DAFNE INJECTION SYSTEM AND LAYOUT http://www.lnf.infn.it/acceleratori/dafne/injection.html

1 di 3 08/05/2006 17.26

INJECTION SYSTEM AND LAYOUT

Modification of the ADONE hall for the installation of the DAFNE Main Rings and experiments.

In order to gain substantial saving of funds and construction time, the double ring collider and its injector system have been designed to cope with the buildings where ADONE was installed. After the final shut down in April 1993, the old storage ring, its injector Linac, the transfer lines from the Linac to the storage ring and all the experimental beamlines were dismantled and the buildings completely renovated to host the new accelerator complex.

(2)

DAFNE INJECTION SYSTEM AND LAYOUT http://www.lnf.infn.it/acceleratori/dafne/injection.html

2 di 3 08/05/2006 17.26

Schematic layout of the DAFNE accelerator complex.

The injection system of DAFNE consists of a Linac, an intermediate Accumulator Ring, and ~180 m of Transfer Lines from the Linac to the Accumulator and from the Accumulator to the Main Rings. This rather long and complicated arrangement was dictated by the necessity of utilising the existing buildings, keeping new civil constructions at a minimum. The new Linac and its power supplies are located in the old Linac building. The Accumulator with its transfer lines is installed in an experimental hall, where the old Linac beam was extracted and used for nuclear physics experiments. The Main Rings are assembled in the ADONE hall, where two large reinforced pits, decoupled from the accelerator floor, have been built to host the large and heavy magnetic detectors of KLOE and FINUDA.

(3)

DAFNE INJECTION SYSTEM AND LAYOUT http://www.lnf.infn.it/acceleratori/dafne/injection.html

3 di 3 08/05/2006 17.26

The DAFNE injection system has been designed to fill in few minutes from scratch the large required current in the Main Rings in the single bunch mode in order to ensure the maximum flexibility in the stored bunch patterns. The whole system runs at the operating energy of the collider, so that the current decay (mainly due to the Touschek effect) can be compensated by refilling the rings on top of the already circulating current (this injection mode is called "topping up").

The injection scheme is the following:

Positrons are accelerated in the Linac (converter target in) in 10 ns pulses at 50 Hz Positrons are injected into a single Accumulator bunch up to a pre-set current

The positron beam is cooled down in the Accumulator by waiting for 5 damping times (~100 ms) The positron bunch is extracted from the Accumulator and injected into the positron Main Ring The sequence is repeated for all the bunches to be injected into the positron Main Ring

Separators are switched on to separate the beams at the crossing point

The converted target is extracted and the whole sequence is repeated for the electrons Separators are switched off and beams are brought into collision.

M.Preger 21 MAR 1997

Riferimenti

Documenti correlati

instructors and learners: during the design phase, it is important to “space” in the definition of learning tasks; moreover, automatically subsuming cognitive processes and

The developed chamber (i) integrates two electrodes for the electrical stimulation of 3D cardiac constructs; (ii) fits in an incubator-compatible oscillating perfusion bioreactor

In the following work, I will complete the calculation and calibration of α- enhanced models. Beside the α-enhanced metal mixtures of 47Tuc, evolutionary tracks and isochrones based

The data-driven GPP data correspond to the MPI-BGC model (27), the process-based GPP corresponds to the median of an ensemble of 10 global dynamic vegetation models from the Trendy

Genes differentially expressed in the normal and Dlx5-/- developing murine olfactory system, prioritized using human KS-causing genes and the coexpression network.. regulator

This study investigated the influence of some personal and job resources and of some job demands on the three dimensions (absorption, work enjoyment, intrinsic work motivation)

Monitoring shipments along intermodal chains is crucial to ensuring the fast, reliable and secure transport of goods. In this regard, the paper describes the results of

Abbreviations: PT: Physical Treatment group; CT: Cognitive Treatment group; CTRL: Control group; DCT: Digit Cancellation Test, ADAS-Cog: Cognitive section of the Alzheimer’s