RE1/2 and RE1/3
Gap Status & QC - 2005 CMS week March 2005
Piritta Kaarlola
Gap QC
Gap QC consists of HV, Spacer and Gas Leakage test
HV test
Applied HV values: 2000, 4000, 6000, 8000, 8500, 9000 & 9100
Resulted currents must stay within the range from 0.50 µA to 3.00 µA
Spacer test
Gas input and output are connected with 20 mbar overpressure
Allowed change: ± 0.5 mbar
Gas Leakage test
Gas input and output are connected with 20 mbar overpressure
Allowed gas leakage: max. -0.5 mbar
Another QC issue: bent gaps
Allowed bending <10mm For the moment used for spares
RE1/2 Gap status
Chambers
None ready – Production not yet started
60 needed (180 gaps)
Gaps
Current holdings
Small: 18
Medium: 13
Big: -
Still needed
Small: 42
Medium: 47
Big: 60
RE1/3 Gap status
Chambers
13 ready chambers (39 gaps)
47 needed chambers (141 gaps)
Gaps
Current holdings
Small: 9
Medium: 7
Big: 2
Still needed
Small: 38
Medium: 40