CMS Muon Barrel Chambers
Muon chambers
Production sharing
Aachen Madrid Torino Padova
Chambers that can’t be installed in SX
Magnetic and radiation environment (Barrel)
Magnetic Field highly inhomogeneous can locally reach
.8 T perpendicular to the wire plane (MB1) .3 T parallel to the wires (ch. borders&corners)
neutron <104 Hz/cm2 (MB1 And MB4) (1010/cm2 in 10 years) absorbed dose << 1 Gy /10 years operation in the worst case
HIT rate < 10 Hz/cm2 (1 to 10 KHz/wire or RPC channel) collected charge . 5 C/cm of wire (1 hit=4*MIP,100 Hz/cm2,gain 10^5)
Vecchio design:
problemi strutturali
Nuovo design:
Front ends
Readout/Trigger/Control
Minicrate
DRIFT TUBE CHAMBER
RPC
MB96 full scale MB1 prototype
Conto approssimato quantita’ di lavoro a LNL:
• 1 camera : 3 SuperLayers
• 1 SuperLayer ~ 9 giorni lavorativi ( tbv)
• 12 MB3/ ruota * 5 ruote = 60 camere da fare a LNL
• ~ 540 giorni lavorativi per 180 SL (se tutto va bene)
• almeno 3 anni per la pura costruzione delle camere
• a partire da fine 2001 attivita’anche al Cern:
test camere dopo trasporto installazione in CMS
CURRENT CMS MASTER PLAN UP TO APRIL 2004
vers. 28>>30
YB-2 YB-1 YB-0 YB+1 YB+2
YE-1,-2,-3 YE+1,+2,+3
2001 2002 2003 2004
Windows for MU ch. Installation in SX (CMS SC march 20/00,under discussion) Modified 5/4/00
2000
In green the wheels assembly windows (for supporting rails)
Installation procedures/tools/times…..must be understood and agreed
DT+RPC INSTALL.
Attivita’ svolta sinora:
• R&D sulle caratteristiche del rivelatore (risoluzione, ageing,…)
• Progettazione di tutto il rivelatore
• Progettazione dell’elettronica di frontend e del “cuore”
di quella di trigger
• Coordinamento del progetto, link con industrie e con siti remoti di produzione di manufatti
• Setting-up linee di produzione a Legnaro (ancora in corso
• Inizio progettazione tool installazione
• Software, simulazioni per trigger alto livello, ….
• ……..
(RISULTATI PRELIMINARI test beam 2000)
Legnaro - Phi assembly table
Assembly hall in Legnaro
Aluminum Plates (rough cut) Firm: Pechiney (F)
Mylar tape for strips Firm: H-hold (I)
Aluminum tape for strips Firm: H-hold (I)
External supplier: Dubna Scope: cut Al plates to specs
deposit strips check strips pos.
HV test Order : Cern
Aluminum I-beams Firm: Erbsloh (D)
Mylar tape for cath.
Firm: H-hold (I)
Aluminum tape for cath.
Firm: H-hold (I)
External supplier: Protvino Scope: cut I-beams to length
clean I-beams deposit cath. Tapes HV test
Order : Cern
HV distribution boards pcb’s (HVB) Firm: TVR
HV hybrid resistors Firm: ?
HV decoupling boards pcb’s (HVC) Firm: ?
External supplier: IHEP (Bejing) coll. Institute Scope: mount HVB
mount HVC HV test
mount interconnections
Cern
Production sites:
Aachen Madrid
Padova (LNL) Torino
From industries:
•f/e boards
• f/e preampl.
• Contacts
• endplugs
• crimping blocks
• Honeycomb panels
• gas enclosures profiles
• HV custom connectors
• cables & connectors
• ….
Wire
Company: Microfil
External supplier: Aachen coll. Institute Scope: characterize wire spool
measure mag. properties
Production & test of HV boards in IHEP - Beijing
Production & test of HV boards in IHEP - Beijing
Attivita’ nel prossimo futuro (lista parziale):
• preparazione sistema slow-control ambientale nel sito di produzione a LNL (temperature, gas, pressione atm. etc)
•costruzione SL a LNL
• test funzionali dei medesimi (HV, rate in cosmici,..)
• assemblaggio di camere
• test esaustivi delle medesime con r/o (efficienze, risoluzioni,..)
• trasporto Cern, tests, installazione
• finalizzazione progetto trigger, eventuali tests ulteriori
•attivita’ software (vedi presentazione Mirco)
Stima man-power necessario per costruzione camere:
2 tecnici meccanici + 2 elettrotecnici per linea di produzione SL:
3 linee = 12 tecnici a LNL (10 da Pd, 2 da Bo) per attivita’ di trigger e front-end: qualche tecnico elettronico da OE (da quantificare)
per preparazione particolari meccanici+ installazione al Cern ci sara’a bisogno di altri tecnici dalla OM
supporto del gruppo calcolo per i PC che gestiscono i tools a LNL
attivita’ di fisici necessaria per attivita’ di tests rivelatori, integrazione al Cern con altri sottosistemi ( per es. RPC),..