Dynamic simulation of BACS (Building Automation and Control Systems) for the energy retrofitting of a secondary school

N/A
N/A
Protected

Academic year: 2021

Condividi "Dynamic simulation of BACS (Building Automation and Control Systems) for the energy retrofitting of a secondary school"

Copied!
9
0
0

Testo completo

(1)
(2)

  

Figure 2 Exploded school model Figure 1 Main references divided in categories

(3)

Table 1

Construction elements U-values

Figure 3 Weekly schedule of a typical classroom; 0 and 1 are the possible presence factors

(4)

Table 2 Internal gains

Figure 4 air changes rate per hour in a typical classroom

(5)

Table 3

Control function analysis of a BAC solution (thermostatic valve)

(6)

   

(7)

Figure 7 Primary energy requirements of the radiators base case and system upgrades

Table 4

Primary energy variations by end uses for radiators system and fan coils system

Figure 8 Spider graph of the end uses. Fan coils base case compared with fan coils combined package

Figure 9 Primary energy requirements of the fan coils base case and system upgrades

(8)

Table 5 Energy expenditure.

(9)

Riferimenti

Documenti correlati

Thus, after having examinated paradigms, learning and educational theories, and conceptual reconstruction (chapter II), an educational research was designed according to

E quindi dal momento che gli esponenti della linea genealogica di Montaccianico ricorsero all’utilizzo di Leitnamen si è resa necessaria l’adozione della medesima numera-

Objective: To analyze changes in T-helper (Th) subsets, T-regulatory (Treg) cell percentages and function, and mRNA levels of immunologically relevant molecules during a

1) Τῶν δὲ δημηγορικῶν λόγων τεθαύμακα μὲν τὸν ἐν τῇ πρώτῃ βύβλῳ ῥηθέντα ἐν Ἀθήναις ὑπὸ Περικλέους περὶ τοῦ μὴ εἴκειν Λακεδαιμονίοις, τὸν ἔχοντα τήνδε τὴν ἀρχήν “Τῆς

Inserendosi all’interno del contesto monumentale tra piazza Venezia e piazza Madonna di Loreto, la scelta architettonica adottata in questo progetto per la copertura

Lo schema di piano redatto dal Petrucci prevede la riorganizzazione dell'intera città attraverso la individuazione di una rete stradale principale, lo spostamento della stazione

Referring to hot water installations, according to the Regulation of the Minister of Infrastructure with regard to technical conditions which buildings and their location should

The goal of the first phase of planned upgrades to MagAO is to increase speed to 2000 Hz, control 450 modes, and reduce residual jitter from 8 mas to 4 mas.. Here we describe