• Non ci sono risultati.

•The SVT Long Term Task Force (N.Roe-F.Forti co-chairs) started its work on three major topics: •Change in the SVT Management: SVT

N/A
N/A
Protected

Academic year: 2021

Condividi "•The SVT Long Term Task Force (N.Roe-F.Forti co-chairs) started its work on three major topics: •Change in the SVT Management: SVT"

Copied!
2
0
0

Testo completo

(1)

1

SVT

• Change in the SVT Management:

– Claudio Campagnari is resigning as co-system

manager after more than three years of excellent service. Many thanks to Claudio!

– Doug Roberts is the new co-system manager starting from this meeting.

• The SVT Long Term Task Force (N.Roe-F.Forti co-chairs) started its work on three major

topics:

– 2005 module replacement and SVT Rotation

– SVT Lifetime and Performance in the next years – SVTRAD upgrade

(2)

2

SVT

• SVT is running smoothly:

– We rarely have failures

– Fixed several minor problems (HTEMP reset)

– A few chiller trips seem related to AC power noise;

we will install an AC filtering system

• Register corruption in ROMs definitely fixed by ODF after rewriting the firmware

• Background level relatively high due to vacuum problems in PEP although within the budget.

• Module Status: FL5M02-z single chip failure seen

in Feb. 03 seems recovered in the latest test.

Riferimenti

Documenti correlati

The evolving external threat environment is impacting the internal political dynamics of NATO nations and is accentuating a series of already existing trends – differences in

The ILS seeks to play a leadership role in the development of international stand- ards for water safety signs and beach safety flags through its member federa- tions, which are

Recommendations for a first aid course for the aquatic environment Basic water life supportaBasicAdvancedHealthcare providerse Lay person (no AF)bLay person (with AF)c AB

Ma sesprecheremo l fondi europei per progetti vecchi e chiaro che tutto questo non si realirzerá F nelle nostre mani costruire un mondo di- verso., dobbiamo dircelo

Attraverso le lezioni di giornalisti esperti del mondo della scuola vengono forniti agli studenti gli strumenti per realizzare articoli, interviste e video per

Connect the Milpac connector to the matching card and perform a resistances test to verify the proper insertion of the tail, reinsert it if there is bad connection.. Never power

• ROOT is chosen as development and Gui tool for the client side and functionality to user code is provided by a set of shared libraries that are loaded in a root

•  PA0 test production @ Taiyo can start as soon as we sign-off the production drawings produced by Taiyo & circulated on Tue.. –  Markus or someone else can carefully