2005 Milestones
Production
18 RE1/2 and 18 RE1/3 Installation April end 60 RE1/2 & 60 RE1/3
Installation October-November Cosmic Tests / Magnet Test Preparation
April 05 Sep 05
RE- 1048
HALF: RE1/2 + and RE1/3 ready for installation RE-
1049 RE2, 3 installed on YE+
Schedule V34.1
2004 Milestones
3 RE1/2 & 1 RE1/3 pre production chambers tested
Korean gaps deliveries ISR Assembly Lab on
schedule
CSC+RPC+LB Beam Tests Cosmic QC 20 RE1/2 +10
RE1/3
On behalf of On behalf of
Peking University Colleagues Peking University Colleagues
And all at ISR And all at ISR
RE1/2 Completed chambers RE1/2 Completed chambers
ready for quality control ready for quality control tests in the cosmic stand tests in the cosmic stand
Cosmic stand and DAQ Cosmic stand and DAQ
Dec. 2004
HV connector HV connector
Last step Last step
AS
Ch am be rs Ch am be rs
36 needed @ X5 36 needed @ X5
April 2005 April 2005
Constructed Constructed Planned
Planned
Production Status:
Production Status: 20 RE1/2 + 30 RE1/3 Assembled
Preparation
gas pipes – 120 chambers Cables – 60 chambers
Mechanics ..
Cover closing Alu plates Chamber production rate Expected 5 per week
March 20 RE1/2
mass production re-launch GOAL: June RE1/2 complete
April end RE1/3 Gaps expected
mass production re-launch GOAL: Sept 30 RE1/2 complete
GOAL: Dec 05 All certified!
Database developed to store RPC production information Database developed to store RPC production information
http://forwardrpc/cms_forward_rpc/production_db/Main_db.htm
http://forwardrpc/cms_forward_rpc/production_db/Main_db.htm
AS
Create plots from Create plots from
cosmic test data cosmic test data
Strip Strip response response
profile
profile
Cosmic QC
See Andrey’s talk
Noise < 10Hz/cm Noise < 10Hz/cm
22% %
A A HV 9.2kV
HV 9.2kV
AS
Cosmic Tests : Andrey 4 Checklists
At different stages of production
Waiting for Final Destination: Point 5
Version Number
Description Author Date
0.1 First draft about RPC sub-detector description and related database requirements after having discussion with Frank Glege, Anil Kumar, Saima Iqbal and Marcello
Abbrescia
Archana
Sharma 31-JAN-2005
0.2 Initial draft provided by Archana Sharma is edited to add the configuration database requirements jointly for Forward (Endcap) RPC (requirements given by Archana Sharma) and for Barrel (given by Marcello Abbrescia)
and on the basis of discussions with Frank Glege, Andrew Branson and Norbert Zoltan Toth.
Saima Iqbal
14-Feb-2005
0.3 Comments to v0.2 by Archana Saima
+ Archana
15-Feb-2005
0.4 Comments to v0.3 by Marcello Saima +
Marcello
17-Feb-2005
0.5 Ambiguities mentioned in v0.2 resolved. Add Configuration database schema (Initial version is
provided after editing discussion based on requirements among Norbert, Andrew, Saima and
Marcello ) and add condition database schema requirements as provided by Marcello
Saima 06-Mar-2005
0.6 Question mentioned in V0.5 are resolves Saima 13-Mar-2005
Barrel and Forward (Endcap) RPC’s Configuration and Condition database requirements
for CMS Core DB Team
Document history - Following DB Workshop Jan 24-28
AS
Schema for RPC Barrel and Endcap
See Marcello’s talk – DB meeting
Wednesday 16 at 8.30
YE+2
YE+2
49m 10m
18m 15m
20m SX5 Cables & Services
horizontal distances inside SX5 Counting
House
(see next page)
YE+2
magnet test position
YE1
HB HB
Magnet Tests
10m
YE+1
6 RE1/2 Chambers (One sector 60o)
6 Link Boards available
AS
15m
8m SX5 Cable Paths to be defined
horizontal distances Counting House only
runcontrol
detectors magnet
DAQ
Counting House The Green Barrack