-4 and -3 BASEMENT PLANS OF THE NICOSIA CENTRAL STATION
Drawing
04
CypRail: Revitalisation and Retransmission of the Cyprus Railways
POLITECNICO DI MILANO
SCUOLA DI ARCHITETTURA E SOCIETA'
LAUREA MAGISTRALE IN ARCHITETTURA | Master of Science in Architecture
Scale: 1/500
C
B
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Za Zb Zc Zd Ze 1 2 3 4 5 6 7 8 9 12 13 14 15 18 19 20 21 24 25 26 27 28 29 10 11 16 17 22 23 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Za Zb Zc Zd Ze 1 2 3 4 5 6 7 8 9 12 13 14 15 18 19 20 21 24 25 26 27 28 29 10 11 16 17 22 23D
C
D
A
B
A
C
B
A Ze 1 29 A Ze 1 29D
C
D
A
B
A
-4 BASEMENT PLAN
-3 BASEMENT PLAN
Gross Area: 2,570 m²
Gross Area: 8,540 m²
1a 2b 2a 3 3 8 8 9 6 4 4 5 1a 1b 2a 2b 3 4 5 6 7 8 9 10 12
Platform for the Copper Line through Famagusta (260 m²)
Platform for the Copper Line through Lefka (260 m²)
Rails for the Copper Line through Famagusta Rails for the Copper Line through Lefka Plumbing Conduit
Controlled Staircase and Elevator Hall Service Area for the Train (732 m²)
Automatic Ticket Gateline (ATG) for the Marine Line (254 m²)
Access Point for the Marine Gateline Passages for the Marine Line Platform
Light and Air Shaft for the Marine Line Platform
10 11 11 12 13 13 13
Vehicle Ramp for Staff and Residence Owners’ Parking Mechanical Room | Jenerator (229 m²)
Staff Parking Area (2,486 m²)
Staff Controlled Entrance (279 m²)
1a 2b 2a 3 5 5 1a 1b 2a 2b 3 4 5 6
Platform for the Marine Line | Run-off (288 m²)
Platform for the Marine Line | Run-on (288 m²)
Rails for the Marine Line from Larnaca Rails for the Marine Line through Larnaca Plumbing Conduit
Controlled Staircase and Elevator Service Area for the Train (853 m²)
Train Garage 1b 1b 4 4 6 6 4 15260 15260 15260 15260 15260 15260 15260 15260 5 -18,55 -18,55 -10,50 -12,10 -12,10 -12,25 -12,25 -12,25 -10,50 -20,15 -20,15 Relatore | Supervisor:
Luca Maria Francesco FABRIS
Laureando | Student: