PRACTICE IS ALWAYS THE BEST WAY TO
START THE
TRANSFORMATION
The BIM design method increases and significantly improves the collaboration between designers and contractors. Active communication between all parties involved - architects, engineers, general contractors, public administration and facility managers - becomes an essential building block and sharing throughout the entire process.
LTT.SRL is an engineering company specialized in integrated design in BIM.
BUILDING INFORMATION MODELING AS AN
INTERACTIVE SET OF PROCESSES, TECHNOLOGIES, PEOPLE AND RULES
The set of these macro-environments is the methodology to manage in an integrated, digital and automated way the entire life cycle of the works and all the information data
associated with it.
PLAN, DESIGN, BUILD MORE EFFICIENTLY
Scan to BIM
Laser scanning for high accuracy 3D BIM models for redevelopment, renovation and refurbishment projects
BIM Design
Integrated design through the realization of multidisciplinary models for linear and punctual works.
Construction 4.0
Have a coordinated BIM model, useful for the realization of the work in the digital
transformation process of the yard.
Integrated design services
BIM for public administration
Support to the R.U.P. art.31 paragraph 11 of
Legislative Decree 50/2016 in order to comply with the obligatory requirements of the BIM Decree (DM 560/2017).
Standards BIM
The definition of the rules and elements
(guidelines, objects, templates) with which to base a BIM project.
Facility Management
More efficient property management and maintenance processes with better economic planning.
SCAN TO BIM
Use laser scanning to create accurate and precise 3D models for surveying, renovation and urban renewal
FROM REAL BUILT TO VIRTUAL DIGITAL TWIN
All professionals in the construction industry immediately benefit from the 3D laser scanning methodology:
● architects,
● engineers,
● construction supervisors,
● contractors.
In a Scan to BIM process, a laser scanner is used to acquire a 3D scan that is perfectly superimposable on the real building. The scan data is then
imported into a Building Information Modeling environment returning the digital twin of the building. In other words, an integrated BIM model.
The result of the Laser Scanner survey returns a cluster of millions of points in a 3-dimensional space.
The point cloud thus obtained can then be managed in the BIM modeling phase in order to produce a digital model of the existing one, which can also be evaluated in a virtual reality
environment.
BIM DESIGN
Integrated design through the realization of
multidisciplinary BIM models for linear and punctual works
One of the main parameters for defining the success or failure of a BIM process is the evaluation of geometrically complex and information-intensive models.
In the design of linear works or infrastructures, multidisciplinary BIM modeling allows first of all to define variables, thus planning the organization of information.
In the case of specific works such as vertically developed products, on the other hand, a concrete green economy action becomes possible by optimizing all the elements that make up the entire design process.
Finally, the quality of the project is also
determined by the degree of collaboration and coordination of the entire BIM model.
THE QUALITY OF THE BIM MODEL
CONSTRUCTION 4.0
A coordinated BIM model, useful for the construction of the work in the digital transformation process of the
construction site
In the digitization of the building sector, BIM allows to plan, through simulations, the
reproduction of the construction process over time.
It is therefore possible to design variable site scenarios according to the needs, plan construction sequences, carry out assembly simulations and identify in advance any
interference between systems and processes.
Carry out a simulation of the construction site in order to study in advance the organization of the works, the work teams and the timing for supplies, solving conflicts and avoiding feasibility problems.
In order to identify interferences between systems and processes as well as supply conflicts in advance and to ensure greater security, BIM is used in a Building 4.0 project:
● work schedules, tasks and resources for project management;
● Gantt diagrams of works and supplies;
● punctual simulations of the entire construction and assembly process.
DESIGN VARIABLE SITE SCENARIOS
BIM FOR PUBLIC ADMINISTRATION
Support to the R.U.P. in order to comply with the
mandatory requirements of the BIM decree (D.m. 560/2017)
ADVICE ON
REQUIREMENTS AND VERIFICATION
STANDARDS IN THE P.
A.
The verification of the Building Information Modeling based on the requirements of the Information Specifications and the main national and international standards is carried out through the comparison with the Public Administration (typically the Single Person in charge of the Procedure or R.U.P.) and the companies, so that the prescriptions are implemented verifying that the BIM model responds in a timely manner to the
The services of Support to the R.U.P. on the basis of the obligations to the P.A. sanctioned by the Ministerial Decree 560/2017, provide that in the Building Information Modeling projects, among the necessary fulfilments (art. 3) are included:
● a staff training plan;
● a plan to acquire hardware and software tools;
● an organisational act "which explains the control and management process, data managers and conflict management";
● the Information Specifications (C.I.);
● the Shared Working Environment (CDE).
STANDARDS BIM
Definition of rules and design elements (guidelines, objects, templates) in the BIM area
RULES AND DESIGN ELEMENTS
In order to best apply Building Information Modeling, optimize the workflow and ensure the correct management and exchange of
information, it is necessary to define common standards for the different work teams.
A highly customized implementation process tailored to the needs of the client.
We develop detailed manuals and draft guidelines for BIM:
● Asset Information Model (AIM).
● Employer Information Requirements (EIR).
● BIM Execution Plans (BEP).
● Project Information Model (PIM).
● BIM Guides.
FACILITY MANAGEMENT
For property management, the BIM process creates efficiency in maintenance and investment planning.
The Building Information Modeling design method at the service of Facility Management:
● building services: scheduled and predictive maintenance, energy audit;
● space services: what is contained in the
"box" such as workstations, instruments, furniture and any other useful
components;
● personal services: environmental hygiene services, security services, catering, etc.
The BIM method makes it possible to coordinate development strategies, economic and financial planning, management of real estate
instrumental to the company and the services underlying the business.
The information in the BIM model can be used for a management system for ordinary and
extraordinary maintenance and emergency management.
For this purpose you can proceed with the return of the existing one through a BIM model in which there are all the elements to be maintained and planned for the management of the entire work.
At the end of this process, there will be a
multidisciplinary model (Architecture, Structure, Installations) of the navigable and questionable state on which to base, manage and plan all the operations and maintenance of buildings during their operational life cycle.
OPTIMIZE, PLAN, MANAGE REAL ESTATE