Constructability and Safety Assessment Design Approach

Verifi ca di costruibilità in sicurezza con l’ausilio di strumenti grafi ci

The theme of this contribution fi ts astride two strands of the studies of Construction Management: health and safety risks management on construction sites and constructability design approaches. The hypothesis developed in this approach is to entrust the design a harmonizing function between the parties. In particular, it refers to the delicate moment in which Executive Design implements in a Constructive one. The method proposed, working directly on design drawings, allows the specifi c and detailed assessment of safety conditions for the realization of the item in question. This allows, as well, to verify the constructability of the element itself, before opening the working site and when it’s still possible to intervene, if necessary, with amendments under the designer control.

Il tema del presente contributo si inserisce a cavallo di due fi loni di studi propri del Construction Management: la Sicurezza Cantieri e la Costruibilità. Per affrontare la questione si fa riferimento ad un approccio che riconosce un ruolo chiave all’attività progettuale in generale ed, in particolare, alla evoluzione del Progetto Esecutivo in Costruttivo. Il metodo proposto consente, intervenendo sulla rappresentazione grafi ca degli elaborati progettuali, da una parte la valutazione specifi ca e dettagliata delle condizioni di sicurezza per la realizzazione dell’elemento in oggetto, e contestualmente di verifi carne le condizioni di cantierabilità, in una fase precedente il cantiere e quindi in un momento in cui è ancora possibile intervenire, se del caso, con modifi che, più o meno signifi cative sul progetto senza che esso ne risulti snaturato nella sua primitiva impostazione.

Keywords: construction management; constructability; health and safety; construction site; executive

(2)

The goal of improving building process for better construction results can be usefully implemented investigating possible relationships between health and safety risks management on construction sites and constructability design approaches.

The issue of safety is strictly related to construction management for the use of provisional facilities, of equipment and machinery, of hazardous materials and for poor environmental conditions, but above all for the need to work “at altitude”. The unpleasant result is that workers of Construction Industry have in many countries the sad distinction of being at the top for numbers of deaths at work. This is an old problem, because is intimately connected with the dynamics of construction phase, but only from some twenty years it has particularly felt as social emergency, for a raising awareness of public opinion and probably as a result of a specifi c focus of international and local legislations. Remains an item worthy of note the progressive decrease of the incidents as a consequence of amendments to the legislative apparatus precisely, paradoxically, when the growing media attention leads to the general public feeling that is growing the number of accidents.

Who is involved for work or research in Construction Management or Building Production, must be interested on the question, because signifi cant for the entrepreneurial dynamics in the construction industries. It’s wrong to believe this is only a boring and probably useless issue of formal compliance. Regarding safety duties small companies complain often about a lack of actual improvement in the cost-benefi ts balance compared with the high price paid in terms of heavy bureaucratic apparatus characterized with a strong impact in terms of time commitment, utilization of human resources and economic investment. For sure this is a long-term investment and now we are paying also a generational price in terms of workforce accustomed to work under insuffi cient safety conditions. Surely the oldest ones may have suffered the invitation to change their way of working as an external coercion, often incomprehensible, for formal requirements which are justifi ed by the risk of a penalty, more than by necessity. Even worse is the widespread feeling that the Safety could even be an obstacle to work.

Although all the efforts, the number of accidents is dramatically high and who is deputed to safety audits or to statistical reports presents the issue again in terms of emergency.

Laws improvement cannot be regarded as the only way to improve the situation, although necessary to fi le down aspects not congruent with operational dynamics. Also because, statistically countries with similar or comparable legislative systems, (e.g. Italy-Sweden), have on the other hand, signifi cant discrepancies on the number of accidents. Marker element that are other parameters to infl uence in terms of risk prevention. Surely these differences are justifi ed for a longer experience of best practices, as well as for having started risk prevention education before being request by European Directives. It’s important to notice that best practice are typical of systems that favor big companies, compared to small ones, traditionally more in diffi culty in the attempt to respect the formalities required by law. In social and anthropological terms, the different way of perceiving risk and need for protection should deserve a specifi c analysis, according to different countries and cultures.

All of these reasons give the sense of the complexity of the issue, but do not help to get out of the impasse of considering the safety as something “in addition”. An extra diffi culty that complicates a sector hits by a devastating crisis that should require more slender procedures than complicated algorithms. The recent Italian law L69/2013 is fortunately a signal toward the safety of “substance”. On the other hand, who does safety audits still complains for quality of safety documents, because their lack of specifi city, make them insuffi cient in order to be effective, helpful in transmission and shared with those who work in construction site.

The general problem is to have a specifi c, relevant, effective assessment which isn’t a hindrance to the construction process. Instances and requirements, by contrast, often disregarded in a practice that sees the moments of the construction and safety of workers at best separated, if not opposite, but almost never concurrent and integrated.

(3)

The hypothesis developed in the approach of this contribution, is to entrust to the design a harmonizing function between the parties. In particular, it refers to the delicate moment in which the Engineering Design becomes Construction Design. The idea is to insert the “safety assessment in construction phase” as useful parameter for project improvement in order to achieve a building quality.

The issue of relationship building-project is another old matter too.

Considering that project is the passage from the moment of foreshadowing of the artifact, its virtual simulation, the defi nition of dimensional features, techniques and technologies, at the time of actual implementation, this means that it is inevitably a solution of continuity. From the private moment of design offi ce, you need to move yourself to the agora of the construction site. There the multitude of the subjects and the correlation between physical and environmental factors, goes to edit a system codifi ed by tools of representation, computation and scheduling of the intervention. In other words, during design phase there is the possibility of managing the control of process with a uniformity that coincides with the designer willingness in a synthesis between intentions and proposal

The issue has been addressed by scholars of Construction Management for a long time, under the name of Constructability. Actually in English exist two similar words: Buildability and Constructability. The two terms are considered by some researchers as synonymous, but according with others there is a different shade of meaning. Buildability, therefore, refers the specifi c relationship between the project and the construction management, while Constructability, refers to the relationship between design and realization in the context of the entire Building Process.

This is a broad area of study in the fi eld of technology of construction involving many researchers, and several Buildability defi nitions have been proposed by researchers and organizations. The widely accepted defi nition is that of the Construction Industry Research and Information Association (CIRIA), which states that “Buildability is the extent to which the design of a building facilitates ease of construction, subject to the overall requirements for the completed building”.

Many research contributions help, underlining various shades of meaning, to complete and clarify the theoretic implications:

- Illingworth (1984) defi nes buildability as the “Design and detailing which recognize the assembly process in achieving the desired result safely and at least cost to the client”.

- This defi nition has been modifi ed by Moore (1996) as a “Design philosophy, which recognizes and addresses the problems of the assembly process in achieving the construction of the design product, both safely and without resort to standardization or project level simplifi cation”.

- Ferguson (1989) refers to the Buildability as the “The ability to construct a building effi ciently, economically and to agreed quality levels from its constituent materials, components and sub-assemblies“.

- Chen.et al., 1991 defi nes buildability as “the extent to which decisions are made during the whole building procurement process, in response to factors infl uencing the project and other project goals, ultimately facilitating the ease of construction and the quality of the completed project”.

- According to Low and Abeyegoonasekera (2001) “Buildability is related to all aspects of a project which enable the optimum utilization of construction resources. It ensures that there is continuity of work by managing labor, plant and equipment in such a manner that the fl ow of materials, components and sub-assemblies into the growing building is maintained and optimized to achieve effi cient and economic production. It is concerned with activities on site and specifi cally with the logical sequence of operations and construction methods”.

It is possible to highlight how all defi nitions of Buildability share three main points : - The function of the project to facilitate the construction.

- The holistic view of the project.

(4)

to give completeness to the building.

In synthesis we can defi ne Buildability as the extent to which the project of a building facilitates the effi cient use of technical resources, improves the ease of construction, construction safety, getting the project triangle (time, cost, quality) while customer requirements are satisfi ed.

In cases where it is not considered to be a synonym of Buildability, Constructability has been defi ned in various ways. The most accepted notion is that developed by the Task Force on Constructability of CII that defi nes it in (1986) as “the optimum use of construction knowledge and experience in planning, design, procurement, and fi eld operations to achieve overall project objectives”.

Another important defi nition has been provided by Construction Industry Institute Australian (CII Australia, 1996) “The integration of construction knowledge in the project delivery process and balancing the various project and environmental constraints to achieve the project goals and building performance at an optimum level”.

Later the same Institute has updated this statement (CIIA, Griffi th and Sidwell, 1997) as “A system for achieving optimum integration of construction knowledge in the building process and balancing the various project and environmental constraints to achieve maximization of project goals and building performance”.

More specifi cally, Lueprasert (1996) defi ned constructability as “An important feature of a structural design and the construction project site conditions, which determines the level of complexity of executing the associated structural assembly tasks”.

The construction Subcommittee of the AASHTO (American Association of State Highway and Transportation Offi cials) defi nes Constructability review as “A process that utilizes construction personnel with extensive construction knowledge early in the design stages of projects to ensure that the projects are buildable, while also being cost-effective, biddable, and maintainable” (Constructability Review Best Practices Guide, 2000).

As mentioned before, the Buildability and Constructability terms are commonly used interchangeably, and many researchers believe that there is no difference between the two concepts, except that Buildability is usually used in the United Kingdom, and Constructability, is often used in the United States.

Anyway, the possible difference of meaning can be so expressed:

- Buildability refers to the extent to which a building project facilitates ease of construction and in the meanwhile are met the client’s requirements. It focuses on the design of a building;

- Constructability, embracing the functions of management and design, covers a broader scope than the buildability. Interacts with project management systems that use optimally the knowledge and experience of the construction to improve the effective attainment of the objectives of the project.

We can express in the simplest way by saying that:

- Buildability is a concept strictly related at the project

- Constructability deals with the design process in a wider sense involving the whole building process

Analyzing the results of British studies in the last fi fty years, it’ possible to summarize the causes of constructability problems in the fragmentation of industrial production (Banwell, 1964), the lack of effectiveness of design because of construction poor knowledge of designers and lack of inputs of contractors. Gray (1983) and Griffi th (1984) suggest to underline the importance of constructive skills of design, by adding contractual constraints aimed to improve Constructability.

In these theories project has a key-function, being considered as a platform to optimize, according to its function, more effectively within the Construction Process.

Talk of “Optimization” is always a perilous fi eld, because should be defi ned parameters and references necessary to assess the actual improvement of the instrument concerned. The safest route is that

(5)

of direct experimentation on the spill-over effect in terms of improving the “easy construct”. The underlying question remains: “on what elements forming the project we can intervene in order to enhance its effectiveness in the construction site?”. The answer, according with research approach here presented, is twofold: the contents and the representation thereof.

The two aspects are of course intimately related: representation is nothing more than a clarifi cation, communication transposition, objective display of content, which in their textual expression may be not clear.

But the representation is much more, as it allows to contextualize the content, especially in terms of requirements and performance, and make them congruent with the specifi c artifact in a technological and geometrical adjustment to the specifi c product to build and to the specifi c environment in which it is inserted.

This consideration of visualization and congruence, has come up with the idea at the basis of this contribution.

The relationship between project and construction sites, such as the theories of Constructability, obviously has already fueled a series of international research strands.

For Griffi th and Sidwell (1995), many problems of inadequate design and production methods are related above all to unclear or missing project information, and general lack of co-ordination between design and construction.

If the graphical representation is not only “passive” image of content, but it is its “ active” check in terms of specifi city and consistency, being mirror and simulation of built result, why not try to improve the contents going backwards to the analysis of representation? And yet, why not accentuate the “dynamism” implied in the project whose representation is usually based on “static” sections of the fi nal result?

Therefore, the operative idea of this approach is to re-elaborate project drawings to clearly express those construction processes implied in the representation of “result”. The representation of the “fi nished”, has a fundamental problem: the graphic perfection, dangerously close to “art work”, although aware of the technological evolution in terms of performance, requires a logical consequence in his design scheme. A construction sequence to demonstrate the effective compliance with the requirements of the construction site in general and the specifi c choice of possible production. Starting from the representation of construction details it is possible to simulate the construction of them. This is possible through progressive drawings that express the breakdown in construction phases, processed chronologically and logically related. In these specifi c drawings are placed graphically those elements of the site (temporary works, machinery and manpower) that allow you to view, and then verify the conditions under which it is assumed it will be the realization of every single element that contributes to the fi nal result express by the accomplished detail.

The procedure allows the specifi c and detailed assessment of safety conditions for the realization of the item in question, and verify the constructability of the element itself. That’s important because this happen before construction stage and at a time when it is still possible to intervene, where appropriate, with amendments, more or less signifi cant on the project itself. Above all this is a moment in which the designer can still have the whole control over project otherwise what happen when is the construction management to impose those changes that end up affecting the formal and technological result, without the possibility of a fi nal assessment of its congruence with initial settings.

In methodological terms, the procedure involves a preliminary choice of the building details (fi g. 1) considered relevant for their diffi culty of realization or their repetitiveness in the entire structure. Every single detail is examined as provided in executive (engineering) design and analyzed according to constructability parameters following a logical pattern like this:

(6)

In terms of graphical representation teaching purposes, but in view of a likely professional application, it’s been used a sheet A3 format with a view to greater handling in the construction site. The sheet is broken down into three main areas (fi g. 3), which can have a graphical composition freely chosen by the compiler, but with a strict sequential logic concatenation according to the diagram:

Figure 1

(7)

1) Graphical representation of construction detail and of the specifi c working phase to be realized. This must be the main part within the table. In terms of communication should immediately be clear what you are referring to and, compared to a traditional detail, it provides a range of information related to construction needs such as the position of operators, the presence of temporary structures, the presence of machinery. To this aim it may be useful to integrate the details with diagrams and maps section to clearly putting them into context within the building, or possibly with photographs in case you are in the presence of a conversion of an existing building. It is essential to draw temporary structures with their real dimension, because this allow to analyze if there is physically and volumetrically an interaction and interference with the building structure under construction. The need of commitment of specifi c workers and machines can be, vice versa, schematized with symbols in the form of dimensionless logo. Graphically it is characterized also by a didactic use of color: “black” for the already built part, “red” for the parts realized just during the analyzed construction phase, “blue” for scaffoldings, “green” for temporary structural support works. The dynamic variation of colors from a table to another expresses the evolution of construction;

2) Description of work phase parsed with the specifi cation of the type of labour and of features, equipment and machinery required. It is complementary to the fi rst part that integrates with explicit information on the specifi c work phase of the construction site;

3) Risks assessment and identifi cation of individual and collective prevention measures. It is the part that shows the data analysis introduced in the fi rst two parts through the graphical presentation. This allows to highlight constructive criticalities both in terms of building procedures and in terms

(8)

of safety of workers, especially related to interactions human-computer, man-man, provisional structure-structure.

It was made an attempt to assimilate this process to some of the safety planning tools required by European legislation in general and by the Italian one in particular. At the beginning of this research the closer it seemed the Safety and Coordination Plan (PSC), and in experimental applications of recent years it has been used the defi nition of graphic-PSC to synthetically express this approach and actually it can be useful to deepen specifi c problematic aspects of this risk assessment document. But trying to fi nd a direct correspondence with an offi cial document requested by law, this can generate confusion on its actual value. It’s more appropriate to consider it as a general Constructability and Safety Assessment design approach, that can be used occasionally to deepen specifi c problem of risk assessment, but above all as a validation procedure of the correspondence of a design to the construction sites requirements.

Talking of further improvements, the most natural development of this “graphic” approach is to fi nd a more structured evolution in BIM strategies, but right now there are still problems to use informatics in an interactive way and not only as CAD tool to improve this design method.

Riferimenti

Documenti correlati

The spaces devoted to the workshops , places of scientific application, are characterized by volumes in transparent crystal where all the equip- ments can be seen and one or more

Idr, the picture Id zoomed by a factor 2 using a simple pixel replication technique; Iar, the picture Ia zoomed by a factor 2 using a simple pixel replication technique; Idb,

Based on the power requirements in Phase 0 and A, only two solar panels were required in order to ensure a positive energy bal- ance, however in order to ensure that a minimum of

The resulting binary images are input into the spline-based algorithm for diameter estimates and the measurements performance against REVIEW is reported in Table 8.. The removal

Finally, with a good agreement with the experimental data, the theoretical model is used to predict optical and electrical behaviour of different hexagonal

(Caranti) Thursday 31 October 2019 (2 hrs) Four lemmata on systems of generators, linearly independent vectors and bases.. Some related exercises: extending a linearly

On one hand, we shall discuss the existence of hyperelliptic curves lying on the Jacobian variety - and a fortiori on the second symmetric product - of a generic curve by extending

By combining a parabolic Almgren type monotonicity formula with blow-up methods, we evaluate the exact behavior near the singularity of solutions to linear and subcritical