The PROCESS SYSTEMS ENGINEERING JOURNAL

N/A
N/A
Protected

Academic year: 2021

Condividi "The PROCESS SYSTEMS ENGINEERING JOURNAL"

Copied!
1
0
0

Testo completo

(1)

A FINANCIAL ANALYSIS OF THE CONDUCTION OF THE HDA PLANTS – PART 1 Our team of experts performed a financial analysis of the cash flows of the HDA plants.

A chemical plant has many operative expenses. Insiders at Politecnico informed us that each plant consumes about 58.6 kW in electricity (at 55.56 €/GJ) and requires hot steam (at 12.57 €/GJ) and cold water (at 1.58 €/GJ) to exchange 2179 kW and 3189 kW.

Hydrogen -10861 €/w Electricity -1969 €/w Cold water -3047 €/w Steam -16559 €/w Heat ++24636 €/w Furnace -9741 €/w Overhead -2000 €/w SUBTOTAL -19541 €/w For a week of full production, the plant also consumes 5172 kmoles of hydrogen (at 2.1

€/kmol) and produces 3461 GJ of heat (at 8.25 €/GJ) burning two process streams in a furnace, which costs 58 €/h.

This provides the heat needed at the furnace (474 GJ) and the excess heat is sold at 8.25 €/GJ.

The overhead expenses are fixed and amount to 2000 €.

The financial analysis will continue in the next issue.

PSE-Lab - CMIC Department - Politecnico di Milano

FINANCE

Average weekly figures:

29/10-4/11 week

Crude oil1 49.60 (-50.9%) Benzene1 137.39 (-14.3%) Toluene1 95.16 (-39.4%) Propylene2 917.39 (-6.3%) Diphenyl2 691.79 (-1.3%)

5/11-11/11 week Forecasts by OPEC:

Crude oil1 97.33 (+96.2%) We apologize for the inconvenience but the forecasts for the other commodities are unavailable this week (1) EUR per bbl (159 L) (2) EUR per metric ton

The PROCESS SYSTEMS ENGINEERING JOURNAL

POLITECNICO ENCOUNTERS UNEXPECTED ISSUES WITH PRODUCTION

According to internal sources, a serious issue with the compressor, which would require the plants to stop periodically for extraordinary maintenance, was identified in the construction of all the new HDA plants built by Politecnico di Milano.

Luckily, a solution was quickly found – the repair needed is of small entity, the major downside being that it requires halting production for a few days. The repair is offered as an option to the teams, who will have to assess the convenience of this investment over their evaluation period.

N. 6 – November 5, 2018

ADVERTISEMENT

Blockchain World Ledger One Consulting (BWL1 Consulting) is the world leader in consultancy about blockchain technologies.

Following the success of Bitcoin, we are looking for innovative companies interested in partnerships to explore the disruptive potential of the blockchain.

The blockchain represents a revolution of the concept of transactions, as it introduces an open, distributed ledger that records the history of transactions in a verifiable and permanent way.

We expect every industry to be transformed by the blockchain. Don’t miss this opportunity: make sure your company is the first in your field to be empowered by our technology.

SPONSORED CONTENT – Politecnico di Milano

To all the teams: don’t miss the official meeting with the Board of Politecnico.

To confirm your presence and manage your plant, visit tiny.cc/pse18w6 http://pselab.chem.polimi.it/pse-game-2018/

Riferimenti

Documenti correlati

Therefore, despite the impressive construction, it appears likely that the market of the commodities will not be significantly affected in the long term.. 4 – October

Politecnico di Milano has granted the PSE Journal direct access to the performance of the plants and their connected financial accounts.. This will allow us to

To confirm your attendance and manage your cockpit, visit tiny.cc/pse18w7 The best performing teams have had a really impressive performance, clearly demonstrating not only their

A FINANCIAL ANALYSIS OF THE CONDUCTION OF THE HDA PLANTS – PART 3 We conclude our financial analysis of the HDA plants by performing an analysis of the cash flows in

THE HDA AUTOPILOT – WHAT IS KNOWN SO FAR The Autopilot, a technology presented two weeks ago by Politecnico di Milano, appears to be an almost revolutionary

The editorial team of the Journal is impressed by the incredible overall performance of the contracted teams, which successfully dealt with production issues, formal

Therefore, despite the impressive construction, it appears likely that the market of the commodities will not be significantly affected in the long term.. 4 – October

Politecnico di Milano has granted the PSE Journal direct access to the performance of the plants and their connected financial accounts.. This will allow us to