 ) raffigurano in maniera precisa i dettagli della fronte ad ortostati: la struttura di lastre e blocchi di diverse dimensione che lo compongono, il
The conclusion focus is on the European Banking Union, the massive project which aims to (i) foster financial integration, (ii) limit financial instability and
This part provides a preliminary evaluation of feasibility of the three main solutions (ETICS, rain-screen façades, prefabricated panels) in terms of (i) structural feasibility,
We are now able to state the existence and uniqueness results for a delayed forward-backward system, where both the forward and the backward component exhibit a delayed behaviour,
In tale riflessione il “fuori” si articola in un pensiero teoreticamente denso ma non per questo slegato dal reale, anzi fortemente incentrato su una
The aim of the present study was to evaluate the impact of the KRAS mutational status on time to first metastasis (TTM) and overall survival (OS) in a cohort of Sardinian
There are a number of important factors that contributed to the BioMart’s success and its adoption by many differ- ent types of projects around the world as their data man-
The Identity, the Variance Identity, the Market model, and the Constant Correlation are the most efficient target matrices towards which to shrink, while the EWMA is the worst for