in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

BIM-Based H&S Management for

Facilities. Operations & Maintenance of

Logistic Plants

15

Valentina Villa

Alberto Lauria

(2)

159

building maintenance operations that

research is to use the dynamic and intelligent approach based on the

literature there are many papers and

research that deals with both these

who deal with all that is contained in

maintenance phase, which covers the

The idea is to use the possibilities provided by parametric modelling to

to be maintained. The proposed theory is applied to scheduled maintenance

documents, the Building Maintenance

must be linked together. During the

that can be used to choose the most appropriate systems, in order to

workers.

into account, the FM phase generates

purposes, it is estimated that the cost attributed to maintenance activities

total production (Muthu, Devadasan,

higher than the initial investment costs

Maintenance makes an important contribution to the maintenance and

maintenance costs have increased

(3)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

design phase, who prepares the work

protective measures in the building or the measures necessary to carry out

is structured in sheets, which try to

the documents in which the technical

This document is regulated by Article

and protective measures endowed with

on the work, such as ordinary and

as other subsequent interventions

to work. For this reason, a single sheet describing the preventive and protective

because the same lamps may have

building, leaving the operator the burden

and protective measures prescribed by

another document, complementary to

be carried out on each individual

product present in the building, as

be managed and updated throughout disciplines, there is a growing interest

(4)

161

the cars.

above mentioned provincial road. An aerial road conveyor, crossing the

assembly lines in a bilateral sense. All the other connections, both pedestrian and by wheel, were sent back to an underground tunnel.

structure was built, in continuity and combined with the slab line, to house

operating site (near the civil buildings

moulding centre and Magneti Marelli suspension systems remain active at

plant, through the deposit at the local

and F into a logistical warehouse and

the asbestos reclamation and the

technological systems are underway.

(5)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

important document, which contains all

out maintenance and intervention on

in cards, dedicated to each work that

intervention, together with the risks

protective measures regarding access

at a height, it is necessary to provide

allows maintenance operations to be carried out on plant or building objects

account the surrounding area.

relation to the height above the ground

Rivalta. The rules inserted in the model

script.

appropriate thresholds, which will be the most appropriate preparation to be

object in the documents to be printed,

Together with the symbol that represents the most suitable preparation, all the

all the instructions regarding the correct and their placement in the archive

to help the operators who will have

the architectural and static structure in which it will operate and the systems

emergency situations.

used, links to the technical sheets

Director. But above all with the model

you to evaluate the most suitable preparations to intervene ensuring the

(6)

163

by attempts or tests on site.

the navigation inside the model with the augmented reality, it is possible

preparations, chosen in relation to the

This system makes it possible to

as shelves or systems, the planned preparation can not be used and, consequently, other systems must be imagined to allow work at height in

which does not meet the actual needs

(7)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

has a good bibliography in the

place where the operating teams are

in this paper, although embryonic

the workplace. Future developments

(8)

165

. . . . . . . . -. . Benchmarking . -. . .

Riferimenti

Documenti correlati

In order to evaluate the feasibility and potential benefit of such a study design, we developed a method that automatically retrieves relevant data from PubMed abstracts in order

(a) Voltage output from one of the 16 tactile units; (b) result of the algorithm application using a 40 ms window for the ON/OFF signal computation; (c) result of the

In this frame, since the Italian Pharmacovigilance System (Italian Medicines Agency—AIFA) only collects reports for registered drugs, the Italian National Institute of Health

In order to make network configuration and management an automatic task, independent of the specific devices implementing the network, our architecture is composed of three

Second, we conduct a fine-grained discourse analysis of organizational guilt management to arrive at an empirically grounded understanding of guilt-management strategies used

Section 4 describes the problem of identifying filaments from point-process data, showing that the path density is large near filaments and small elsewhere.. We close with some

This paper discusses modularization as a mechanism for improving the flexibility and comprehensibility of a system while allowing the shortening of its development

La domanda che viene spontaneo porsi, atteso che i costi di costruzione di un thesaurus sono notevoli e non sottovalutabili, così come lo sforzo organizzativo correlato, è dunque: