A FEW MINUTES TO INTRODUCE OUR COMPANY
Rotary Meeting | Università di Palermo 26/01/2018
LOCATIONS
EUROPE
ADVANCE
WAREHOUSE CRESPIN (FR) SITE (service
provider) 1
HEADQUARTER PALERMO
PLANT 3
COVERED AREA 10.147 mq
TOTAL AREA 24.300 mq
LOCATION
USA
LOCATIONS
SUBSIDARY DETROIT
PLANT 1
COVERED AREA 1.200 sq.mt
OMER NORTH AMERICA CORP.
COMPANY DEVELOPMENT
Founded in 1990 as an aluminum bus component builder;
In 1993 O.ME.R started to work in the railway market;
The company progressively specialized in interiors and doors for railway vehicles;
YEAR O.ME.R.
2012 14.063 k€
2013 11.063 k€
2014 18.253 K€
2015 25.248 K€
2016 32.447 k€
O.ME.R. TURN OVER
YEAR O.ME.R.
2012 93
2013 132
2014 132
2015 187
2016 198
O.ME.R. NUMBER OF EMPLOYEES
COMPANY
MAIN INTERNATIONAL CUSTOMERS
Since 2006 OMER is also working together with some of the most important Constructors , Coach Builders and Rail Operators all over the world.
CUSTOMERS
O.ME.R. has got the following certifications :
UNI EN ISO 14001:2004 Environmental Certification
ISO 3834-2:2006 Welding Quality System EN 15085-2 WELDING QUALITY
[CL1]
UNI EN ISO 9001: 2008 QUALITY SYSTEM DIN 6701-2 QUALITY
BONDING RAILWAY SYSTEM
IRIS CERTIFICATION [March 2013]
CERTIFICATIONS
S T R E N G H T S O F O . M E . R S Y S T E M
MANAGEMENT INTEGRATED SOFTWARE
CAD CAM INTEGRATED SYSTEM
MODERN PRODUCTION MACHINERY
INFRASTRUCTURES
O.ME.R’S WAY
Technical Meeting and Starting Design:
•Engineering master definition
•Technical documentation data input analisys
•Engineering master Creation
•Engineering 3D cad models
Technical Meeting and Starting Design:
•Engineering master definition
•Technical documentation data input analisys
•Engineering master Creation
•Engineering 3D cad models
Prototyping :
•Construction of a prototype
•Internal validation of the prototype tools and moulds
• Customer First Article Inspection Prototyping :
•Construction of a prototype
•Internal validation of the prototype tools and moulds
• Customer First Article Inspection
Production:
•Production scheduling and management
•Manufacturing process Production:
•Production scheduling and management
•Manufacturing process
Logistic :
•Packaging
• Transport organization Logistic :
•Packaging
• Transport organization Kick-off Meeting:
•Definition of responsabilities
•Individuation of an internal Project Manager
• Individuation of an internal Project Engineer Kick-off Meeting:
•Definition of responsabilities
•Individuation of an internal Project Manager
• Individuation of an internal Project Engineer
Starting Project:
•Customer order approval cycle
•Data entry in SAP Starting Project:
•Customer order approval cycle
•Data entry in SAP
THE WORK FLOW:
O.ME.R’S WAYSERVICE TO CLIENT
O.ME.R’S WAYDATA INPUT ANALYSIS
DATA INPUT ANALYSIS THE CONCEPTTHE CONCEPT
RENDERING RENDERING 3D PROJECT
3D PROJECT
SERVICE TO CLIENT
O.ME.R’S WAYTHE PRODUCT THE PRODUCT
SERVICE SERVICE
THE PRODUCTION CYCLE FLEXIBILITY
FIVE STEPS from raw material TO MARKET.
TIG Welding, MIG robot welding and
gluing Bending and
moulding
Powder and liquid painting, continuosly
online monitored parameters
1 2 3 4 5
MARKET
Base Manufacturing Cold Forming Welding Painting Assembling
Accessories assembling and packaging Laser and CNC
mill cutting
O.ME.R’S WAY
THE LOGISTIC SERVICE
The packaging project and the use of specialized forewarders guarantee that the products arrive to destination on time and in optimal conditions.
Engineering Manufacturing Delivery
O.ME.R’S WAY
HUMAN RESOURCE POLICY
>> The constant research for specialized human resources.
>>
The cooperation with University of Palermo for new human resources selection.
>> Periodical training courses organized by
the company to increase the staff acknowledgement and skillness.
WE MOVE IN EXCELLENCE
OMER’S WAY