• Non ci sono risultati.

N EW P ISA SOCCER STADIUM DESIGN

N/A
N/A
Protected

Academic year: 2021

Condividi "N EW P ISA SOCCER STADIUM DESIGN "

Copied!
1
0
0

Testo completo

(1)

Abstract P ROGETTAZIONE DEL NUOVO STADIO DI CALCIO DI P ISA

__________________________________________________________________________

__________________________________________________________________________

III Graduation Thesis

N EW P ISA SOCCER STADIUM DESIGN

Abstract

This project concerns structures for a new sports complex consisting in a soccer stadium and two Olympic swimming pools. The three main targets of this thesis are: town- planning, and architectural and functional design (of the stadium only) and, finally, a structural analysis of possibility of a sheeting covering .

With regard to the first point a careful analysis was carried out of the state of the approach roads to the area to create a hierarchy, partly through the presence of a roundabouts and a system of wide avenues. We then arranged 4400 parking-places subdivided into 6 independent sectors , completed by a bus station and a specially constructed railway station on the stretch of railway line between Pisa and Collesalvetti.

In the next stage, we dealt with the formal and functional studies of the stadium; we proceeded to analyze the “aesthetic” options in the perspective of the rules concerning exits, emergency exits, entrances, visibility etc.

Built in two rings, the stadium has no running track and the first ring is partly sunken below ground level, thus permitting a reduction in the total height of the building and providing a substantial reduction in visual impact. Characterized by large glass doors, the elevations are evenly subdivided by 12 pre-fabricated reinforced concrete structures, which contain the access ramps to the second ring. These buildings support 12 lattice girders and the polycarbonate covering of every sector of the stadium.

The final part of this thesis concerns the dimensional structural design of the entire covering; in particular, we deal with checking the girders, which have a 31 m span and an equilateral triangular section with the vertex uppermost and are doubly tapered to either end.

In conclusion, in accordance with the Eurocode 3, we checked two spatial joints and then

made an estimate for their transportation and assemblage.

Riferimenti

Documenti correlati

Since then it has been proposed several times to re- build that connection, for various reasons: in 1825 he wanted to make a bold metal three bays suspended bridge, in 1852 the

Per questo è necessario tenere presenti entrambi gli aspetti della verità scientifica: se da un lato essa è sempre legata a un contesto di concetti e

The “negative” popularity of Dalí was dispersed throughout his writing, especially in The Secret Life, an important document of vital reorientation and proof of the lucid..

The spar consist of two beams made of fir wood that run all the way from the aircraft plane of symmetry to the rib located at 1.8m from the effective wing root.. The total length of

As measures to create and restore the architectural expressiveness of the city, along with the current decree of the government of the Voronezh region "On the approval of the

During the transfer of data to the tax authorities on the availability of real property subject to taxation from physical persons, identification of addresses of buildings in

In the fourth chapter, the behavior of entanglement in open quantum systems is described: in particular, a two-qubit system is studied, analyzing both entanglement generation

A rare association of infra-diaphragmatic sinus histiocytosis with massive lymphadenopathy (SHML) (Rosai-Dorfman disease) and anaplastic large cell lymphoma (ALCL) in the same