• Non ci sono risultati.

Progettazione di un Electronic Manufacturing Network in Cina

N/A
N/A
Protected

Academic year: 2021

Condividi "Progettazione di un Electronic Manufacturing Network in Cina"

Copied!
2
0
0

Testo completo

(1)

 

 

 

 

 

 

F

ACOLTÀ  DI  

I

NGEGNERIA

 

 

RELAZIONE  PER  IL  CONSEGUIMENTO  DELLA

 

LAUREA  SPECIALISTICA  IN  INGEGNERIA  GESTIONALE

 

 

 

 

Progettazione  di  un  Electronic  Manufacturing  

Network  in  Cina  

 

 

 

 

 

SINTESI  

 

 

 

 

 

RELATORI   IL  CANDIDATO  

 

Prof.  Ing.  Valeria  Mininno   Elena  Addis          

Dipartimento  di  Ingegneria  dell’Energia  e  dei  Sistemi  

   

Dott.Ing.  Donato  Vairo  

Meta  System  Electronics  (Shenzhen)  Co.,Ltd  

   

 

 

 

Sessione  di  Laurea  del  22/02/2012   Anno  Accademico  2010/2011  

(2)

1    

Progettazione  di  un  Electronic  Manufacturing  Network  in  Cina  

Elena  Addis   Sommario  

La   seguente   tesi   è   il   risultato   dell’esperienza   realizzata   nello   stabilimento   cinese   di   Meta   System  Electronics  (Shenzhen)  Co.,Ltd.  e  tratta  le  analisi  preliminari  per  la  progettazione  di   un   Electronic   Manufacturing   Service   (EMS).   Nella   prima   parte   del   progetto   sono   stati   individuati   i   criteri   utilizzati   dalle   aziende   per   la   scelta   dei   loro   fornitori   EMS.   La   ricerca,   focalizzata   sulle   problematiche   lavorative   esistenti   tra   aziende   europee   e   cinesi,   è   stata   condotta   attraverso   un   questionario   sottoposto   ad   aziende   selezionate   così   come   intervistando   manager   occidentali   e   cinesi   e   visitando   alcuni   stabilimenti   produttivi   nella   provincia   del   Guangdong.   Tale   ricerca   ha   permesso   di   identificare   i   fattori   critici   per   un   inserimento   proficuo   di   Meta   System   nel   panorama   EMS   cinese,   di   valutare   l’importanza   attribuita   dalle   aziende   europee   ad   un   management   straniero   piuttosto   che   locale   e   di   assistere  alle  prime  fasi  di  negoziazione  tra  Meta  System  ed  un’azienda  tedesca  intervistata  e     che  si  è  dimostrata  interessata  al  business  di  Meta  System.  Come  suggerito  dai  risultati  della   ricerca,   l’analisi   si   è   concentrata,   poi,   sulla   progettazione   di   un   reparto   per   l’assemblaggio   SMD   (Surface   Mounting   Device)   nello   stabilimento.   La   produzione   interna   di   SMD   risulta,   infatti,  essere  un  requisito  fondamentale  per  i  potenziali  clienti  intervistati  ma,  attualmente,   Meta  System  affida  questa  lavorazione  ad  un  fornitore  esterno.  L’allestimento  del  reparto   permetterà  all’azienda  di  ottenere  un  risparmio  economico,  come  dimostrato  con  un’analisi   make  or  buy,  ma  anche  di  essere  più  competitiva  ed  attrattiva  nel  mercato  cinese  EMS.     Abstract  

This  dissertation  is  about  the  work  and  the  experience  carried  out  within  the  Chinese  plant   of   Meta   System   Electronics   (Shenzhen)   Co.,Ltd.   The   aim   of   the   project   is   to   design   an   Electronic  Manufacturing  Service  (EMS).  The  first  step  of  the  project  deals  with  companies’   criteria  when  choosing  their  suppliers.  The  research,  focused  on  the  working  issues  between   European   and   Chinese   companies,   is   carried   out   by   submitting   a   survey   to   some   selected   European   companies   as   well   as   interviewing   managers   and   visiting   facilities   in   Guangdong   province.   The   results   are   the   identification   of   the   critical   factors   that   would   allow   a   successful   integration   of   Meta   System   within   the   Chinese   EMS   situation,   the   added   value   assigned  to  a  foreigner  management  rather  than  a  local  one  and  the  chance  to  assist  to  the   first  phases  for  the  negotiation  of  a  supply  relationship  between  Meta  System  and  one  of  the   interviewed   German   companies.   As   the   research   suggests,   the   second   phase   is   a   make   or   buy  analysis,  which  demonstrates  the  saving  that  Meta  System  would  have  if  manufacturing   SMD  inside  its  plant.  For  Meta  System  this  would  mean  being  more  competitive  and  more   attractive  on  the  Chinese  EMS  market.  

Riferimenti

Documenti correlati

SOLUZIONE DEL PROGETTO ER IN FORMATO TESTUALE IN FORMATO TESTUALE (COME RICHIESTO PER ESAME ONLINE BASI DI DATI A.A.. di TRIBUNALE

Il questionario prende come riferimento nella costruzione di parte dei suoi item la scala HoNOS (Health of the NationOutcome- Scales) utilizzata per la valutazione della gravità

Mauro Turturici – Electronic Goalkeeper: studio e progettazione di un ausilio al gioco del Calcio per persone diversamente

Compared with any other high technology products made from high performance ceramics, ceramic ball heads and cup Inserts for use in hip joint replacement demonstrate best of all that

Mauro Turturici – Electronic Goalkeeper: studio e progettazione di un ausilio al gioco del Calcio per persone diversamente

Dipartimento di epidemiologia della Regione Lazio hanno avviato il progetto Forward al fi ne di rifl ettere e approfondire non tanto ciò che è attuale oggi, ma quello che lo diventerà

I processi di atomizzazione consistono nel separare il metallo liquido in tante piccole gocce che, raffreddandosi, ri-solidificano a velocità molto elevate (102-107 K/s);

DIPARTIMENTO DI PROCESSI CHIMICI DELL’INGEGNERIA CORSO DI LAUREA MAGISTRALE IN INGEGNERIA DEI MATERIALI. TESI