• Non ci sono risultati.

PROJECT - PART 1

N/A
N/A
Protected

Academic year: 2021

Condividi "PROJECT - PART 1"

Copied!
1
0
0

Testo completo

(1)

CHAPTER 5 :

PROJECT - PART 1

FLOOR PLAN : GROUND FLOOR AREA SCALE: 1-50

AREAS:

. ROOM 1: MODEL ROOM

. ROOM 2: MEDIA ROOM - LOCKERS . ROOM 3: FLYERS ROOM

. ROOM 4: EXIT ROOM

. ROOM 5: COFFEE PLACE / BAR . ROOM 6: SERVICES - DEPOSITS

. ROOM 7: COVER COURTYARD - GIFT SHOP

1 3 2

4 5 6

7

THESIS : A new path for the access of the Ducal Palace SUPERVISOR PROF. : Vittorio Longheu STUDENT: Federico J. Gancedo 849791

Riferimenti

Documenti correlati

This was verified by a direct comparison between a live B-format recording made in the Teatro Comunale in Ferrara of a piano concert, which was then compared with the

ƒ ƒ The The “ “ harmonic harmonic orders orders ” ” impulse impulse responses responses obtained obtained by by the the exponential exponential sine sine sweep sweep

Based on an analysis of the millions of careers represented in the Burning Glass Technologies resume database, we found that entry-level workers in both Booster and

Within this general classification, we must consider pre-processing techniques that are used to contrast the audible distortions caused by equalization errors due to the

Garantire la corretta somministrazione di liquidi Garantire l'esecuzione di esami diagnostici. Deplezione

Nel 2015 la Commissione Europea ha pubblicato il rapporto Towards an EU Research and Innovation policy agenda for Nature-Based Solutions and Re-Naturing Cities nel quale sono

According to timing of metastasis presentation/treat- ment, patients were divided into 3 groups: “synchronous combined surgery” that included patients who underwent combined surgery

There should be three separated areas adjoin- ing the operating area: changing and dressing room for staff, entrance separated from the exit for patients, and the third area