UNIVERSITA' DEGLI STUDI DI SALERNO Dipartimento di Ingegneria Civile
Corso di Laurea Magistrale in Ingegneria Civile
Corso di Design Of Steel Structures A.A. 2019/2020
Esercitazione progettuale:
Progetto di un edificio multipiano in acciaio
Tavola 1:
- Piante impalcati (scala 1:50)
- Particolari costruttivi (scala 1:10) - Sezione solaio (scala 1:5)
DOCENTI:
Prof. Ing. Vincenzo Piluso Prof. Ing. Massimo Latour
STUDENTE:
Roberto Sica
matr. 0622101043
IMPALCATI 1-2-3
IPE400 IPE400 IPE400
IPE400 IPE400
HE500B HE500B HE500B HE500B
HE500B HE500B HE500B HE500B
HE280A
HE280A
HE280A
HE280A HE280A
HE280A HE280A
HE280A
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360
IPE270
IPE360
IPE360
IPE360
IPE360
IPE360
IPE360 IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270 A
B
495049504950
Soletta C25/30
con rete elettrosaldata B450C 8/200
SCHEMA DI SOVRAPPOSIZIONE DELLE LAMIERE
IMPALCATI 4-5
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360 IPE360
IPE360
IPE360
IPE360
IPE360
IPE360
IPE360 IPE360
HE450B
IPE360 HE450B
IPE360
HE450B HE450B
HE450B HE450B HE450B HE450B
IPE360 IPE360 IPE360
HE240A
HE240A
HE240A
HE240A
HE240A HE240A
HE240A HE240A
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
495049504950
4950 4950 4950
IMPALCATI 6-7
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360 IPE360
IPE360 IPE360 IPE360 IPE360
IPE360
IPE360
IPE360
IPE360
IPE360
IPE360 HE240A
HE240A
HE240A
HE240A
HE240A HE240A
HE240A HE240A
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE270
IPE330 IPE330 IPE330
HE360B HE360B HE360B HE360B
HE360B HE360B HE360B HE360B
IPE330 IPE330 IPE330
495049504950
4950 4950 4950
IPE360 S275JR IPE360
S275JR
70 40
7521075 45604560
Angolari n.4 S275JR L 100x100x8
52 40
210
100
45604560
Angolari n.4 S275JR L 110x110x8
62 40
210
110
45604560
Angolari n.4 S275JR L 110x110x8 IPE360
S275JR
IPE360 S275JR
IPE360 S275JR IPE360
S275JR
HE280A S275JR Angolari
L100x100x8 S275JR
Angolari L110x110x8 S275JR
Angolari L110x110x8 S275JR
IPE360 S275JR IPE360
S275JR
70 40
60 40
7521075 45604560
Angolari n.4 S275JR L 100x100x8
Angolari n.4 S275JR L 110x110x8
VISTA DALL'ALTO VISTA FRONTALE
VISTA LATERALE
Part. A: Collegamento trave - colonna HE280A - IPE360 (interno)
15
IPE270 S275JR IPE270
S275JR IPE360
S275JR
IPE360 S275JR
IPE270 S275JR Angolari
n.2 S275JR L 100x100x8 Bulloni
M16 8.8
Angolari n.2 S275JR L 100x100x8 Bulloni
M16 8.8
IPE270 S275JR
948068 28
81
45
IPE360 S275JR 128
8095
Angolari n.2 S275JR L 100x100x8
100
170
40 52
Part. B: Collegamento trave principale - trave secondaria IPE360 - IPE270
IPE270 S275JR IPE270
S275JR
IPE360 S275JR
PIOLI NELSON h= 80 mm d= 19 mm
Lamiera grecata SAND55/600 S280GD spessore 0.8 mm Rete elettrosaldata
B450C 8/200 Malta di allettamento
40 mm Pavimentazione
Soletta collaborante in CLS C25 /30 spessore 55mm
Sezione solaio (scala 1:5)
PROFILO ACCIAIO
HE500B S355
HE450B S355
HE360B S355
IPE360 S275
IPE330 S275
IPE300 S275
IPE270 S275
HE280A S275
HE240A S275