BY NCIfc-based Maintenance Budget
Allocation
some additional attributes may be associated to elements and stored in custom
during new constructions (to prepare the maintenance plan, as required by current
has been employed in order to store has been associated to components belonging to the same building entity maintenance interventions. For that
the current maintenance status has some demonstrations have proved the
possibility to implement this approach
addresses the issues related to the
T
physical characteristics,it is more and hand, the building intended as a physical
physical asset producing and gathering
Figure 2: Research schema
budget allocation and the prioritisation approach has been tested on a case
among project stakeholders(Eastman what concerns the implementation
beginning, FM has been supported by
Maintenance Management Systems
building stocks and their parts into the
has also been promoted through the use
universal approach to the collaborative buildings based on open standards
regarding the asset during its whole
this process to other several activities, during assets operations (e.g. space management, contracting, rent,
maintenance cost (i.e. maintenance
The research is willing to overcome an
be associated to single elements (e.g.
be assigned and maintenance scheduled. how to store maintenance operations to work on these data. The entity used research, connected to the by .
by using in combination with the property set , which allows to save one or more data with a time stamp (
The methodology depicted in the previous paragraph has been validated
above the ground and one underground.
operational phase. All spaces and main
developed and all data concerning maintenance management and implementation have been collected and associated to maintenance operations
each component to be maintained (
synthesis reasons,Figure 5represent the has been used as
The data inserted in the model thanks
on 73 components surveyed. The total shown inFigure 6.
A simulation with a budget constraint,
curve related to the total maintenance interventions to be accomplished to
interventions carried out with the DM
spending peaks.
Thanks to the data inserted in the model
assets comparison.
To conclude, it can be stated that through the research presented in this paper the
the case study showed the possibility
tool or plugin.An algorithm has been developed by the authors, but this has
to be implemented into a management market.Moreover, the methodology allows also to reduce the costs related
51
, R. andAutomation in Construction.
Engineers and Contractors. John Wiley and Sons.
,
, S., , J. A. and
, S. and
, X., , D. and , mathematical models in building simulation.
Automation in Construction , A. K. and Engineering , E. A., , D. J. and Automation in Construction , , F., , S. and , M. , R., , J. and Automation in Construction