• Non ci sono risultati.

[4] www.statnett.no/Files/Open/Nordelkart2000.pdf

N/A
N/A
Protected

Academic year: 2021

Condividi "[4] www.statnett.no/Files/Open/Nordelkart2000.pdf "

Copied!
4
0
0

Testo completo

(1)

Bibliografia.

[1] CER – Electricity Tariff Structure Review : international Comparisons – An Information Paper, 9 March 2004

[2] CIGRE Task Force 38.05.15 – Transmission Pricing in the restructured and Restructuring Electricity Markets – Final Draft, September 2003

[3] www.nordpool.no/

[4] www.statnett.no/Files/Open/Nordelkart2000.pdf

[5] ODIN – Information from the Government and the Ministries: The transmission grid – 2004 – disponibile in: odin.dep.no/filarkiv/224535/kap6-10_vassdrag04_ eng.pdf

[6] NVE – Norwegian water Resources and Energy Administration – Incentive-based regulation of electicity monopolies in Norway – background, principles and directives, implementation and control system –

[7] NVE – Regulation concerning financial and technical reporting, permitted income for network operations and transmission tariffs – Reg. No. 302 of 11 March 1999

[8] NVE – Financial and technical reporting – disponibile in www.nve.no/modules/module_109/publisher_view_product.asp?iEntityId=3646

[9] Vasilis Sarafidis – An Assessment of Comparative Efficiency Measurement Tecniques – October 2002

[10]Cosma Campidoglio – Tariffe di trasmissione e di vettoriamento e mercato dell’elettricità – Istituto per la ricerca sociale IRS, Osservatorio Energia, Quaderni n°1, Giugno 1999

[11]Svenska Kraftnät – The Swedish Electricity Market snd the Role of Svenska Kraftnät – November 2004

[12]Universidad Pontificia Comillas (Madrid) – Benchmark of electricity transmission tariffs – Prepared for the DG TREN, European Commission, February 2002

111

(2)

[13]Statnett – Market – based Power Reserves Acquirement – Conference on: Methods to Secure Peak Load Capacity in deregulated Electricity Market – 7 – 8 June, 2001 Stockholm

[14]P. J. Agrell, P. Bogetoft and J. Tind – Multi Period DEA Incentive Regulation in Electricity Distribution – September 2000

[15]Università di Roma - Introduzione alla D.E.A. – Disponibile in www.dis.uniroma1.it/~bruni/files/AMPL

dea .pdf

[16]ETSO task force – Benchmarking of transmission pricing in Europe: synthesis 2003 – July 2004 – www.etso-net.org

[17]Engineering and Technology Management – DEA: Data Envelopment Analysis – Version D1.1, January 27,1996. disponibile in www.emp.pdx.edu/dea/ wvedea.html

[18]National Grid – The Statement of the Use of System Charging Methodology – effective from 1 April 2005, Issue 1, Revision 1 – www.nationalgridinfo.co.uk

[19]National Grid – The Statement of the Connection Charging Methodology – effective from 1 April 2005, Issue 1, Revision 0 – www.nationalgridinfo.co.uk

[20]National Grid – A Summary of the Connection and Use of System Code – www.nationalgridinfo.co.uk

[21]Michael Pollitt – The Future of RPI-X/CPI-X Regulation in Europe – disponibile in www.econ.cam.ac.uk/electricity/people/pollitt/index.htm

[22]E.I.A.Energy Information Administration– Electricity Restructuring and Privatization in the United Kingdom – disponibile in www.eia.doe.gov/emeu/pgem/electric/ch2.h tml

[23]National Grid – The Statement of the Use of System Charges – effective from 1 April 2005, Issue 1, Revision 0 – www.nationalgridinfo.co.uk

[24]OFGEM – The Structure of Electricity Distribution Charges – Initial Consultation Paper, December 2000

112

(3)

[25]OFGEM – Structure of Electricity Distribution Charges – Update Document, October 2002

[26]P. Williams, S. Andrews – Distribution Network Connection: Charging Principles and Option – Report Number: K/EL/00283/REP, 2002

[27]OFGEM – Structure of Electricity Distribution Charges – Initial Decision Document, November 2003

[28]OFGEM – Structure of Electricity Distribution Charges – Update document and Licence Modification, April 2004

[29]T.Jamasb, K. Neuhoff, D.Newbery, M. Pollitt – Long – Term Framework foElectricity Distribution Acces Charges – 16 March 2005

[30]www.nationalgrid.com/uk/Electricity/AboutElectricity/DistributionCompanies/

[31]PJM – Open Access Transmission Tarif Accounting – Revision: 48, Effective Date:

November 01, 2005

[32]PJM – Open Access Transmission Tariff – Sixth Revised Volume No1, Effective: January 26, 2005

[33]Australian Energy Market Commission – The National Electricity Rule – disponibile in www.aemc.gov.au/rules.php

[34]AER Australian Energy Regulator – Post Tax Revenue Model Electricity Module Handbook – August 2005 disponibile in www.aer.gov.au/content/

index.phtml/itemId/688824/fromItemId/659971

[35]AER – Post Tax Revenue Model Electricity Module – foglio di calcolo excel disponibile in www.aer.gov.au/content/index.phtml/itemId/688824/fromItemId/ 659971

[36]AER – Statement of principles for the regulation of electricity transmission revenue – Decision. Date 8 December 2004

[37]C. Crampes, N.Fabra – The Spanish Electricity Industry – Abstract, October 1, 2004

113

(4)

[38]M. Velasco – Southeast Europe Regional Workshop on Developing Unbundled Transmission Tariffs. Western European Case Study: Spain – Zagreb, may, 28th 2003 [39]G. Calvo – The Spanish Electricity Market: Impact of the Tariff Design – November 2002

[40]Commission Nacional de Energia – real decreto 1164/2001, de 26 de octubre, por el que se establecen tarifas de acceso a las rdes de transporte y ditribucion de energia electrica – disponibile in www.cne.es/cne/doc/legislacion/(31)RD1164_ 2001.pdf

[41]Commission Nacional de Energia – The Iberian Electricity Market : Organisational Model – March 2002

[42]National Statistic Ondine www.statistics.gov.uk/cci/nugget.asp?id=19

[43]E.I.A. – Electricity Reform Abroad and U.S. Investment. Reform in Price Regulation – disponibile in www.eia.doe.gov/emeu/pgem/electric/ch3l5.html

[44]G. Migliavacca, M. Benini – I segnali locazionali a breve e medio-lungo termine nei mercati elettrici nazionali e multinazionali - rapporto CESI RdS A4524968, Dicembre 2004

114

Riferimenti

Documenti correlati

The test case considered for this validation is the flow past a circular cylinder at M ∞ = 0.1 and Re D = 3900 the numerical results obtain on the coarse grid show an overall

access-guidelines.eu http://www.aoa.gov/abuse/report/..

If X does not receive any NA message, but its neighbors reply with their cache information stating that the address is present in their neighborhood, then the X concludes that

A livello fisico invece i bandha, una volta attivati efficacemente a livello muscolare, ovvero una volta che se ne è risvegliata efficacemente la percezione e che se ne è

Eppure – fermo restando il loro diritto alla più totale autonomia creativa, ma anche senza dimenticare il loro dovere di farsi carico delle responsabilità che il dono della

si tratta però di situazioni sporadiche: se non vi è una interazione particolare (come nel caso della votazione o delle domande dell’investigatore), la domanda si accompagna a

realizzato la Grid denominata INFN-GRID che collegherà le risorse di calcolo e di memoria disponibili nelle sue sedi, per poi partecipare allo sviluppo della prima Grid mondiale

Despite high-frequency harmonics, the voltage characteristics provide evidence the proposed Smart Grid system ensures power supply in «Kedrovskiy» power distribution network at