Ifc-based Maintenance Budget

Allocation

some additional attributes may be associated to elements and stored in custom

during new constructions (to prepare the maintenance plan, as required by current

(2)

has been employed in order to store has been associated to components belonging to the same building entity maintenance interventions. For that

the current maintenance status has some demonstrations have proved the

possibility to implement this approach

addresses the issues related to the

T

physical characteristics,it is more and hand, the building intended as a physical

physical asset producing and gathering

(3)

Figure 2: Research schema

budget allocation and the prioritisation approach has been tested on a case

among project stakeholders(Eastman what concerns the implementation

beginning, FM has been supported by

Maintenance Management Systems

building stocks and their parts into the

has also been promoted through the use

universal approach to the collaborative buildings based on open standards

regarding the asset during its whole

(4)

this process to other several activities, during assets operations (e.g. space management, contracting, rent,

maintenance cost (i.e. maintenance

The research is willing to overcome an

be associated to single elements (e.g.

be assigned and maintenance scheduled. how to store maintenance operations to work on these data. The entity used research, connected to the by .

by using in combination with the property set , which allows to save one or more data with a time stamp (

The methodology depicted in the previous paragraph has been validated

above the ground and one underground.

operational phase. All spaces and main

developed and all data concerning maintenance management and implementation have been collected and associated to maintenance operations

each component to be maintained (

synthesis reasons,Figure 5represent the has been used as

(5)

The data inserted in the model thanks

on 73 components surveyed. The total shown inFigure 6.

A simulation with a budget constraint,

curve related to the total maintenance interventions to be accomplished to

(6)

interventions carried out with the DM

spending peaks.

Thanks to the data inserted in the model

assets comparison.

To conclude, it can be stated that through the research presented in this paper the

the case study showed the possibility

tool or plugin.An algorithm has been developed by the authors, but this has

(7)

to be implemented into a management market.Moreover, the methodology allows also to reduce the costs related

(8)

51

, R. and

Automation in Construction.

Engineers and Contractors. John Wiley and Sons.

,

, S., , J. A. and

, S. and

, X., , D. and , mathematical models in building simulation.

Automation in Construction , A. K. and Engineering , E. A., , D. J. and Automation in Construction , , F., , S. and , M. , R., , J. and Automation in Construction

Figura

Figure 2: Research schema

Riferimenti

Documenti correlati

With hunting problems during the converter working, rotate the trim “DUMPING” (see fig.1) clockwise slowly to obtain the signal stability. Altrimenti effettuare mensilmente il

Qualsiasi tipo di pulizia, eccezion fatta quella del gruppo erogatore e della lancia vapore, deve essere eseguita a macchina spenta (interruttore di alimentazione su zero) e dopo

Una volta ultimato il ciclo di sanificazione è possibile stampare il report di sanificazione, cliccando sul tasto PDF dalla schermata principale. Dopo aver cliccato sul tasto

It is possible to decide which individual components to switch on: left coffee group and/or right coffee group using the relative switches (ref. E) after selecting position 1 of

Connect the supply pipe and dispense many liters of water from the 3 ways in order to clean the system from any trace of sanitizing.. Reassemble the membranes in

Una volta terminate le operazioni preliminari il dispositivo avviserà l’utente di collegare il raccordo di bassa pressione opportuno (R134 oppure HFO1234yf) sulla vettura o

Qualsiasi tipo di pulizia, eccezion fatta quella del gruppo erogatore, deve essere eseguita a macchina spenta (interruttore di alimentazione su zero) e dopo che la macchina si

Prima di selezionare il tipo di impianto assicurarsi che i due raccordi rapidi di alta e bassa pressione presenti alle estremità dei tubi siano collegati ai due raccordi