• Non ci sono risultati.

0. Notice on proprietary information contained in this thesis

N/A
N/A
Protected

Academic year: 2021

Condividi "0. Notice on proprietary information contained in this thesis"

Copied!
1
0
0

Testo completo

(1)

11

0. Notice on proprietary information contained in this

thesis

One of the EPR™ reactor main features and point of strength in its design is its renewed, reviewed and highly updated I&C system.

It is hence clear that most of its competitiveness and innovation rely on this system.

This thesis work deals just with this system and in order not to damage the economical interests of AREVA or publish proprietary content some of the information contained in this thesis have been omitted, deleted or obscured.

Riferimenti

Documenti correlati

In particular, examples of three different modes of coordination of hydroxamic acids with metal ions are reported and analyzed: from mononuclear complexes

In small ruminants, often the reality of husbandry is far different compared to other livestock rearing, especially in Mediterranean regions, where sheep husbandry

Another notable advantage introduced is the fact that the user would receive digital access copies specifically prepared for this process (for example, compressed and watermarked,

The main basic data needed for the preparation of the GHG inventory are energy statistics published by the Ministry of Economic Development Activities (MSE) in the National

The main national fire protection industries (Gielle and Gastec Vesta), which were involved also for the Survey about HFCs alternative substances with low GWP,

The Regions with the highest number of Industry and services local units located in high and very high landslide hazard zones are Campania, Toscana, Emilia-Romagna and Lazio.

Il lavoro presente riguarda lo sviluppo e la validazione sperimentale di un modello di combustione multi-zona per applicazioni a motori Diesel Common Rail, finalizzato al

In this context, the contributions of this thesis are the following: I was able to (1) identify the key collaborative requirements analysing a real use case of two engineering